CHANGEOVER TIME REDUCTION THROUGH LEAN TOOL “SMED” – A CASE STUDY FROM FOOD SECTOR

Abrir fuente

1Ficha bibliográfica

Autores
Kateřina Gálová
Año
2018
Publicación
International Bata Conference for Ph.D. Students and Young Researchers (DOKBAT)
País
Czech Republic
Segmento
Azúcar y confitería
Familia de procesos
Formado, horneado y cocción
Tipo de estudio
Intervención antes/después
Alcance de la extracción
Texto completo
Tamaño
1 plantas · 5 líneas · — máquinas
Periodo de observación
365 días
Recolección de datos
automatic_monitoring
Intervención
Ver el contexto tal como lo describe el estudio
The plant itself, in which the case study was processed, focuses on the production of chocolate and chocolate confectionery.

2Riesgo de sesgo

Puntuado con la rúbrica del protocolo: 2 preocupación baja, 1 algunas preocupaciones, 0 preocupación alta.
Puntuación total 10Riesgo moderado
ÍtemPuntuación
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described.2 / 2
Is the observation period long enough and reported?Period reported but shorter than 30 days, or only the number of shifts is given.1 / 2
How were loss data collected?Manual logs or maintenance records with unknown completeness.1 / 2
Are OEE, loading time and the loss categories defined explicitly?A standard definition is cited but its application is not shown.1 / 2
Does the loss breakdown account for the total loss it claims to explain?Only the top causes are reported and the unexplained remainder can be computed.1 / 2
Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method.2 / 2
Are the reported numbers internally consistent?Small inconsistencies (2 to 10 percentage points) or values that cannot be cross-checked.1 / 2
Could conflicts of interest or the source of the data bias the result?Authors are employees of the plant or of an equipment/software vendor; no declaration.1 / 2

