Estudio incluido
Waste Management and Operational Efficiency Improvement in Cake and Pastry Factory Through Adapting DMAIC Methodology
1Ficha bibliográfica
- Autores
- Kaouther Ghacham, Shoug Ghanem Alshawi, Raghad Muhammed Aljaloud, Malath Abdulkarim Alrawdhan, Munerah Saleh Alrudhyan, Lial Hamad Almari
- Año
- 2026
- Publicación
- International Conference on Industrial Engineering and Operations Management (IEOM)
- País
- Saudi Arabia
- Segmento
- Panadería y pastas
- Familia de procesos
- Formado, horneado y cocción
- Tipo de estudio
- Intervención antes/después
- Alcance de la extracción
- Texto completo
- Tamaño
- 1 plantas · 3 líneas · 9 máquinas
- Periodo de observación
- 300 días
- Recolección de datos
- manual_logs
- Intervención
Ver el contexto tal como lo describe el estudio
This study focuses on reducing waste and enhancing operations in a bun production line within a leading bakery manufacturer that has over 40 years of experience in the fast-food and baking industry and is ranked among the top 50 most valuable brands in Saudi Arabia.
2Riesgo de sesgo
Puntuado con la rúbrica del protocolo: 2 preocupación baja, 1 algunas preocupaciones, 0 preocupación alta.
Puntuación total 12Riesgo moderado
| Ítem | Puntuación |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described. | 2 / 2 |
| Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events). | 2 / 2 |
| How were loss data collected?Manual logs or maintenance records with unknown completeness. | 1 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?No definition; metrics are reported as bare numbers. | 0 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?The reported causes or categories sum to at least 90% of the stated total, or an explicit "other" class closes the balance. | 2 / 2 |
| Is there evidence of selective reporting of favourable results?Intervention study in which baseline and post-intervention periods differ in length or method. | 1 / 2 |
| Are the reported numbers internally consistent?Recomputed totals, shares and OEE factors agree with the reported values within 2 percentage points. | 2 / 2 |
| Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result. | 2 / 2 |
3Datos extraídos
Cada dato con su clasificación y la cita textual que lo establece.
| Causa reportada | Categoría de pérdida | Métrica | Valor | Extracción |
|---|---|---|---|---|
time wasteVer cita textual (Section 5.2.3 Solutions Execution)Implementation led to a 13% reduction in food waste, from 1.13% to 0.983%, 5% increase in OEE, from 52.6% to 55.4%, and a 31.6% reduction in time waste, dropping from 12.8% to 8.76%, successfully meeting the project objectives. | No clasificable a partir del reporte | Proporción del tiempo planificado | 8.76 % | Ambos extractores coincidieron |
—Ver cita textual (Section 5.2.3 Solutions Execution)Implementation led to a 13% reduction in food waste, from 1.13% to 0.983%, 5% increase in OEE, from 52.6% to 55.4%, and a 31.6% reduction in time waste, dropping from 12.8% to 8.76%, successfully meeting the project objectives. | none | OEE | 55.4 % | Ambos extractores coincidieron |
DividerDividerVer cita textual (Section 5.1.2 Time Waste / Figure 4)Divider exhibits the highest probability of failure in the upcoming month, indicated by the most significant number of recorded breakdowns (30 incidents). The high failure frequency combined with moderate repair time (MTTR = 42.1 minutes). | Fallas de equipo (averías) | Duración media del evento | 42.1 min | Ambos extractores coincidieron |
DividerDividerVer cita textual (Section 5.1.2 Time Waste / Figure 4)Divider exhibits the highest probability of failure in the upcoming month, indicated by the most significant number of recorded breakdowns (30 incidents). The high failure frequency combined with moderate repair time (MTTR = 42.1 minutes). | Fallas de equipo (averías) | Número de eventos | 30.0 events | Ambos extractores coincidieron |
ProoferProoferVer cita textual (Section 5.1.2 Time Waste / Figure 4)Proofer, with a recorded 27 failures, has the longest average MTTR (121.22) and reliability at only 4.25%, underscoring its substantial impact on unplanned downtime. | Fallas de equipo (averías) | Duración media del evento | 121 min | Ambos extractores coincidieron |
prooferProoferVer cita textual (Figure 2 / Section 4.2)Analysis of breakdown sources in Figure 2 showed that the proofer was the most critical contributor with 55 hours lost across 28 incidents, followed by power interruption during the Eid al-Fitr season. | Fallas de equipo (averías) | Número de eventos | 28.0 events | Ambos extractores coincidieron |
