Use of packing equipment efficiency as an estimate of the overall plant effectiveness and as a tool to improve financial results of a food-processing unit

Abrir fuente

1Ficha bibliográfica

Autores
Jose Boaventura Rodrigues, Antonio Carlos Dantas Cabral
Año
2017
Publicación
Brazilian journal of food technology/Brazilian Journal of Food Technology
País
Brazil
Segmento
Molienda de granos y oleaginosas
Familia de procesos
Línea de llenado y envasado
Tipo de estudio
Estudio de caso único
Alcance de la extracción
Texto completo
Tamaño
1 plantas · 1 líneas · — máquinas
Periodo de observación
88 días
Recolección de datos
manual_logs
Intervención
Ver el contexto tal como lo describe el estudio
a case study was conducted by collecting data from the packing unit along a four-month period in a soy processing plant located in Brazil.

2Riesgo de sesgo

Puntuado con la rúbrica del protocolo: 2 preocupación baja, 1 algunas preocupaciones, 0 preocupación alta.
Puntuación total 12Riesgo moderado
ÍtemPuntuación
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product or sector is given but the equipment or process is only partly described.1 / 2
Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events).2 / 2
How were loss data collected?Manual logs or maintenance records with unknown completeness.1 / 2
Are OEE, loading time and the loss categories defined explicitly?Formulae or definitions are given for the reported metrics, including what counts as planned time.2 / 2
Does the loss breakdown account for the total loss it claims to explain?The reported causes or categories sum to at least 90% of the stated total, or an explicit "other" class closes the balance.2 / 2
Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method.2 / 2
Are the reported numbers internally consistent?Small inconsistencies (2 to 10 percentage points) or values that cannot be cross-checked.1 / 2
Could conflicts of interest or the source of the data bias the result?Authors are employees of the plant or of an equipment/software vendor; no declaration.1 / 2

