Estudio incluido
Reliability-Centered Maintenance Model to Improve OEE in a Mass-Consumption Food Company: A Case Study from Peru
1Ficha bibliográfica
- Autores
- Sebastian Enrique Maceda-Cabrejo, Mauricio Ivan Velazco-Gomez, Richard Nicholas Meza-Ortiz
- Año
- 2025
- Publicación
- International Journal of Industrial Engineering
- País
- Peru
- Segmento
- Panadería y pastas
- Familia de procesos
- Formado, horneado y cocción
- Tipo de estudio
- Intervención antes/después
- Alcance de la extracción
- Texto completo
- Tamaño
- 1 plantas · 1 líneas · 20 máquinas
- Periodo de observación
- 120 días
- Recolección de datos
- maintenance_records
- Intervención
Ver el contexto tal como lo describe el estudio
The diagnosis conducted in the case study identified the central problem as a low Overall Equipment Effectiveness (OEE) in the filled cookie production line, with an initial level of only 57.93%, revealing a technical gap in relation to the target of 80%.
2Riesgo de sesgo
Puntuado con la rúbrica del protocolo: 2 preocupación baja, 1 algunas preocupaciones, 0 preocupación alta.
Puntuación total 10Riesgo moderado
| Ítem | Puntuación |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described. | 2 / 2 |
| Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events). | 2 / 2 |
| How were loss data collected?Manual logs or maintenance records with unknown completeness. | 1 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?No definition; metrics are reported as bare numbers. | 0 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?The reported causes or categories sum to at least 90% of the stated total, or an explicit "other" class closes the balance. | 2 / 2 |
| Is there evidence of selective reporting of favourable results?Intervention study in which baseline and post-intervention periods differ in length or method. | 1 / 2 |
| Are the reported numbers internally consistent?Inconsistencies above 10 percentage points, or OEE factors above 100%. | 0 / 2 |
| Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result. | 2 / 2 |
3Datos extraídos
Cada dato con su clasificación y la cita textual que lo establece.
| Causa reportada | Categoría de pérdida | Métrica | Valor | Extracción |
|---|---|---|---|---|
—Ver cita textual (Table 4)Production Line Performance Rate % 77.74% 90% 86.14% 10.81% | none | Rendimiento | 77.7 % | Ambos extractores coincidieron |
—Ver cita textual (Table 4)Defective Product Rate % 2.04% 1% 1.21% -40.69% | Defectos de proceso (desecho y reproceso) | Tasa de defectos | 2.04 % | Ambos extractores coincidieron |
—Ver cita textual (Table 4)OEE % 57.93% 80% 75.67% 30.62% | none | OEE | 57.9 % | Ambos extractores coincidieron |
—Ver cita textual (Table 4)Production Line Performance Rate % 77.74% 90% 86.14% 10.81% | none | Rendimiento | 86.1 % | Ambos extractores coincidieron |
—Ver cita textual (Table 4)Defective Product Rate % 2.04% 1% 1.21% -40.69% | Defectos de proceso (desecho y reproceso) | Tasa de defectos | 1.21 % | Ambos extractores coincidieron |
Failure Downtime RateVer cita textual (Table 4)Failure Downtime Rate % 23.53% 12% 13.86% -41.10% | Fallas de equipo (averías) | Proporción del tiempo perdido | 23.5 % | Un solo extractor |
production line stoppagesVer cita textual (Section 4.2 Initial Diagnosis)The analysis revealed three main reasons contributing to this issue: production line stoppages accounted for 49.2% of the problem, followed by low operational performance with a contribution of 46.5%, and a smaller share of 4.3% attributed to defective products. | Fallas de equipo (averías) | Proporción del tiempo perdido | 49.2 % | Un solo extractor |
low operational performanceVer cita textual (Section 4.2 Initial Diagnosis)The analysis revealed three main reasons contributing to this issue: production line stoppages accounted for 49.2% of the problem, followed by low operational performance with a contribution of 46.5%, and a smaller share of 4.3% attributed to defective products. | Velocidad reducida | Proporción del tiempo perdido | 46.5 % | Un solo extractor |
defective productsVer cita textual (Section 4.2 Initial Diagnosis)The analysis revealed three main reasons contributing to this issue: production line stoppages accounted for 49.2% of the problem, followed by low operational performance with a contribution of 46.5%, and a smaller share of 4.3% attributed to defective products. | Defectos de proceso (desecho y reproceso) | Proporción del tiempo perdido | 4.30 % | Un solo extractor |
mechanical and electrical failuresVer cita textual (Section 4.2 Initial Diagnosis)These reasons were linked to specific root causes: mechanical and electrical failures explained 30.2% of the stoppages, while instrumentation faults represented 19%. | Fallas de equipo (averías) | Proporción del tiempo perdido | 30.2 % | Un solo extractor |
instrumentation faultsVer cita textual (Section 4.2 Initial Diagnosis)These reasons were linked to specific root causes: mechanical and electrical failures explained 30.2% of the stoppages, while instrumentation faults represented 19%. | Fallas de equipo (averías) | Proporción del tiempo perdido | 19.0 % | Un solo extractor |
improper adjustment of the sealing systemsealing systemVer cita textual (Section 4.2 Initial Diagnosis)Additionally, 46.5% of the low performance was due to improper adjustment of the sealing system, and the presence of defective products was associated with wear on the magazine chain of the primary packaging machine, accounting for 4.3%. | Velocidad reducida | Proporción del tiempo perdido | 46.5 % | Un solo extractor |
wear on the magazine chain of the primary packaging machineprimary packaging machineVer cita textual (Section 4.2 Initial Diagnosis)Additionally, 46.5% of the low performance was due to improper adjustment of the sealing system, and the presence of defective products was associated with wear on the magazine chain of the primary packaging machine, accounting for 4.3%. | Defectos de proceso (desecho y reproceso) | Proporción del tiempo perdido | 4.30 % | Un solo extractor |
—Ver cita textual (Section 6 Conclusion)The implementation yielded meaningful operational gains, including a 20.7% reduction in production line downtime and a notable improvement in OEE from 45.6% to 65.5%. | none | OEE | 45.6 % | Un solo extractor |
—Ver cita textual (Table 4)OEE % 57.93% 80% 75.67% 30.62% | none | OEE | 75.7 % | Un solo extractor |
Failure Downtime RateVer cita textual (Table 4)Failure Downtime Rate % 23.53% 12% 13.86% -41.10% | Fallas de equipo (averías) | Proporción del tiempo perdido | 13.9 % | Un solo extractor |
—Ver cita textual (Section 6 Conclusion)The implementation yielded meaningful operational gains, including a 20.7% reduction in production line downtime and a notable improvement in OEE from 45.6% to 65.5%. | none | OEE | 65.5 % | Un solo extractor |
—Ver cita textual (Table 4, page 8)Failure Downtime Rate % 23.53% | Fallas de equipo (averías) | Proporción del tiempo planificado | 23.5 % | Un solo extractor |
—Ver cita textual (Table 4, page 8)Failure Downtime Rate % 13.86% | Fallas de equipo (averías) | Proporción del tiempo planificado | 13.9 % | Un solo extractor |
Unidades de observación
- Filled cookie production line · Línea completa o equipo sin especificar · Línea base
- Filled cookie production line · Línea completa o equipo sin especificar · Después de la intervención