Kurz gefasst
Sie tritt bei etwa 1 von 100 untersuchten Linien auf.
Wenn sie auftritt, entfällt auf sie im Mittel etwa 48 % der Verlustzeit der Linie. Berichtet von 3 der 127 Studien, die sie beobachten konnten (begrenzte Evidenz).
Was passiert
Liquid product such as syrup or chocolate is lost as it moves between process stages because of the geometry and length of the transfer lines, residual holdup in pipes, hoses and buffer tanks, or inefficient manual handling during transfer. The product that clings to walls, remains in dead legs, or is spilled during manual pouring never reaches the downstream process as usable material.
Was man dagegen tut
Redesign transfer lines to minimize length, dead legs and holdup volume, add pigging or scraping systems to recover residual product, and automate manual transfer steps with closed piping and pumps instead of open pouring. Track and reconcile mass balances per transfer event to quantify and target the largest contributors.
Praktische Hinweise auf Basis ingenieurtechnischen Wissens; keine statistische Schätzung.
1Wahrscheinlichkeit und Evidenz
- Auftretenswahrscheinlichkeit
- 0,9 % [0,2–2,1 %]
- Erwarteter Anteil an der Verlustzeit
- 0,4 % [0,1–1,1 %]
- Anteil an der Verlustzeit bei Auftreten
- 48 % [29–66 %]
- Studien / Einheiten
- 127 / 161
- Evidenzgrad
- C
Grad C: 2 bis 4 Studien oder eine Intervallbreite über 0,35.
2Wahrscheinlichkeit nach Segment
- Milchprodukte0,9 % [0,1–3,1 %]13 Studien
- Erfrischungsgetränke, abgefülltes Wasser und Säfte1,1 % [0,2–3,5 %]26 Studien
- Bier, Wein und Spirituosen1,0 % [0,1–3,4 %]11 Studien
- Backwaren und Teigwaren1,2 % [0,2–3,5 %]24 Studien
- Fleisch, Geflügel und Fisch1,0 % [0,1–3,2 %]9 Studien
- Obst- und Gemüseverarbeitung1,0 % [0,1–3,5 %]7 Studien
- Getreide- und Ölsaatenmüllerei1,0 % [0,1–3,6 %]6 Studien
- Zucker und Süßwaren1,4 % [0,2–4,8 %]9 Studien
- Snacks, Kaffee, Tee und sonstige Lebensmittel1,0 % [0,1–3,4 %]5 Studien
- Futtermittel und Heimtiernahrung1,0 % [0,1–3,4 %]7 Studien
- Lebensmittelherstellung (nicht spezifiziert oder gemischt)0,9 % [0,1–3,2 %]10 Studien
3Mechanismus, SCADA-Signatur und Gegenmaßnahme
Mechanismus
Ingenieurpraktische HinweiseLiquid product such as syrup or chocolate is lost as it moves between process stages because of the geometry and length of the transfer lines, residual holdup in pipes, hoses and buffer tanks, or inefficient manual handling during transfer. The product that clings to walls, remains in dead legs, or is spilled during manual pouring never reaches the downstream process as usable material.
So zeigt sie sich in SCADA-Daten
Ingenieurpraktische HinweiseThere is no single dedicated alarm; the loss typically appears as a mass or volume balance discrepancy between the source tank/line and the receiving tank, as short unclassified stop events logged at transfer points without a maintenance code, or as manual operator actions recorded in MES during product transfer that correlate with downstream yield shortfalls.
Gegenmaßnahme
Ingenieurpraktische HinweiseRedesign transfer lines to minimize length, dead legs and holdup volume, add pigging or scraping systems to recover residual product, and automate manual transfer steps with closed piping and pumps instead of open pouring. Track and reconcile mass balances per transfer event to quantify and target the largest contributors.
4Quellen
- An Example Application On Comparison Of Six Sigma And Kaizen From Total Quality Managment Techniquies (2018)Quelle öffnenVerlustzeit: 20.000 litre · laut Bericht: “Transfer hattı dizaynına bağlı şurup kaybı”
Wörtliches Zitat anzeigen
Böylece 1 yıllık süreç içersinde 20.000 litre şurup kaybının engellenmesi sağlanmıştır.
- An Example Application On Comparison Of Six Sigma And Kaizen From Total Quality Managment Techniquies (2018)Quelle öffnenVerlustzeit: 57.000 litre · laut Bericht: “Şurup transferi ve ürün hazırlamadaki kayıplar”
Wörtliches Zitat anzeigen
Belirlenen bu kök nedenin yarattığı kayıp miktarı 57.000 litre olup genel kayıpların %20 sini oluşturduğu belirlenmiştir.
- An Example Application On Comparison Of Six Sigma And Kaizen From Total Quality Managment Techniquies (2018)Quelle öffnenAnteil an der Verlustzeit: 20,0 % · laut Bericht: “Şurup transferi ve ürün hazırlamadaki kayıplar”
Wörtliches Zitat anzeigen
Belirlenen bu kök nedenin yarattığı kayıp miktarı 57.000 litre olup genel kayıpların %20 sini oluşturduğu belirlenmiştir.
- An Example Application On Comparison Of Six Sigma And Kaizen From Total Quality Managment Techniquies (2018)Quelle öffnenVerlustzeit: 27,5 litre · laut Bericht: “Transfer hattı dizaynına bağlı şurup kaybı”
Wörtliches Zitat anzeigen
Şurup transfer hatlarından bir tanesinde her üretim başlangıç ve bitişinde transfer hattı dizaynına bağlı olarak ortalama 87.5 litrelik şurup kaybı olduğu belirlenmiş yapılan iyileştirmeler ile kayıp %69 oranında azaltılarak 27.5 litre seviyesine indirilmiştir.
- Productivity Improvement in a Bakery and Pastry Premix Company by Applying Preventive Maintenance, SMED and 5´S (2026)Quelle öffnenMittlere Ereignisdauer: 3,02 min · laut Bericht: “Transfer”
Wörtliches Zitat anzeigen
Transfer 3.02 2.96 2%
- Productivity Improvement in a Bakery and Pastry Premix Company by Applying Preventive Maintenance, SMED and 5´S (2026)Quelle öffnenMittlere Ereignisdauer: 2,96 min · laut Bericht: “Transfer”
Wörtliches Zitat anzeigen
Transfer 3.02 2.96 2%
- Improving Production Efficiency in a Chocolate SME through Continuous Flow, SMED and Poka-Yoke (2026)Quelle öffnenVerlustzeit: 180 min · laut Bericht: “manual chocolate transfer”
Wörtliches Zitat anzeigen
Problem addressed: 180-minute manual transfer, temperature fluctuations, risk of spills, and WIP accumulation.