foratvise
Comenzar
Estudio incluido

Lean and RCM-Based Production Model to Improve Operational Efficiency in the Production Line of a Peruvian Dairy SME

Abrir fuente

1Ficha bibliográfica

Autores
Gustavo Chaccha-Cuicapusa, Marco Antonio Flores-Chavez, Elmer Luis Tupia-De-La-Cruz
Año
2025
Publicación
International Journal of Industrial Engineering
País
Peru
Segmento
Productos lácteos
Familia de procesos
Línea de llenado y envasado
Tipo de estudio
Intervención antes/después
Alcance de la extracción
Texto completo
Tamaño
1 plantas · 1 líneas · 1 máquinas
Periodo de observación
365 días
Recolección de datos
manual_logs
Intervención
Ver el contexto tal como lo describe el estudio
The company ran a factory that made and packaged drinkable yogurt in a variety of ways.

2Riesgo de sesgo

Puntuado con la rúbrica del protocolo: 2 preocupación baja, 1 algunas preocupaciones, 0 preocupación alta.
Puntuación total 13Riesgo bajo
ÍtemPuntuación
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described.2 / 2
Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events).2 / 2
How were loss data collected?Manual logs or maintenance records with unknown completeness.1 / 2
Are OEE, loading time and the loss categories defined explicitly?A standard definition is cited but its application is not shown.1 / 2
Does the loss breakdown account for the total loss it claims to explain?The reported causes or categories sum to at least 90% of the stated total, or an explicit "other" class closes the balance.2 / 2
Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method.2 / 2
Are the reported numbers internally consistent?Small inconsistencies (2 to 10 percentage points) or values that cannot be cross-checked.1 / 2
Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result.2 / 2

3Datos extraídos

Cada dato con su clasificación y la cita textual que lo establece.
Causa reportadaCategoría de pérdidaMétricaValorExtracción
—
Ver cita textual (Section 4.3.3)
It was confirmed that system availability went up by 10.7 percentage points, the OEE of the filling subprocess went up from 60.4% to 70.6%, and the overall production OEE went up to 72.8%, which is an eight-percentage-point increase.
noneOEE72.8 %Ambos extractores coincidieron
—
Ver cita textual (Section 4.2)
This result showed that the average efficiency level over the past twelve months was 67.7%, which is lower than the industry standard.
noneOEE67.7 %Ambos extractores coincidieron
—filling machine
Ver cita textual (Section 4.3.3)
It was confirmed that system availability went up by 10.7 percentage points, the OEE of the filling subprocess went up from 60.4% to 70.6%, and the overall production OEE went up to 72.8%, which is an eight-percentage-point increase.
noneOEE70.6 %Ambos extractores coincidieron
product losses during the filling processfilling machine
Ver cita textual (Section 4.2)
The analysis found two main reasons for this inefficiency: unproductive time during the packaging process, which made up 63% of the problem, and product losses during the filling process, which made up the other 37%.
Defectos de proceso (desecho y reproceso)Proporción del tiempo perdido37.0 %Ambos extractores coincidieron
setup time delaysfilling machine
Ver cita textual (Section 4.2)
The first reason had a lot of problems that caused the filling machine to break down often (55.8% of the problems) and setup time delays (44.2% of the inefficiencies).
Setups y ajustesProporción del tiempo perdido44.2 %Ambos extractores coincidieron
—filling machine
Ver cita textual (Section 4.3.3)
It was confirmed that system availability went up by 10.7 percentage points, the OEE of the filling subprocess went up from 60.4% to 70.6%, and the overall production OEE went up to 72.8%, which is an eight-percentage-point increase.
noneOEE60.4 %Ambos extractores coincidieron
—filling machine
Ver cita textual (Section 4.3.2)
These numbers showed that the system broke down a lot and took a long time to recover, which meant it was only available 69.9% of the time.
noneDisponibilidad69.9 %Ambos extractores coincidieron
—filling machine
Ver cita textual (Section 4.3.2)
The system's Mean Time Between Failures (MTBF) was 3.57 hours, and the Mean Time to Repair (MTTR) was 1.53 hours before it was used.
Fallas de equipo (averías)Duración media del evento1.53 hAmbos extractores coincidieron
—filling machine
Ver cita textual (Section 4.3.2)
The system's Mean Time Between Failures (MTBF) was 3.57 hours, and the Mean Time to Repair (MTTR) was 1.53 hours before it was used.
Fallas de equipo (averías)Tiempo entre eventos3.57 hAmbos extractores coincidieron
filling machine break down oftenfilling machine
Ver cita textual (Section 4.2)
The first reason had a lot of problems that caused the filling machine to break down often (55.8% of the problems) and setup time delays (44.2% of the inefficiencies).
Fallas de equipo (averías)Proporción del tiempo perdido55.8 %Ambos extractores coincidieron
—filling machine
Ver cita textual (Table 1)
MTTR hour 1.53 0.77 1.5 -2%
Fallas de equipo (averías)Duración media del evento1.50 hAmbos extractores coincidieron
—filling machine
Ver cita textual (Table 1)
MTBF hour 3.57 5.84 6.23 75%
Fallas de equipo (averías)Tiempo entre eventos6.23 hAmbos extractores coincidieron
—filling machine
Ver cita textual (Table 1)
Availability % 69.90% 80% 80.60% 15%
noneDisponibilidad80.6 %Ambos extractores coincidieron
setup timefilling machine
Ver cita textual (Section 4.3.1)
The average setup time alone was 37.5 minutes, which made things much less efficient and cut down on effective working time.
Setups y ajustesTiempo perdido37.5 minUn solo extractor
setup timefilling machine
Ver cita textual (Figure 2 / Section 4.3.1)
The first setup took 37.3 minutes, but after using the method, it only took 16.3 minutes.
Setups y ajustesTiempo perdido37.3 minUn solo extractor
unproductive time during the packaging processfilling machine
Ver cita textual (Section 4.2)
The analysis found two main reasons for this inefficiency: unproductive time during the packaging process, which made up 63% of the problem, and product losses during the filling process, which made up the other 37%.
No clasificable a partir del reporteProporción del tiempo perdido63.0 %Un solo extractor
setup timefilling machine
Ver cita textual (Table 1)
Setup Time minutes 37.5 18.75 16.39 -56%
Setups y ajustesTiempo perdido16.4 minUn solo extractor
setup timefilling machine
Ver cita textual (Figure 2 / Section 4.3.1)
The first setup took 37.3 minutes, but after using the method, it only took 16.3 minutes.
Setups y ajustesTiempo perdido16.3 minUn solo extractor
—filling machine
Ver cita textual (Section 4.3.1)
The average setup time alone was 37.5 minutes
Setups y ajustesDuración media del evento37.5 minUn solo extractor
—filling machine
Ver cita textual (Table 1)
Setup Time | minutes | 37.5 | 18.75 | 16.39 | -56%
Setups y ajustesDuración media del evento16.4 minUn solo extractor

Unidades de observación

  • Overall production process · Línea completa o equipo sin especificar · Después de la intervención
  • Overall production process · Línea completa o equipo sin especificar · Línea base
  • Filling machine (packaging subprocess) · Llenado · Después de la intervención
  • Filling machine (packaging subprocess) · Llenado · Línea base
  • Packaging line · Llenado · Línea base
  • Packaging line · Llenado · Después de la intervención