prooferProoferVer cita textual (Figure 2 / Section 4.2)Analysis of breakdown sources in Figure 2 showed that the proofer was the most critical contributor with 55 hours lost across 28 incidents, followed by power interruption during the Eid al-Fitr season. | Fallas de equipo (averías) | Tiempo perdido | 55.0 h | Ambos extractores coincidieron |
Power InterruptionVer cita textual (Section 5.1.2 Time Waste)The Power Interruption category only happened twice; it had a high MTTR of 913.5 minutes, which brought the reliability down to 79.22%. | Paros organizacionales o externos (falta de material o personal, corte de servicios) | Duración media del evento | 914 min | Ambos extractores coincidieron |
breakdownsVer cita textual (Section 4.2 Measure Phase)Over the course of ten months in 2024, 187 breakdowns resulted in 204.75 hours of downtime (3.032% of production time), an acceptable rate that requires ongoing monitoring, particularly for trends that persist. | Fallas de equipo (averías) | Proporción del tiempo planificado | 3.03 % | Ambos extractores coincidieron |
breakdownsVer cita textual (Section 4.2 Measure Phase)Over the course of ten months in 2024, 187 breakdowns resulted in 204.75 hours of downtime (3.032% of production time), an acceptable rate that requires ongoing monitoring, particularly for trends that persist. | Fallas de equipo (averías) | Tiempo perdido | 205 h | Ambos extractores coincidieron |
breakdownsVer cita textual (Section 4.2 Measure Phase)Over the course of ten months in 2024, 187 breakdowns resulted in 204.75 hours of downtime (3.032% of production time), an acceptable rate that requires ongoing monitoring, particularly for trends that persist. | Fallas de equipo (averías) | Número de eventos | 187 events | Ambos extractores coincidieron |
—Ver cita textual (Section 4.2 Measure Phase)The 2024 performance yielded a 98.55% yield with an 82% automation level, but moderate technology utilization was observed, indicating untapped potential and weak process control that require further investigation. | none | Rendimiento másico | 98.6 % | Ambos extractores coincidieron |
—Ver cita textual (Section 5.1.4)Results showed an Availability of 82.41%, a Performance of 87%, and a Quality rate of 68.18%, leading to an overall OEE of 48.64% and indicating potential for improvement, as world-class OEE values typically exceed 85%. | none | OEE | 48.6 % | Ambos extractores coincidieron |
—Ver cita textual (Section 5.1.4)Results showed an Availability of 82.41%, a Performance of 87%, and a Quality rate of 68.18%, leading to an overall OEE of 48.64% and indicating potential for improvement, as world-class OEE values typically exceed 85%. | none | Calidad | 68.2 % | Ambos extractores coincidieron |
—Ver cita textual (Section 5.1.4)Results showed an Availability of 82.41%, a Performance of 87%, and a Quality rate of 68.18%, leading to an overall OEE of 48.64% and indicating potential for improvement, as world-class OEE values typically exceed 85%. | none | Rendimiento | 87.0 % | Ambos extractores coincidieron |
—Ver cita textual (Section 5.1.4)Results showed an Availability of 82.41%, a Performance of 87%, and a Quality rate of 68.18%, leading to an overall OEE of 48.64% and indicating potential for improvement, as world-class OEE values typically exceed 85%. | none | Disponibilidad | 82.4 % | Ambos extractores coincidieron |
breakdown time and changeover timeVer cita textual (Section 4.2 Measure Phase)The waste of breakdown time and changeover time together accounted for 12.8% of production time. | No clasificable a partir del reporte | Proporción del tiempo planificado | 12.8 % | Ambos extractores coincidieron |
changeover timeVer cita textual (Section 4.2 Measure Phase)Changeover activities during January 2025 consumed 66.63 hours, which accounted for 9.77% of total production time, a relatively high percentage attributed to the product variety. | Setups y ajustes | Proporción del tiempo planificado | 9.77 % | Ambos extractores coincidieron |
changeover timeVer cita textual (Section 4.2 Measure Phase)Changeover activities during January 2025 consumed 66.63 hours, which accounted for 9.77% of total production time, a relatively high percentage attributed to the product variety. | Setups y ajustes | Tiempo perdido | 66.6 h | Ambos extractores coincidieron |