3Datos extraídos

Cada dato con su clasificación y la cita textual que lo establece.
Causa reportadaCategoría de pérdidaMétricaValorExtracción
—
Ver cita textual (Section 4.2 Actual impacts of the project, p.111)
Savings in the form of released production were 21 tons / year.
noneCapacidad de producción21.0 tons/yearAmbos extractores coincidieron
Internal activities
Ver cita textual (Section 4.2, Figure 9, p.111)
Internal activities occupied 83% of the total time.
Setups y ajustesProporción del tiempo perdido83.0 %Ambos extractores coincidieron
changeover (selected type, average, long-run)
Ver cita textual (Section 4.2 Actual impacts of the project, p.111)
The new changeover time was even lower than the project goal, but in the long run, the time was 210 minutes. This time is kept without any major problems.
Setups y ajustesDuración media del evento210 minAmbos extractores coincidieron
changeover (selected type, annual frequency)
Ver cita textual (Section 4.2, p.109)
At a frequency of 58 changeovers per year and with a given number of operators and wage rates, the annual savings would be 91 thousand. CZK.
Setups y ajustesNúmero de eventos58.0 events/yearAmbos extractores coincidieron
changeover (selected type, average)
Ver cita textual (Section 4.2 Specification of the project objective, p.109)
The project team decided on the main goal of the project, which was to reduce the time of the selected sort by 10% of the average changeover time, from 244 minutes to 220 minutes.
Setups y ajustesDuración media del evento244 minAmbos extractores coincidieron
Planned stoppages
Ver cita textual (Section 4.1 / Figure 4, p.108)
It is clear from the chart that the most important were planned stoppages with total time 10184 hours.
Paro planificado (mantenimiento programado, descansos, sin demanda)Tiempo perdido10,184 hoursUn solo extractor
Planned stoppages
Ver cita textual (Section 5 Conclusion, p.113)
Plates fall into planned stoppages, accounting for 61% of all stoppages of the company.
Paro planificado (mantenimiento programado, descansos, sin demanda)Proporción del tiempo perdido61.0 %Un solo extractor
Changeovers
Ver cita textual (Section 5 Conclusion, p.113)
Changeovers on a particular selected line then account for a total of 77% of all planned stoppages on this line.
Setups y ajustesProporción del tiempo perdido77.0 %Un solo extractor
changeover (most frequent type)
Ver cita textual (Section 4.1, Figure 8, p.109)
Of these types of changeovers, the fourth longest changeover was the most frequent (which would take 185 minutes), but the longest and second most frequent type of changeover (240 minutes) was eventually chosen by project team for the next step.
Setups y ajustesDuración media del evento185 minUn solo extractor
changeover (selected type for SMED project)
Ver cita textual (Section 4.1, Figure 8, p.109)
Of these types of changeovers, the fourth longest changeover was the most frequent (which would take 185 minutes), but the longest and second most frequent type of changeover (240 minutes) was eventually chosen by project team for the next step.
Setups y ajustesDuración media del evento240 minUn solo extractor
External activities
Ver cita textual (Figure 9, p.111)
internal; 83% external; 17% breakdown; 6% Figure 9 Internal vs external activities. Source: own
Setups y ajustesProporción del tiempo perdido17.0 %Un solo extractor
breakdown (within changeover)valve
Ver cita textual (Figure 9, p.111)
internal; 83% external; 17% breakdown; 6% Figure 9 Internal vs external activities. Source: own
Fallas de equipo (averías)Proporción del tiempo perdido6.00 %Un solo extractor
changeover (selected type, average, first re-measurement)
Ver cita textual (Section 4.2 Actual impacts of the project, p.111)
The average throw time dropped from 244 minutes to 194 minutes (Figure 7) and the target was met.
Setups y ajustesDuración media del evento194 minUn solo extractor
Flushing masses
Ver cita textual (Table 6 (Changeover activities))
Flushing masses: 0:39:00
Setups y ajustesDuración media del evento39.0 minUn solo extractor
Dismantling the divider
Ver cita textual (Table 6 (Changeover activities))
Dismantling the divider: 0:28:00
Setups y ajustesDuración media del evento28.0 minUn solo extractor
Assembly of dividers
Ver cita textual (Table 6 (Changeover activities))
Assembly of dividers: 0:22:00
Setups y ajustesDuración media del evento22.0 minUn solo extractor
Valve failure
Ver cita textual (Table 6 (Changeover activities))
Valve failure: 0:13:00
Setups y ajustesDuración media del evento13.0 minUn solo extractor
Flush with butter
Ver cita textual (Table 6 (Changeover activities))
Flush with butter: 0:06:00
Setups y ajustesDuración media del evento6.00 minUn solo extractor
Exchange of molds
Ver cita textual (Table 6 (Changeover activities))
Exchange of molds: 0:04:00
Setups y ajustesDuración media del evento4.00 minUn solo extractor
Forming of molds
Ver cita textual (Table 6 (Changeover activities))
Forming of molds: 0:07:00
Setups y ajustesDuración media del evento7.00 minUn solo extractor
Blowing the front of the bass
Ver cita textual (Table 6 (Changeover activities))
Blowing the front of the bass: 0:06:00
Setups y ajustesDuración media del evento6.00 minUn solo extractor
Start of production
Ver cita textual (Table 6 (Changeover activities))
Start of production: 0:03:00
Setups y ajustesDuración media del evento3.00 minUn solo extractor
First good form
Ver cita textual (Table 6 (Changeover activities))
First good form: 0:03:00
Setups y ajustesDuración media del evento3.00 minUn solo extractor
First good product
Ver cita textual (Table 6 (Changeover activities))
First good product: 0:27:00
Setups y ajustesDuración media del evento27.0 minUn solo extractor
—
Ver cita textual (Section 4.2, Table 8 (Financial impact of the project))
At a frequency of 58 changeovers per year and with a given number of operators and wage rates, the annual savings would be 91 thousand. CZK.
Setups y ajustesNúmero de eventos58.0 eventsUn solo extractor

Unidades de observación

  • D1 line · Formado, moldeado y dosificado · Después de la intervención
  • D1 line · Formado, moldeado y dosificado · Línea base
  • Whole plant · Línea completa o equipo sin especificar · Línea base