Eingeschlossene Studie
Model based on TPM to increase the overall efficiency of equipment in an oil company
1Bibliografische Angaben
- Autoren
- Jose Herrera-Uribe, Diana Rivero-Davila, Martin Saenz-Moron
- Jahr
- 2023
- Publikationsorgan
- LACCEI International Multi-Conference for Engineering, Education and Technology (LACCEI)
- Land
- Peru
- Segment
- Getreide- und Ölsaatenmüllerei
- Prozessfamilie
- Schlachtung, Zerlegung und Primärverarbeitung
- Studientyp
- Vorher-nachher-Intervention
- Extraktionsumfang
- Volltext
- Umfang
- 1 Werke · — Linien · — Maschinen
- Beobachtungszeitraum
- —
- Datenerhebung
- manual_logs
- Intervention
Umfeld laut Studie anzeigen
In the company under study, located in the Ucayali-Peru region, the overall equipment efficiency (OEE) is 73.27%, implying that the machinery is not adequately utilized.
2Verzerrungsrisiko
Bewertet nach dem Schema des Protokolls: 2 geringe Bedenken, 1 einige Bedenken, 0 hohe Bedenken.
Gesamtpunktzahl 10Mittleres Risiko
| Kriterium | Punkte |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product or sector is given but the equipment or process is only partly described. | 1 / 2 |
| Is the observation period long enough and reported?Period not reported. | 0 / 2 |
| How were loss data collected?Manual logs or maintenance records with unknown completeness. | 1 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?Formulae or definitions are given for the reported metrics, including what counts as planned time. | 2 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?Only the top causes are reported and the unexplained remainder can be computed. | 1 / 2 |
| Is there evidence of selective reporting of favourable results?Intervention study in which baseline and post-intervention periods differ in length or method. | 1 / 2 |
| Are the reported numbers internally consistent?Recomputed totals, shares and OEE factors agree with the reported values within 2 percentage points. | 2 / 2 |
| Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result. | 2 / 2 |
3Extrahierte Daten
Jeder Datenpunkt mit seiner Einordnung und dem wörtlichen Zitat, das ihn belegt.
| Berichtete Ursache | Verlustkategorie | Kennzahl | Wert | Extraktion |
|---|---|---|---|---|
—Wörtliches Zitat anzeigen (Section IV.B Initial diagnosis)With the 3 parameters obtained, a current availability of 88.05%, an efficiency of 85.06% and an OEE of 73.27% were calculated. | none | OEE | 73,3 % | Einfache Extraktion |
—Wörtliches Zitat anzeigen (Section IV.B Initial diagnosis)With the 3 parameters obtained, a current availability of 88.05%, an efficiency of 85.06% and an OEE of 73.27% were calculated. | none | Verfügbarkeit | 88,1 % | Einfache Extraktion |
—Wörtliches Zitat anzeigen (Section IV.B Initial diagnosis)With the 3 parameters obtained, a current availability of 88.05%, an efficiency of 85.06% and an OEE of 73.27% were calculated. | none | Leistung | 85,1 % | Einfache Extraktion |
—Wörtliches Zitat anzeigen (Section IV.D Validation's indicators)a new availability of 91.01% is obtained, a yield of 97.65% and considering that the quality remains the same at 99.30% since no change was made that affects it. | none | Qualität | 99,3 % | Einfache Extraktion |
machine failure (repair time)Wörtliches Zitat anzeigen (Section IV.B Initial diagnosis)the machine repair time was calculated by the difference between the technician arrival time and his departure time after subtracting the machine emptying time, obtaining an MTTR of. 7.14 hours. | Anlagenausfall (Störungen) | Mittlere Ereignisdauer | 7,14 h | Einfache Extraktion |
time of failures in machineryWörtliches Zitat anzeigen (Section V Conclusions)it was possible that the time of failures in machinery was reduced from 12.09 hours to 4.50 hours, obtaining a reduction of 62.78%. | Anlagenausfall (Störungen) | Verlustzeit | 12,1 h | Einfache Extraktion |
machine set-up (15 tasks to initialize the machine)Wörtliches Zitat anzeigen (Section IV.B Initial diagnosis)Currently the set-up is done by means of 15 tasks each time a shift is started to initialize the machine where the 15 times were considered individually and then once added up, the current set up time was obtained, i.e., 20.83 minutes. | Rüsten und Einstellen | Verlustzeit | 20,8 min | Einfache Extraktion |
Beobachtungseinheiten
- Palm oil extraction machinery (whole process) · Gesamte Linie oder nicht spezifizierte Anlage · Ausgangslage