Evaluation of maintenance management through the overall equipment effectiveness of a yogurt production line in a medium-sized Italian company

Abrir fuente

1Ficha bibliográfica

Autores
Panagiotis Tsarouhas
Año
2015
Publicación
International Journal of Productivity and Quality Management
País
Italy
Segmento
Productos lácteos
Familia de procesos
Fermentación
Tipo de estudio
Estudio de caso único
Alcance de la extracción
Solo resumen
Tamaño
1 plantas · 1 líneas · — máquinas
Periodo de observación
900 días
Recolección de datos
not_reported
Intervención
Ver el contexto tal como lo describe el estudio
The aim of this paper is to study the overall effectiveness equipment (OEE) as a metric for evaluating the progress of TPM of a yogurt production line in a medium-sized Italian company.

2Riesgo de sesgo

Puntuado con la rúbrica del protocolo: 2 preocupación baja, 1 algunas preocupaciones, 0 preocupación alta.
Puntuación total 8Riesgo moderado
ÍtemPuntuación
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product or sector is given but the equipment or process is only partly described.1 / 2
Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events).2 / 2
How were loss data collected?Interviews, estimates, or method not reported.0 / 2
Are OEE, loading time and the loss categories defined explicitly?No definition; metrics are reported as bare numbers.0 / 2
Does the loss breakdown account for the total loss it claims to explain?Only selected causes are reported and the total is unknown.0 / 2
Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method.2 / 2
Are the reported numbers internally consistent?Small inconsistencies (2 to 10 percentage points) or values that cannot be cross-checked.1 / 2
Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result.2 / 2

3Datos extraídos

Cada dato con su clasificación y la cita textual que lo establece.
Causa reportadaCategoría de pérdidaMétricaValorExtracción
—
Ver cita textual (abstract)
the availability of the production line is 97.32%, whereas the maintenance time ratio is 0.02746
noneDisponibilidad97.3 %Ambos extractores coincidieron
—
Ver cita textual (abstract)
the overall OEE performance of the line is 92.086% and therefore falls in word-class firms
noneOEE92.1 %Ambos extractores coincidieron
failure
Ver cita textual (abstract)
in the production line there is a failure every 190 minutes that needs about five minutes to repair
Fallas de equipo (averías)Tiempo entre eventos190 minAmbos extractores coincidieron
—
Ver cita textual (ABSTRACT)
whereas the maintenance time ratio is 0.02746
Paro planificado (mantenimiento programado, descansos, sin demanda)Proporción del tiempo planificado0.0275 ratioUn solo extractor

Unidades de observación

  • yogurt production line · Fermentación · Línea base
  • yogurt production line · Línea completa o equipo sin especificar · Línea base