—Ver cita textual (Section 4.1 Define Phase)improving Overall Equipment Effectiveness from its current level of 48% to more than 55% is crucial for enhancing productivity and achieving sustainability | none | OEE | 48.0 % | Un solo extractor |
total food wasteVer cita textual (Section 4.2 Measure Phase)total waste increased from 85,252 kg (0.42%) in 2022 to 286,723.99 kg (1.48%) in 2024, representing a 236% increase, while downtime increased from 106.26 hours to 244.17 hours, despite production levels remaining relatively stable at around 20 million units. | No clasificable a partir del reporte | Tasa de defectos | 0.420 % | Un solo extractor |
total food wasteVer cita textual (Section 4.2 Measure Phase)total waste increased from 85,252 kg (0.42%) in 2022 to 286,723.99 kg (1.48%) in 2024, representing a 236% increase, while downtime increased from 106.26 hours to 244.17 hours, despite production levels remaining relatively stable at around 20 million units. | No clasificable a partir del reporte | Tasa de defectos | 1.48 % | Un solo extractor |
total food wasteVer cita textual (Section 4.2 Measure Phase)total waste increased from 85,252 kg (0.42%) in 2022 to 286,723.99 kg (1.48%) in 2024, representing a 236% increase, while downtime increased from 106.26 hours to 244.17 hours, despite production levels remaining relatively stable at around 20 million units. | No clasificable a partir del reporte | Tasa de defectos | 85,252 kg | Un solo extractor |
total food wasteVer cita textual (Section 4.2 Measure Phase)Total food waste in the bun production line was 286,723.99 kg in 2024, representing approximately 1.5% of total production. | No clasificable a partir del reporte | Tasa de defectos | 286,724 kg | Un solo extractor |
total food wasteVer cita textual (Section 4.2 Measure Phase)Total food waste in the bun production line was 286,723.99 kg in 2024, representing approximately 1.5% of total production. | No clasificable a partir del reporte | Tasa de defectos | 1.50 % | Un solo extractor |
downtimeVer cita textual (Section 4.2 Measure Phase)total waste increased from 85,252 kg (0.42%) in 2022 to 286,723.99 kg (1.48%) in 2024, representing a 236% increase, while downtime increased from 106.26 hours to 244.17 hours, despite production levels remaining relatively stable at around 20 million units. | No clasificable a partir del reporte | Tiempo perdido | 106 h | Un solo extractor |
downtimeVer cita textual (Section 4.2 Measure Phase)total waste increased from 85,252 kg (0.42%) in 2022 to 286,723.99 kg (1.48%) in 2024, representing a 236% increase, while downtime increased from 106.26 hours to 244.17 hours, despite production levels remaining relatively stable at around 20 million units. | No clasificable a partir del reporte | Tiempo perdido | 244 h | Un solo extractor |
total food wasteVer cita textual (Section 4.2 Measure Phase)Over the course of ten months in 2024, the total food waste amounted to 182,539 kg. | No clasificable a partir del reporte | Tasa de defectos | 182,539 kg | Un solo extractor |
production wasteVer cita textual (Section 4.2 Measure Phase)It is categorized into three primary sources: production waste at 37.7%, breakdown waste at 61.7%, and R&D waste at 0.6%. | Defectos de proceso (desecho y reproceso) | Tasa de defectos | 37.7 % | Un solo extractor |
breakdown wasteVer cita textual (Section 4.2 Measure Phase)It is categorized into three primary sources: production waste at 37.7%, breakdown waste at 61.7%, and R&D waste at 0.6%. | Fallas de equipo (averías) | Tasa de defectos | 61.7 % | Un solo extractor |
R&D wasteVer cita textual (Section 4.2 Measure Phase)It is categorized into three primary sources: production waste at 37.7%, breakdown waste at 61.7%, and R&D waste at 0.6%. | No clasificable a partir del reporte | Tasa de defectos | 0.600 % | Un solo extractor |
R&D wasteVer cita textual (Section 4.2 Measure Phase)R&D waste, though minor at 1,158.98 kg in January 2024, represented 6.55% of experimental activity waste in the month. | No clasificable a partir del reporte | Tasa de defectos | 1,159 kg | Un solo extractor |
R&D wasteVer cita textual (Section 4.2 Measure Phase)R&D waste, though minor at 1,158.98 kg in January 2024, represented 6.55% of experimental activity waste in the month. | No clasificable a partir del reporte | Proporción del tiempo perdido | 6.55 % | Un solo extractor |
non-productive activitiesVer cita textual (Section 4.2 Measure Phase)Based on January 2025 performance, 86.5% of planned production time was used effectively, while 13.5% was lost to non-productive activities, including setup, changeover, machine downtime, and maintenance. | No clasificable a partir del reporte | Proporción del tiempo planificado | 13.5 % | Un solo extractor |
