Estudio incluido
Machine Learning, MRP, and Lean Tools as an Internal Innovation Strategy to Improve Efficiency in a Bottling Company
1Ficha bibliográfica
- Autores
- Haydee Manuelo, Hellyn Ruiz, Martin Saenz-Moron, Anita Straujuma
- Año
- 2025
- Publicación
- LACCEI International Multiconference on Entrepreneurship, Innovation and Regional Development (LEIRD)
- País
- Peru
- Segmento
- Refrescos, agua embotellada y jugos
- Familia de procesos
- Línea de llenado y envasado
- Tipo de estudio
- Intervención antes/después
- Alcance de la extracción
- Texto completo
- Tamaño
- 1 plantas · 1 líneas · — máquinas
- Periodo de observación
- 84 días
- Recolección de datos
- manual_logs
- Intervención
Ver el contexto tal como lo describe el estudio
This format accounts for 94.48% of the company's total production volume, representing a critical point of intervention in its production management.
2Riesgo de sesgo
Puntuado con la rúbrica del protocolo: 2 preocupación baja, 1 algunas preocupaciones, 0 preocupación alta.
Puntuación total 11Riesgo moderado
| Ítem | Puntuación |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described. | 2 / 2 |
| Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events). | 2 / 2 |
| How were loss data collected?Manual logs or maintenance records with unknown completeness. | 1 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?A standard definition is cited but its application is not shown. | 1 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?Only the top causes are reported and the unexplained remainder can be computed. | 1 / 2 |
| Is there evidence of selective reporting of favourable results?Intervention study in which baseline and post-intervention periods differ in length or method. | 1 / 2 |
| Are the reported numbers internally consistent?Small inconsistencies (2 to 10 percentage points) or values that cannot be cross-checked. | 1 / 2 |
| Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result. | 2 / 2 |
3Datos extraídos
Cada dato con su clasificación y la cita textual que lo establece.
| Causa reportada | Categoría de pérdida | Métrica | Valor | Extracción |
|---|---|---|---|---|
—sealing machineVer cita textual (Section V.B.3)After the implementation of autonomous maintenance, this value increased to 41.13 hours, representing an absolute improvement of 17.65 hours. | Fallas de equipo (averías) | Tiempo entre eventos | 41.1 h | Adjudicado |
—sealing machineVer cita textual (Section V.B.3)At the beginning of the study, the recorded MTBF was 23.48 hours. | Fallas de equipo (averías) | Tiempo entre eventos | 23.5 h | Adjudicado |
—Ver cita textual (Conclusions)The application of the proposed management model increased production efficiency from 75% to 86%, evidencing an 11% improvement that contributed to reducing bottlenecks and optimizing installed capacity. | none | OEE | 86.0 % | Ambos extractores coincidieron |
—Ver cita textual (Section III / Table I)Currently, the average efficiency of the production process is 75% (Table 1) | none | OEE | 75.0 % | Ambos extractores coincidieron |
—injection molding machineVer cita textual (Table VII)Availability (%) 89% 96% 97.17% | none | Disponibilidad | 97.2 % | Ambos extractores coincidieron |
—injection molding machineVer cita textual (Table VII)Availability (%) 89% 96% 97.17% | none | Disponibilidad | 89.0 % | Ambos extractores coincidieron |
lack of inputVer cita textual (Section III / Figure 1)Figure 1 shows that stoppages due to lack of input represent the main cause of loss, accounting for 49% of the total, followed by defects in the finished product and mechanical failures in the blow molding machines, which together amount to 83% of the total impact. | Paros organizacionales o externos (falta de material o personal, corte de servicios) | Proporción del tiempo perdido | 49.0 % | Un solo extractor |
—Ver cita textual (Section III / Figure 1)Figure 1 shows that stoppages due to lack of input represent the main cause of loss, accounting for 49% of the total, followed by defects in the finished product and mechanical failures in the blow molding machines, which together amount to 83% of the total impact. | No clasificable a partir del reporte | Proporción del tiempo perdido | 83.0 % | Un solo extractor |
reworkVer cita textual (Section V.B.2 / Table VI)In the initial process diagnosis, an inefficiency level of 19% was identified, reflecting high variability, rework, and bottlenecks. | Defectos de proceso (desecho y reproceso) | Tasa de defectos | 19.0 % | Un solo extractor |
reworkVer cita textual (Section V.B.2 / Table VI)With the validation of the pilot test, this value was reduced to 13%, representing a relative improvement of 32% compared to the initial condition. | Defectos de proceso (desecho y reproceso) | Tasa de defectos | 13.0 % | Un solo extractor |
—injection molding machineVer cita textual (Section V.B.3)During the development of the pilot test, a machine availability of 97.71% was achieved, exceeding the proposed target by 1.171%, as indicated in [7]. | none | Disponibilidad | 97.7 % | Un solo extractor |
—blow molding machinesVer cita textual (Conclusions)Autonomous maintenance raised the availability of blow moulding machines to 97.17% and improved the MTBF of the injection machine by 17.65 hours | none | Disponibilidad | 97.2 % | Un solo extractor |
—Ver cita textual (Table VI, STANDARDIZED WORK METRIC RESULTS)Standardized Work | Rework Rate (%) | 19% | 12% | 13% | Defectos de proceso (desecho y reproceso) | Tasa de defectos | 19.0 % | Un solo extractor |
lack of inputVer cita textual (Section V.B.1, Validation of MRP with Machine Learning)The average stockout rate in 2024 was 30.47%, significantly affecting production due to supply shortages. | Paros organizacionales o externos (falta de material o personal, corte de servicios) | Proporción del tiempo perdido | 30.5 % | Un solo extractor |
—Ver cita textual (Table VI, STANDARDIZED WORK METRIC RESULTS)Standardized Work | Rework Rate (%) | 19% | 12% | 13% | Defectos de proceso (desecho y reproceso) | Tasa de defectos | 13.0 % | Un solo extractor |
lack of inputVer cita textual (Section V.B.1, Validation of MRP with Machine Learning)With the validation of the MRP during the first quarter of 2025, the indicator decreased to 20.60% | Paros organizacionales o externos (falta de material o personal, corte de servicios) | Proporción del tiempo perdido | 20.6 % | Un solo extractor |
Unidades de observación
- Sealing machine · Tapado y cerrado · Después de la intervención
- Sealing machine · Tapado y cerrado · Línea base
- Whole plant · Línea completa o equipo sin especificar · Después de la intervención
- Whole plant · Línea completa o equipo sin especificar · Línea base
- Injection molding machine · Formado, moldeado y dosificado · Después de la intervención
- Injection molding machine · Formado, moldeado y dosificado · Línea base
- 8.5-liter bottling line · Línea completa o equipo sin especificar · Línea base
- 8.5-liter bottling line · Línea completa o equipo sin especificar · Después de la intervención
- Blow molding machines · Formado, moldeado y dosificado · Después de la intervención