3Datos extraídos

Cada dato con su clasificación y la cita textual que lo establece.
Causa reportadaCategoría de pérdidaMétricaValorExtracción
automation failurespacking equipment
Ver cita textual (Section 3.1, Figure 9)
A deeper analysis of non-scheduled maintenance data (Figure 9) shows that major causes of packing equipment failure are related to: electrical failures (26%), unscheduled operational (26%) or mechanical (23%) adjustments, worn parts or equipment breakdown (13%) and automation failures (6%).
Fallas de equipo (averías)Proporción del tiempo perdido6.00 %Ambos extractores coincidieron
worn parts or equipment breakdownpacking equipment
Ver cita textual (Section 3.1, Figure 9)
A deeper analysis of non-scheduled maintenance data (Figure 9) shows that major causes of packing equipment failure are related to: electrical failures (26%), unscheduled operational (26%) or mechanical (23%) adjustments, worn parts or equipment breakdown (13%) and automation failures (6%).
Fallas de equipo (averías)Proporción del tiempo perdido13.0 %Ambos extractores coincidieron
mechanical adjustmentspacking equipment
Ver cita textual (Section 3.1, Figure 9)
A deeper analysis of non-scheduled maintenance data (Figure 9) shows that major causes of packing equipment failure are related to: electrical failures (26%), unscheduled operational (26%) or mechanical (23%) adjustments, worn parts or equipment breakdown (13%) and automation failures (6%).
Fallas de equipo (averías)Proporción del tiempo perdido23.0 %Adjudicado
unscheduled operational adjustmentspacking equipment
Ver cita textual (Section 3.1, Figure 9)
A deeper analysis of non-scheduled maintenance data (Figure 9) shows that major causes of packing equipment failure are related to: electrical failures (26%), unscheduled operational (26%) or mechanical (23%) adjustments, worn parts or equipment breakdown (13%) and automation failures (6%).
Fallas de equipo (averías)Proporción del tiempo perdido26.0 %Adjudicado
electrical failurespacking equipment
Ver cita textual (Section 3.1, Figure 9)
A deeper analysis of non-scheduled maintenance data (Figure 9) shows that major causes of packing equipment failure are related to: electrical failures (26%), unscheduled operational (26%) or mechanical (23%) adjustments, worn parts or equipment breakdown (13%) and automation failures (6%).
Fallas de equipo (averías)Proporción del tiempo perdido26.0 %Ambos extractores coincidieron
lack of product input to the packing line (upstream losses)packing line
Ver cita textual (Section 3.1, Figure 8)
Major Availability losses were categorized as: non-scheduled maintenance (29,010 min. - 58% of Availability losses); packaging failure (11,079 min. - 22%); lack of demand that are downstream losses (8,260 min. - 13%) and; lack of product input to the packing line (952 min. – 2%).
Paros organizacionales o externos (falta de material o personal, corte de servicios)Proporción del tiempo perdido2.00 %Adjudicado
lack of product input to the packing line (upstream losses)packing line
Ver cita textual (Section 3.1, Figure 8)
Major Availability losses were categorized as: non-scheduled maintenance (29,010 min. - 58% of Availability losses); packaging failure (11,079 min. - 22%); lack of demand that are downstream losses (8,260 min. - 13%) and; lack of product input to the packing line (952 min. – 2%).
Paros organizacionales o externos (falta de material o personal, corte de servicios)Tiempo perdido952 minAdjudicado
lack of demand (downstream losses)packing line
Ver cita textual (Section 3.1, Figure 8)
Major Availability losses were categorized as: non-scheduled maintenance (29,010 min. - 58% of Availability losses); packaging failure (11,079 min. - 22%); lack of demand that are downstream losses (8,260 min. - 13%) and; lack of product input to the packing line (952 min. – 2%).
Paro planificado (mantenimiento programado, descansos, sin demanda)Proporción del tiempo perdido13.0 %Adjudicado
lack of demand (downstream losses)packing line
Ver cita textual (Section 3.1, Figure 8)
Major Availability losses were categorized as: non-scheduled maintenance (29,010 min. - 58% of Availability losses); packaging failure (11,079 min. - 22%); lack of demand that are downstream losses (8,260 min. - 13%) and; lack of product input to the packing line (952 min. – 2%).
Paro planificado (mantenimiento programado, descansos, sin demanda)Tiempo perdido8,260 minAdjudicado
packaging failurepacking line
Ver cita textual (Section 3.1, Figure 8)
Major Availability losses were categorized as: non-scheduled maintenance (29,010 min. - 58% of Availability losses); packaging failure (11,079 min. - 22%); lack of demand that are downstream losses (8,260 min. - 13%) and; lack of product input to the packing line (952 min. – 2%).
Microparos y esperasProporción del tiempo perdido22.0 %Adjudicado
packaging failurepacking line
Ver cita textual (Section 3.1, Figure 8)
Major Availability losses were categorized as: non-scheduled maintenance (29,010 min. - 58% of Availability losses); packaging failure (11,079 min. - 22%); lack of demand that are downstream losses (8,260 min. - 13%) and; lack of product input to the packing line (952 min. – 2%).
Microparos y esperasTiempo perdido11,079 minAdjudicado
non-scheduled maintenancepacking line
Ver cita textual (Section 3.1, Figure 8)
Major Availability losses were categorized as: non-scheduled maintenance (29,010 min. - 58% of Availability losses); packaging failure (11,079 min. - 22%); lack of demand that are downstream losses (8,260 min. - 13%) and; lack of product input to the packing line (952 min. – 2%).
Fallas de equipo (averías)Proporción del tiempo perdido58.0 %Ambos extractores coincidieron
non-scheduled maintenancepacking line
Ver cita textual (Section 3.1, Figure 8)
Major Availability losses were categorized as: non-scheduled maintenance (29,010 min. - 58% of Availability losses); packaging failure (11,079 min. - 22%); lack of demand that are downstream losses (8,260 min. - 13%) and; lack of product input to the packing line (952 min. – 2%).
Fallas de equipo (averías)Tiempo perdido29,010 minAmbos extractores coincidieron
—packing line
Ver cita textual (Section 3.1 Results and discussion)
Based on the expected improvement (existing OEE of 53.9% versus OEE of 74.1% for the proposed scenario) it is possible to estimate the financial benefit possibly achieved after the improvement plan is implemented.
noneOEE53.9 %Ambos extractores coincidieron

Unidades de observación

  • Packing line · Envasado (formado, sellado, envoltura, encajado, paletizado) · Línea base