Reliability-Centered Maintenance Model to Improve OEE in a Mass-Consumption Food Company: A Case Study from Peru

Abrir fuente

1Ficha bibliográfica

Autores
Sebastian Enrique Maceda-Cabrejo, Mauricio Ivan Velazco-Gomez, Richard Nicholas Meza-Ortiz
Año
2025
Publicación
International Journal of Industrial Engineering
País
Peru
Segmento
Panadería y pastas
Familia de procesos
Formado, horneado y cocción
Tipo de estudio
Intervención antes/después
Alcance de la extracción
Texto completo
Tamaño
1 plantas · 1 líneas · 20 máquinas
Periodo de observación
120 días
Recolección de datos
maintenance_records
Intervención
Ver el contexto tal como lo describe el estudio
The diagnosis conducted in the case study identified the central problem as a low Overall Equipment Effectiveness (OEE) in the filled cookie production line, with an initial level of only 57.93%, revealing a technical gap in relation to the target of 80%.

2Riesgo de sesgo

Puntuado con la rúbrica del protocolo: 2 preocupación baja, 1 algunas preocupaciones, 0 preocupación alta.
Puntuación total 10Riesgo moderado
ÍtemPuntuación
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described.2 / 2
Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events).2 / 2
How were loss data collected?Manual logs or maintenance records with unknown completeness.1 / 2
Are OEE, loading time and the loss categories defined explicitly?No definition; metrics are reported as bare numbers.0 / 2
Does the loss breakdown account for the total loss it claims to explain?The reported causes or categories sum to at least 90% of the stated total, or an explicit "other" class closes the balance.2 / 2
Is there evidence of selective reporting of favourable results?Intervention study in which baseline and post-intervention periods differ in length or method.1 / 2
Are the reported numbers internally consistent?Inconsistencies above 10 percentage points, or OEE factors above 100%.0 / 2
Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result.2 / 2

3Datos extraídos

Cada dato con su clasificación y la cita textual que lo establece.
Causa reportadaCategoría de pérdidaMétricaValorExtracción
—
Ver cita textual (Table 4)
Production Line Performance Rate % 77.74% 90% 86.14% 10.81%
noneRendimiento77.7 %Ambos extractores coincidieron
—
Ver cita textual (Table 4)
Defective Product Rate % 2.04% 1% 1.21% -40.69%
Defectos de proceso (desecho y reproceso)Tasa de defectos2.04 %Ambos extractores coincidieron
—
Ver cita textual (Table 4)
OEE % 57.93% 80% 75.67% 30.62%
noneOEE57.9 %Ambos extractores coincidieron
—
Ver cita textual (Table 4)
Production Line Performance Rate % 77.74% 90% 86.14% 10.81%
noneRendimiento86.1 %Ambos extractores coincidieron
—
Ver cita textual (Table 4)
Defective Product Rate % 2.04% 1% 1.21% -40.69%
Defectos de proceso (desecho y reproceso)Tasa de defectos1.21 %Ambos extractores coincidieron
Failure Downtime Rate
Ver cita textual (Table 4)
Failure Downtime Rate % 23.53% 12% 13.86% -41.10%
Fallas de equipo (averías)Proporción del tiempo perdido23.5 %Un solo extractor
production line stoppages
Ver cita textual (Section 4.2 Initial Diagnosis)
The analysis revealed three main reasons contributing to this issue: production line stoppages accounted for 49.2% of the problem, followed by low operational performance with a contribution of 46.5%, and a smaller share of 4.3% attributed to defective products.
Fallas de equipo (averías)Proporción del tiempo perdido49.2 %Un solo extractor
low operational performance
Ver cita textual (Section 4.2 Initial Diagnosis)
The analysis revealed three main reasons contributing to this issue: production line stoppages accounted for 49.2% of the problem, followed by low operational performance with a contribution of 46.5%, and a smaller share of 4.3% attributed to defective products.
Velocidad reducidaProporción del tiempo perdido46.5 %Un solo extractor
defective products
Ver cita textual (Section 4.2 Initial Diagnosis)
The analysis revealed three main reasons contributing to this issue: production line stoppages accounted for 49.2% of the problem, followed by low operational performance with a contribution of 46.5%, and a smaller share of 4.3% attributed to defective products.
Defectos de proceso (desecho y reproceso)Proporción del tiempo perdido4.30 %Un solo extractor
mechanical and electrical failures
Ver cita textual (Section 4.2 Initial Diagnosis)
These reasons were linked to specific root causes: mechanical and electrical failures explained 30.2% of the stoppages, while instrumentation faults represented 19%.
Fallas de equipo (averías)Proporción del tiempo perdido30.2 %Un solo extractor
instrumentation faults
Ver cita textual (Section 4.2 Initial Diagnosis)
These reasons were linked to specific root causes: mechanical and electrical failures explained 30.2% of the stoppages, while instrumentation faults represented 19%.
Fallas de equipo (averías)Proporción del tiempo perdido19.0 %Un solo extractor
improper adjustment of the sealing systemsealing system
Ver cita textual (Section 4.2 Initial Diagnosis)
Additionally, 46.5% of the low performance was due to improper adjustment of the sealing system, and the presence of defective products was associated with wear on the magazine chain of the primary packaging machine, accounting for 4.3%.
Velocidad reducidaProporción del tiempo perdido46.5 %Un solo extractor
wear on the magazine chain of the primary packaging machineprimary packaging machine
Ver cita textual (Section 4.2 Initial Diagnosis)
Additionally, 46.5% of the low performance was due to improper adjustment of the sealing system, and the presence of defective products was associated with wear on the magazine chain of the primary packaging machine, accounting for 4.3%.
Defectos de proceso (desecho y reproceso)Proporción del tiempo perdido4.30 %Un solo extractor
—
Ver cita textual (Section 6 Conclusion)
The implementation yielded meaningful operational gains, including a 20.7% reduction in production line downtime and a notable improvement in OEE from 45.6% to 65.5%.
noneOEE45.6 %Un solo extractor
—
Ver cita textual (Table 4)
OEE % 57.93% 80% 75.67% 30.62%
noneOEE75.7 %Un solo extractor
Failure Downtime Rate
Ver cita textual (Table 4)
Failure Downtime Rate % 23.53% 12% 13.86% -41.10%
Fallas de equipo (averías)Proporción del tiempo perdido13.9 %Un solo extractor
—
Ver cita textual (Section 6 Conclusion)
The implementation yielded meaningful operational gains, including a 20.7% reduction in production line downtime and a notable improvement in OEE from 45.6% to 65.5%.
noneOEE65.5 %Un solo extractor
—
Ver cita textual (Table 4, page 8)
Failure Downtime Rate % 23.53%
Fallas de equipo (averías)Proporción del tiempo planificado23.5 %Un solo extractor
—
Ver cita textual (Table 4, page 8)
Failure Downtime Rate % 13.86%
Fallas de equipo (averías)Proporción del tiempo planificado13.9 %Un solo extractor

Unidades de observación

  • Filled cookie production line · Línea completa o equipo sin especificar · Línea base
  • Filled cookie production line · Línea completa o equipo sin especificar · Después de la intervención