breakdown eventsVer cita textual (Figure 5 / Section 5.1.2)Analysis of 200 breakdown events by shift (Day: 6 AM - 6 PM, Night: 6 PM - 6 AM), Figure 5 showed a higher concentration of incidents during the night shift, particularly in the late evening and early morning hours. | Fallas de equipo (averías) | Número de eventos | 200 events | Un solo extractor |
depanning failuresdepannerVer cita textual (Section 5.1.1 Food Waste)The depanning failures, representing approximately 46.5% of production waste, were identified as the most significant contribution. | Defectos de proceso (desecho y reproceso) | Tasa de defectos | 46.5 % | Un solo extractor |
proofing and baking deviationsVer cita textual (Section 5.1.1 Food Waste)Proofing and baking deviations, together accounting for 27% of production waste, were primarily linked to equipment malfunctions in the proofer and oven discussed earlier. | Defectos de proceso (desecho y reproceso) | Tasa de defectos | 27.0 % | Un solo extractor |
ingredient mixing errorsVer cita textual (Section 5.1.1 Food Waste)Ingredient mixing errors (12.5%) were another source of loss, due to manual weighing and human variability. | Defectos de proceso (desecho y reproceso) | Tasa de defectos | 12.5 % | Un solo extractor |
topping and panning failuresVer cita textual (Section 5.1.1 Food Waste)Similarly, topping and panning failures (13.9% combined) occurred when dough balls were misaligned in pans or when glazing and sesame seeds were applied unsuccessfully. | Defectos de proceso (desecho y reproceso) | Tasa de defectos | 13.9 % | Un solo extractor |
DepannerdepannerVer cita textual (Section 5.2 Improve Phase)Analysis showed that the Imprinter caused 53% of breakdown-related waste (32.7% of total), followed by the Depanner at 17.4% and Ingredient Mixing at 12.9%. | Defectos de proceso (desecho y reproceso) | Tasa de defectos | 17.4 % | Un solo extractor |
Ingredient MixingVer cita textual (Section 5.2 Improve Phase)Analysis showed that the Imprinter caused 53% of breakdown-related waste (32.7% of total), followed by the Depanner at 17.4% and Ingredient Mixing at 12.9%. | Defectos de proceso (desecho y reproceso) | Tasa de defectos | 12.9 % | Un solo extractor |
ImprinterImprinterVer cita textual (Figure 1 / Section 4.2)Pareto analysis (Figure 1) identified the imprinter machine as having the most significant contribution at 59,692 kg and requiring the highest level of priority for corrective action. | Fallas de equipo (averías) | Tasa de defectos | 59,692 kg | Un solo extractor |
ImprinterImprinterVer cita textual (Section 5.1.1 Food Waste)The earlier Pareto chart shown in Figure 1 identified the imprinter machine as the most critical source, contributing 53% of breakdown waste and 32.7% of total food waste. | Fallas de equipo (averías) | Tasa de defectos | 53.0 % | Un solo extractor |
ImprinterImprinterVer cita textual (Section 5.1.1 Food Waste)The earlier Pareto chart shown in Figure 1 identified the imprinter machine as the most critical source, contributing 53% of breakdown waste and 32.7% of total food waste. | Fallas de equipo (averías) | Tasa de defectos | 32.7 % | Un solo extractor |
ProoferProoferVer cita textual (Section 5.1.1 Food Waste)The proof was identified as the second-largest contributor to breakdown waste, generating 14,820 kg of waste due to repeated failures in its endless drive system. | Fallas de equipo (averías) | Tasa de defectos | 14,820 kg | Un solo extractor |
ProoferProoferVer cita textual (Section 5.1.2 Time Waste / Figure 4)Proofer, with a recorded 27 failures, has the longest average MTTR (121.22) and reliability at only 4.25%, underscoring its substantial impact on unplanned downtime. | Fallas de equipo (averías) | Número de eventos | 27.0 events | Un solo extractor |
ovenOvenVer cita textual (Section 5.1.1 Food Waste)Next, the oven, with 7,392 kg of waste, experienced frequent jamming and gas supply fluctuations, resulting in uneven baking and temperature deviations. | Fallas de equipo (averías) | Tasa de defectos | 7,392 kg | Un solo extractor |
food wasteVer cita textual (Section 5.2.3 Solutions Execution)Implementation resulted in a reduction of 24.8% in food waste, from 1.5% to 1.13%, and a 7.11% increase in OEE, from 48% to 52.6%. | No clasificable a partir del reporte | Tasa de defectos | 1.13 % | Un solo extractor |
