Reliability-Based Maintenance Optimization for Transfer Carriage Station in Palm Oil Mills Using FMEA and Fishbone Analysis
1Ficha bibliográfica
- Autores
- Nadya Rishelin, Gustiarini Rika Putri, Galih Prakoso, Viky Kurnia Putri
- Año
- 2025
- Publicación
- Jurnal Teknik Industri Jurnal Hasil Penelitian dan Karya Ilmiah dalam Bidang Teknik Industri
- País
- —
- Segmento
- Molienda de granos y oleaginosas
- Familia de procesos
- Faena, corte y procesamiento primario
- Tipo de estudio
- Análisis de confiabilidad
- Alcance de la extracción
- Solo resumen
- Tamaño
- — plantas · 1 líneas · 1 máquinas
- Periodo de observación
- 210 días
- Recolección de datos
- maintenance_records
- Intervención
Ver el contexto tal como lo describe el estudio
Failures in the transfer carriage at the tippler station significantly disrupt material flow in palm oil mills, contributing to approximately 50% of total downtime during seven months of operation.
2Riesgo de sesgo
Puntuado con la rúbrica del protocolo: 2 preocupación baja, 1 algunas preocupaciones, 0 preocupación alta.
Puntuación total 9Riesgo moderado
| Ítem | Puntuación |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product or sector is given but the equipment or process is only partly described. | 1 / 2 |
| Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events). | 2 / 2 |
| How were loss data collected?Manual logs or maintenance records with unknown completeness. | 1 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?No definition; metrics are reported as bare numbers. | 0 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?Only selected causes are reported and the total is unknown. | 0 / 2 |
| Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method. | 2 / 2 |
| Are the reported numbers internally consistent?Small inconsistencies (2 to 10 percentage points) or values that cannot be cross-checked. | 1 / 2 |
| Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result. | 2 / 2 |
3Datos extraídos
Cada dato con su clasificación y la cita textual que lo establece.
| Causa reportada | Categoría de pérdida | Métrica | Valor | Extracción |
|---|---|---|---|---|
Failures in the transfer carriage at the tippler stationtransfer carriageVer cita textual (Abstract)Failures in the transfer carriage at the tippler station significantly disrupt material flow in palm oil mills, contributing to approximately 50% of total downtime during seven months of operation. | Fallas de equipo (averías) | Proporción del tiempo perdido | 50.0 % | Un solo extractor |
Unidades de observación
- Transfer carriage (tippler station) · Transporte y acumulación · Línea base