Exploring Lean Manufacturing Integration and Performance Evaluation for Process Optimization in the Food Processing Industry

Abrir fuente

1Ficha bibliográfica

Autores
Reema Al-Dalain
Año
2026
Publicación
Production Engineering Archives
País
Jordan
Segmento
Carne, aves y pescado
Familia de procesos
Faena, corte y procesamiento primario
Tipo de estudio
Estudio de caso único
Alcance de la extracción
Texto completo
Tamaño
1 plantas · 1 líneas · 6 máquinas
Periodo de observación
6 días
Recolección de datos
manual_logs
Intervención
Ver el contexto tal como lo describe el estudio
The framework is applied as a case study in a frozen food production line characterized by six sequential processing stages exhibiting wide ranging process reliability and significant change over time variability, providing an empirically rich context for examining how probabilistic analysis complement deterministic lean tools.

2Riesgo de sesgo

Puntuado con la rúbrica del protocolo: 2 preocupación baja, 1 algunas preocupaciones, 0 preocupación alta.
Puntuación total 9Riesgo moderado
ÍtemPuntuación
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product or sector is given but the equipment or process is only partly described.1 / 2
Is the observation period long enough and reported?Period reported but shorter than 30 days, or only the number of shifts is given.1 / 2
How were loss data collected?Manual logs or maintenance records with unknown completeness.1 / 2
Are OEE, loading time and the loss categories defined explicitly?No definition; metrics are reported as bare numbers.0 / 2
Does the loss breakdown account for the total loss it claims to explain?Only the top causes are reported and the unexplained remainder can be computed.1 / 2
Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method.2 / 2
Are the reported numbers internally consistent?Small inconsistencies (2 to 10 percentage points) or values that cannot be cross-checked.1 / 2
Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result.2 / 2

3Datos extraídos

Cada dato con su clasificación y la cita textual que lo establece.
Causa reportadaCategoría de pérdidaMétricaValorExtracción
—
Ver cita textual (Section 3.4 Value Stream Mapping)
The process begins with Thawing, which takes approximately 85 minutes of cycle time and an additional 42 minutes for changeovers, operating at a low 11% uptime, indicating substantial inefficiencies.
Setups y ajustesTiempo perdido42.0 minUn solo extractor
—
Ver cita textual (Section 3.4 Value Stream Mapping)
The process begins with Thawing, which takes approximately 85 minutes of cycle time and an additional 42 minutes for changeovers, operating at a low 11% uptime, indicating substantial inefficiencies.
noneDisponibilidad11.0 %Un solo extractor
—
Ver cita textual (Section 3.4 Value Stream Mapping)
Next, materials proceed to Marinating, with a 20-minute cycle time, 14-minute changeover, and an uptime of 70%, still reflecting limited operational effectiveness.
Setups y ajustesTiempo perdido14.0 minUn solo extractor
—
Ver cita textual (Section 3.4 Value Stream Mapping)
Next, materials proceed to Marinating, with a 20-minute cycle time, 14-minute changeover, and an uptime of 70%, still reflecting limited operational effectiveness.
noneDisponibilidad70.0 %Un solo extractor
—
Ver cita textual (Section 3.4 Value Stream Mapping)
The Compressing stage follows, requiring 25 minutes per cycle, 22 minutes for changeovers, and achieving 80% uptime.
Setups y ajustesTiempo perdido22.0 minUn solo extractor
—
Ver cita textual (Section 3.4 Value Stream Mapping)
The Compressing stage follows, requiring 25 minutes per cycle, 22 minutes for changeovers, and achieving 80% uptime.
noneDisponibilidad80.0 %Un solo extractor
—
Ver cita textual (Section 3.4 Value Stream Mapping)
In the Portioning (Trimming) process, performance improves, with a 55-minute cycle, 11-minute changeover, and a 90% uptime, marking a relatively stable operation.
Setups y ajustesTiempo perdido11.0 minUn solo extractor
—
Ver cita textual (Section 3.4 Value Stream Mapping)
In the Portioning (Trimming) process, performance improves, with a 55-minute cycle, 11-minute changeover, and a 90% uptime, marking a relatively stable operation.
noneDisponibilidad90.0 %Un solo extractor
—
Ver cita textual (Section 3.4 Value Stream Mapping)
The Shock Freeze stage is more efficient, with a 95-minute cycle, 9-minute changeover, and 95% uptime.
Setups y ajustesTiempo perdido9.00 minUn solo extractor
—
Ver cita textual (Section 3.4 Value Stream Mapping)
The Shock Freeze stage is more efficient, with a 95-minute cycle, 9-minute changeover, and 95% uptime.
noneDisponibilidad95.0 %Un solo extractor
—
Ver cita textual (Section 3.4 Value Stream Mapping)
Finally, in Packing, the process takes 85 minutes per cycle, 8 minutes for changeovers, and operates at 94% uptime before products are shipped.
Setups y ajustesTiempo perdido8.00 minUn solo extractor
—
Ver cita textual (Section 3.4 Value Stream Mapping)
Finally, in Packing, the process takes 85 minutes per cycle, 8 minutes for changeovers, and operates at 94% uptime before products are shipped.
noneDisponibilidad94.0 %Un solo extractor
—
Ver cita textual (Section 3.4 Value Stream Mapping)
The weighted average up-time of 73% across all stages masks the severity of the Thawing bottleneck, which operates at only 11% effective availability, implying 89% downtime that cascades delays throughout the entire value stream.
noneDisponibilidad73.0 %Un solo extractor
excess stock of raw food awaiting processing
Ver cita textual (Section 3.3 Pareto Analysis / Fig. 1)
The graph indicates that excess stock of raw food awaiting processing accounts for approximately 22% of total waste, while frequent miscommunication between operators contributes around 20%.
Paros organizacionales o externos (falta de material o personal, corte de servicios)Proporción de eventos de pérdida22.0 %Un solo extractor
frequent miscommunication between operators
Ver cita textual (Section 3.3 Pareto Analysis / Fig. 1)
The graph indicates that excess stock of raw food awaiting processing accounts for approximately 22% of total waste, while frequent miscommunication between operators contributes around 20%.
Paros organizacionales o externos (falta de material o personal, corte de servicios)Proporción de eventos de pérdida20.0 %Un solo extractor
frequent relocation of raw material pallets within the thawing area
Ver cita textual (Section 3.3 Pareto Analysis / Fig. 1)
Additionally, the frequent relocation of raw material pallets within the thawing area represents 18% of waste and the requirement for a 25-minute cleaning cycle of the tamping machine before each batch contributes 14.4%.
Paros organizacionales o externos (falta de material o personal, corte de servicios)Proporción de eventos de pérdida18.0 %Un solo extractor
25-minute cleaning cycle of the tamping machine before each batchtamping machine
Ver cita textual (Section 3.3 Pareto Analysis / Fig. 1)
Additionally, the frequent relocation of raw material pallets within the thawing area represents 18% of waste and the requirement for a 25-minute cleaning cycle of the tamping machine before each batch contributes 14.4%.
Setups y ajustesProporción de eventos de pérdida14.4 %Un solo extractor

Unidades de observación

  • Thawing · Refrigeración y congelación · Línea base
  • Marinating · Mezclado · Línea base
  • Compressing · Formado, moldeado y dosificado · Línea base
  • Portioning (Trimming) · Corte, rebanado y deshuese · Línea base
  • Shock Freeze · Refrigeración y congelación · Línea base
  • Packing · Envasado (formado, sellado, envoltura, encajado, paletizado) · Línea base
  • Whole line · Línea completa o equipo sin especificar · Línea base