In-process quality check (Brix, acidity, pH, appearance)
Die wissenschaftlichen Inhalte dieser Seite werden auf Englisch und Spanisch veröffentlicht; hier werden sie auf Englisch angezeigt.
Kurz gefasst
Sie tritt bei etwa 1 von 100 untersuchten Linien auf.
Wenn sie auftritt, entfällt auf sie im Mittel etwa 57 % der Verlustzeit der Linie. Berichtet von 1 der 79 Studien, die sie beobachten konnten (spärliche Evidenz).
Was passiert
The production flow includes a quality check step where samples are drawn from the batch or line and tested for Brix, titratable acidity, pH and visual appearance before the product can be released to continue; this requires transporting the sample to a check station, performing the measurement or correlation calculation, and waiting for QC clearance. The physical location of the check station and the hand-off between production and quality personnel can add idle time that is organizational rather than mechanical in origin.
Was man dagegen tut
Replace or complement off-line laboratory testing with inline or at-line rapid Brix-pH-acidity measurement to shorten the wait for release, position the check station to minimize sample transport distance, and establish clear hand-off procedures and release criteria between production and quality teams so that waiting time is kept to a minimum.
Praktische Hinweise auf Basis ingenieurtechnischen Wissens; keine statistische Schätzung.
1Wahrscheinlichkeit und Evidenz
- Auftretenswahrscheinlichkeit
- 0,7 % [0,1–1,9 %]
- Erwarteter Anteil an der Verlustzeit
- 0,4 % [0,1–1,1 %]
- Anteil an der Verlustzeit bei Auftreten
- 57 % [46–68 %]
- Studien / Einheiten
- 79 / 101
- Evidenzgrad
- D
Grad D: 0 oder 1 Studie; die Schätzung beruht auf partiellem Pooling und Priori-Verteilungen, und das breite Intervall ist das Ergebnis.
2Wahrscheinlichkeit nach Segment
- Milchprodukte0,8 % [0,1–2,9 %]10 Studien
- Erfrischungsgetränke, abgefülltes Wasser und Säfte0,9 % [0,1–2,8 %]26 Studien
- Bier, Wein und Spirituosen0,7 % [0,1–2,8 %]12 Studien
- Backwaren und Teigwaren0,8 % [0,1–3,2 %]0 Studien
- Fleisch, Geflügel und Fisch0,8 % [0,1–3,0 %]4 Studien
- Obst- und Gemüseverarbeitung0,8 % [0,1–3,1 %]4 Studien
- Getreide- und Ölsaatenmüllerei0,8 % [0,1–2,8 %]3 Studien
- Zucker und Süßwaren0,8 % [0,1–3,0 %]3 Studien
- Snacks, Kaffee, Tee und sonstige Lebensmittel0,8 % [0,1–3,1 %]4 Studien
- Futtermittel und Heimtiernahrung0,8 % [0,1–3,1 %]4 Studien
- Lebensmittelherstellung (nicht spezifiziert oder gemischt)0,8 % [0,1–2,9 %]9 Studien
3Mechanismus, SCADA-Signatur und Gegenmaßnahme
Mechanismus
Ingenieurpraktische HinweiseThe production flow includes a quality check step where samples are drawn from the batch or line and tested for Brix, titratable acidity, pH and visual appearance before the product can be released to continue; this requires transporting the sample to a check station, performing the measurement or correlation calculation, and waiting for QC clearance. The physical location of the check station and the hand-off between production and quality personnel can add idle time that is organizational rather than mechanical in origin.
So zeigt sie sich in SCADA-Daten
Ingenieurpraktische HinweiseSCADA/MES records the line or workstation in a hold or wait state with no product movement and no active equipment fault alarm, often logged as an unspecified or organizational stop. Cycle or batch counters pause while awaiting lab or correlation-based results, and relocating the check station can shift the timing or sequence of logged events relative to upstream and downstream stations.
Gegenmaßnahme
Ingenieurpraktische HinweiseReplace or complement off-line laboratory testing with inline or at-line rapid Brix-pH-acidity measurement to shorten the wait for release, position the check station to minimize sample transport distance, and establish clear hand-off procedures and release criteria between production and quality teams so that waiting time is kept to a minimum.
4Quellen
- An implementation of lean technology to improve the lead time of syrup batching process and reduce hot fill line downtime (2023)Quelle öffnenVerlustzeit: 20,0 min · laut Bericht: “quality check step (QC parameters: Brix, acidity, pH, appearance)”
Wörtliches Zitat anzeigen
The total time for QC to complete the job is around 20 minutes.
- An implementation of lean technology to improve the lead time of syrup batching process and reduce hot fill line downtime (2023)Quelle öffnenVerlustzeit: 5,00 min · laut Bericht: “quality check step after rearrangement”
Wörtliches Zitat anzeigen
After rearranging the quality test for syrup output parameters, the time to complete batching and move to filling step is shortened to only 5 minutes.
- An implementation of lean technology to improve the lead time of syrup batching process and reduce hot fill line downtime (2023)Quelle öffnenAnteil an der Verlustzeit: 8,57 % · laut Bericht: “Brix check station relocation”
Wörtliches Zitat anzeigen
The process is cut down 10-12 minutes of downtime (8.57%).
- An implementation of lean technology to improve the lead time of syrup batching process and reduce hot fill line downtime (2023)Quelle öffnenMittlere Ereignisdauer: 20,0 min · laut Bericht: “quality check for Brix, acidity (TA), pH, appearance”
Wörtliches Zitat anzeigen
The total time for QC to complete the job is around 20 minutes.
- An implementation of lean technology to improve the lead time of syrup batching process and reduce hot fill line downtime (2023)Quelle öffnenMittlere Ereignisdauer: 5,00 min · laut Bericht: “quality check for Brix, pH, TA using correlation equation method”
Wörtliches Zitat anzeigen
After rearranging the quality test for syrup output parameters, the time to complete batching and move to filling step is shortened to only 5 minutes. In addition, it ensures that the product quality meet the standards when the TA measurement step is taken place at the same time with the filling stage.