Production Model to increase OEE through the application of Lean Manufacturing and Total Production Maintenance tools in animal feed manufacturing SMEs

Abrir fuente

1Ficha bibliográfica

Autores
Angelo Paolo Espinoza-Monge, Yibely Alexandra Zenteno-Correa, Juan Carlos Quiroz-Flores, Martin Fidel Collao-Diaz
Año
2023
Publicación
International Conference on Industrial Engineering and Operations Management (IEOM)
País
Peru
Segmento
Alimento animal y para mascotas
Familia de procesos
Faena, corte y procesamiento primario
Tipo de estudio
Estudio de caso único
Alcance de la extracción
Texto completo
Tamaño
1 plantas · 1 líneas · 4 máquinas
Periodo de observación
—
Recolección de datos
questionnaire
Intervención
Ver el contexto tal como lo describe el estudio
This scientific article will study the case of a company dedicated to the Production of Feed for Animals that shows problems in the level of its operating performance.

2Riesgo de sesgo

Puntuado con la rúbrica del protocolo: 2 preocupación baja, 1 algunas preocupaciones, 0 preocupación alta.
Puntuación total 8Riesgo moderado
ÍtemPuntuación
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product or sector is given but the equipment or process is only partly described.1 / 2
Is the observation period long enough and reported?Period reported but shorter than 30 days, or only the number of shifts is given.1 / 2
How were loss data collected?Interviews, estimates, or method not reported.0 / 2
Are OEE, loading time and the loss categories defined explicitly?A standard definition is cited but its application is not shown.1 / 2
Does the loss breakdown account for the total loss it claims to explain?The reported causes or categories sum to at least 90% of the stated total, or an explicit "other" class closes the balance.2 / 2
Is there evidence of selective reporting of favourable results?Intervention study in which baseline and post-intervention periods differ in length or method.1 / 2
Are the reported numbers internally consistent?Inconsistencies above 10 percentage points, or OEE factors above 100%.0 / 2
Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result.2 / 2

3Datos extraídos

Cada dato con su clasificación y la cita textual que lo establece.
Causa reportadaCategoría de pérdidaMétricaValorExtracción
—
Ver cita textual (Table 3)
MTTR 3.54 MTBF 4.523 Availability 56.10%
Fallas de equipo (averías)Tiempo entre eventos4.52 not reportedAmbos extractores coincidieron
—
Ver cita textual (Table 3)
MTTR 3.54 MTBF 4.523 Availability 56.10%
Fallas de equipo (averías)Duración media del evento3.54 not reportedAmbos extractores coincidieron
crusher clogging due to very large stonescrusher
Ver cita textual (Section 5.1)
the crusher clogging due to very large stones represents a lower percentage of 19.88%, which makes visible how this cause affects the indicator.
Microparos y esperasProporción del tiempo perdido19.9 %Adjudicado
lack of raw material and supplies
Ver cita textual (Section 5.1)
there is the lack of raw material and supplies, which generates a 29.96% of the low performance because of the poor management of these.
Paros organizacionales o externos (falta de material o personal, corte de servicios)Proporción del tiempo perdido30.0 %Ambos extractores coincidieron
maintenance problems
Ver cita textual (Section 5.1)
there is a 50.16% for maintenance problems, which is shown in the graphic it is the cause possessing the highest percentage, affecting more the company performance on the productive part.
Fallas de equipo (averías)Proporción del tiempo perdido50.2 %Ambos extractores coincidieron
—
Ver cita textual (Table 1)
Quality > 99% Perfect orders Total orders 𝑥𝑥 100 77,54% Indicator is lower than established goal, requires measures
noneCalidad77.5 %Ambos extractores coincidieron
—
Ver cita textual (Table 1)
Performance > 95% Actual monthly production Programmed monthly production 𝑥𝑥 100 68,75% Productivity lower than goal. Requires measures
noneRendimiento68.8 %Ambos extractores coincidieron
—
Ver cita textual (Table 1)
Availability 90% T. Available −React. Mnt. −Planned Mnt. T. Available −React. Mnt. 𝑥𝑥 100 56.10% Value is too far from the goal, requires measures
noneDisponibilidad56.1 %Ambos extractores coincidieron
—
Ver cita textual (Table 1)
Overall Equipment Effectiveness 85% Performance 𝑥𝑥 Quality 𝑥𝑥 Availability 29,90% Value reached is too far from the goal set, requires measures
noneOEE29.9 %Ambos extractores coincidieron
—
Ver cita textual (Table 2)
Total Annual Production (Tn) 11255 10979 10725 Programmed Annual (Tn) 15200 15400 15600 Performance 74.05% 71.29% 68.75%
noneRendimiento74.1 %Un solo extractor
—
Ver cita textual (Table 2)
Total Annual Production (Tn) 11255 10979 10725 Programmed Annual (Tn) 15200 15400 15600 Performance 74.05% 71.29% 68.75%
noneRendimiento71.3 %Un solo extractor
Reactive Maintenance
Ver cita textual (Table 4)
Reactive Maintenance Man-Hours 1340 11,390
Fallas de equipo (averías)Tiempo perdido1,340 hUn solo extractor

Unidades de observación

  • whole plant · Línea completa o equipo sin especificar · Línea base