—Ver cita textual (Section 5.2.3 Solutions Execution)Implementation resulted in a reduction of 24.8% in food waste, from 1.5% to 1.13%, and a 7.11% increase in OEE, from 48% to 52.6%. | none | OEE | 52.6 % | Un solo extractor |
food wasteVer cita textual (Section 5.2.3 Solutions Execution)Implementation led to a 13% reduction in food waste, from 1.13% to 0.983%, 5% increase in OEE, from 52.6% to 55.4%, and a 31.6% reduction in time waste, dropping from 12.8% to 8.76%, successfully meeting the project objectives. | No clasificable a partir del reporte | Tasa de defectos | 0.983 % | Un solo extractor |
—Ver cita textual (Section 4.2)Total food waste in the bun production line was 286,723.99 kg in 2024, representing approximately 1.5% of total production. | Defectos de proceso (desecho y reproceso) | Proporción del tiempo planificado | 1.50 % | Un solo extractor |
—Ver cita textual (Section 4.2)It is categorized into three primary sources: production waste at 37.7%, breakdown waste at 61.7%, and R&D waste at 0.6%. | Fallas de equipo (averías) | Proporción del tiempo perdido | 61.7 % | Un solo extractor |
—Ver cita textual (Section 4.2)It is categorized into three primary sources: production waste at 37.7%, breakdown waste at 61.7%, and R&D waste at 0.6%. | Defectos de proceso (desecho y reproceso) | Proporción del tiempo perdido | 37.7 % | Un solo extractor |
imprinter machineimprinterVer cita textual (Section 4.2)Pareto analysis (Figure 1) identified the imprinter machine as having the most significant contribution at 59,692 kg and requiring the highest level of priority for corrective action. | Fallas de equipo (averías) | Tiempo perdido | 59,692 kg | Un solo extractor |
proofer endless drive system failuresprooferVer cita textual (Section 5.1.1)The proof was identified as the second-largest contributor to breakdown waste, generating 14,820 kg of waste due to repeated failures in its endless drive system. | Fallas de equipo (averías) | Tiempo perdido | 14,820 kg | Un solo extractor |
oven jamming and gas supply fluctuationsovenVer cita textual (Section 5.1.1)Next, the oven, with 7,392 kg of waste, experienced frequent jamming and gas supply fluctuations, resulting in uneven baking and temperature deviations. | Fallas de equipo (averías) | Tiempo perdido | 7,392 kg | Un solo extractor |
depanning failuresdepannerVer cita textual (Section 5.1.1)The depanning failures, representing approximately 46.5% of production waste, were identified as the most significant contribution. | Defectos de proceso (desecho y reproceso) | Proporción del tiempo perdido | 46.5 % | Un solo extractor |
proofing and baking deviationsproofer, ovenVer cita textual (Section 5.1.1)Proofing and baking deviations, together accounting for 27% of production waste, were primarily linked to equipment malfunctions in the proofer and oven | Defectos de proceso (desecho y reproceso) | Proporción del tiempo perdido | 27.0 % | Un solo extractor |
ingredient mixing errorsVer cita textual (Section 5.1.1)Ingredient mixing errors (12.5%) were another source of loss, due to manual weighing and human variability. | Defectos de proceso (desecho y reproceso) | Proporción del tiempo perdido | 12.5 % | Un solo extractor |
panning and topping failurespannerVer cita textual (Section 5.1.1)Similarly, topping and panning failures (13.9% combined) occurred when dough balls were misaligned in pans or when glazing and sesame seeds were applied unsuccessfully. | Defectos de proceso (desecho y reproceso) | Proporción del tiempo perdido | 13.9 % | Un solo extractor |
—Ver cita textual (Section 5.2.3)In Phase 2, from April to May 2025, similar product scheduling was implemented, along with preventive maintenance and the standardization of color-coded measuring tools. Implementation led to a 13% reduction in food waste, from 1.13% to 0.983% | Defectos de proceso (desecho y reproceso) | Proporción del tiempo planificado | 0.983 % | Un solo extractor |
Unidades de observación
- Bun production line (Phase 2) · Línea completa o equipo sin especificar · Después de la intervención
- Divider · Formado, moldeado y dosificado · Línea base
- Proofer · Fermentación · Línea base
- Bun production line · Línea completa o equipo sin especificar · Línea base
- Imprinter · Formado, moldeado y dosificado · Línea base
- Oven · Horneado · Línea base
- Bun production line (Phase 1) · Línea completa o equipo sin especificar · Después de la intervención
- Bun Production Line · Línea completa o equipo sin especificar · Después de la intervención