CHANGEOVER TIME REDUCTION THROUGH LEAN TOOL “SMED” – A CASE STUDY FROM FOOD SECTOR
1Ficha bibliográfica
- Autores
- Kateřina Gálová
- Año
- 2018
- Publicación
- International Bata Conference for Ph.D. Students and Young Researchers (DOKBAT)
- País
- Czech Republic
- Segmento
- Azúcar y confitería
- Familia de procesos
- Formado, horneado y cocción
- Tipo de estudio
- Intervención antes/después
- Alcance de la extracción
- Texto completo
- Tamaño
- 1 plantas · 5 líneas · — máquinas
- Periodo de observación
- 365 días
- Recolección de datos
- automatic_monitoring
- Intervención
Ver el contexto tal como lo describe el estudio
The plant itself, in which the case study was processed, focuses on the production of chocolate and chocolate confectionery.
2Riesgo de sesgo
Puntuado con la rúbrica del protocolo: 2 preocupación baja, 1 algunas preocupaciones, 0 preocupación alta.
Puntuación total 10Riesgo moderado
| Ítem | Puntuación |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described. | 2 / 2 |
| Is the observation period long enough and reported?Period reported but shorter than 30 days, or only the number of shifts is given. | 1 / 2 |
| How were loss data collected?Manual logs or maintenance records with unknown completeness. | 1 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?A standard definition is cited but its application is not shown. | 1 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?Only the top causes are reported and the unexplained remainder can be computed. | 1 / 2 |
| Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method. | 2 / 2 |
| Are the reported numbers internally consistent?Small inconsistencies (2 to 10 percentage points) or values that cannot be cross-checked. | 1 / 2 |
| Could conflicts of interest or the source of the data bias the result?Authors are employees of the plant or of an equipment/software vendor; no declaration. | 1 / 2 |
3Datos extraídos
Cada dato con su clasificación y la cita textual que lo establece.
| Causa reportada | Categoría de pérdida | Métrica | Valor | Extracción |
|---|---|---|---|---|
—Ver cita textual (Section 4.2 Actual impacts of the project, p.111)Savings in the form of released production were 21 tons / year. | none | Capacidad de producción | 21.0 tons/year | Ambos extractores coincidieron |
Internal activitiesVer cita textual (Section 4.2, Figure 9, p.111)Internal activities occupied 83% of the total time. | Setups y ajustes | Proporción del tiempo perdido | 83.0 % | Ambos extractores coincidieron |
changeover (selected type, average, long-run)Ver cita textual (Section 4.2 Actual impacts of the project, p.111)The new changeover time was even lower than the project goal, but in the long run, the time was 210 minutes. This time is kept without any major problems. | Setups y ajustes | Duración media del evento | 210 min | Ambos extractores coincidieron |
changeover (selected type, annual frequency)Ver cita textual (Section 4.2, p.109)At a frequency of 58 changeovers per year and with a given number of operators and wage rates, the annual savings would be 91 thousand. CZK. | Setups y ajustes | Número de eventos | 58.0 events/year | Ambos extractores coincidieron |
changeover (selected type, average)Ver cita textual (Section 4.2 Specification of the project objective, p.109)The project team decided on the main goal of the project, which was to reduce the time of the selected sort by 10% of the average changeover time, from 244 minutes to 220 minutes. | Setups y ajustes | Duración media del evento | 244 min | Ambos extractores coincidieron |
Planned stoppagesVer cita textual (Section 4.1 / Figure 4, p.108)It is clear from the chart that the most important were planned stoppages with total time 10184 hours. | Paro planificado (mantenimiento programado, descansos, sin demanda) | Tiempo perdido | 10,184 hours | Un solo extractor |
Planned stoppagesVer cita textual (Section 5 Conclusion, p.113)Plates fall into planned stoppages, accounting for 61% of all stoppages of the company. | Paro planificado (mantenimiento programado, descansos, sin demanda) | Proporción del tiempo perdido | 61.0 % | Un solo extractor |
ChangeoversVer cita textual (Section 5 Conclusion, p.113)Changeovers on a particular selected line then account for a total of 77% of all planned stoppages on this line. | Setups y ajustes | Proporción del tiempo perdido | 77.0 % | Un solo extractor |
changeover (most frequent type)Ver cita textual (Section 4.1, Figure 8, p.109)Of these types of changeovers, the fourth longest changeover was the most frequent (which would take 185 minutes), but the longest and second most frequent type of changeover (240 minutes) was eventually chosen by project team for the next step. | Setups y ajustes | Duración media del evento | 185 min | Un solo extractor |
changeover (selected type for SMED project)Ver cita textual (Section 4.1, Figure 8, p.109)Of these types of changeovers, the fourth longest changeover was the most frequent (which would take 185 minutes), but the longest and second most frequent type of changeover (240 minutes) was eventually chosen by project team for the next step. | Setups y ajustes | Duración media del evento | 240 min | Un solo extractor |
External activitiesVer cita textual (Figure 9, p.111)internal; 83% external; 17% breakdown; 6% Figure 9 Internal vs external activities. Source: own | Setups y ajustes | Proporción del tiempo perdido | 17.0 % | Un solo extractor |
breakdown (within changeover)valveVer cita textual (Figure 9, p.111)internal; 83% external; 17% breakdown; 6% Figure 9 Internal vs external activities. Source: own | Fallas de equipo (averías) | Proporción del tiempo perdido | 6.00 % | Un solo extractor |
changeover (selected type, average, first re-measurement)Ver cita textual (Section 4.2 Actual impacts of the project, p.111)The average throw time dropped from 244 minutes to 194 minutes (Figure 7) and the target was met. | Setups y ajustes | Duración media del evento | 194 min | Un solo extractor |
Flushing massesVer cita textual (Table 6 (Changeover activities))Flushing masses: 0:39:00 | Setups y ajustes | Duración media del evento | 39.0 min | Un solo extractor |
Dismantling the dividerVer cita textual (Table 6 (Changeover activities))Dismantling the divider: 0:28:00 | Setups y ajustes | Duración media del evento | 28.0 min | Un solo extractor |
Assembly of dividersVer cita textual (Table 6 (Changeover activities))Assembly of dividers: 0:22:00 | Setups y ajustes | Duración media del evento | 22.0 min | Un solo extractor |
Valve failureVer cita textual (Table 6 (Changeover activities))Valve failure: 0:13:00 | Setups y ajustes | Duración media del evento | 13.0 min | Un solo extractor |
Flush with butterVer cita textual (Table 6 (Changeover activities))Flush with butter: 0:06:00 | Setups y ajustes | Duración media del evento | 6.00 min | Un solo extractor |
Exchange of moldsVer cita textual (Table 6 (Changeover activities))Exchange of molds: 0:04:00 | Setups y ajustes | Duración media del evento | 4.00 min | Un solo extractor |
Forming of moldsVer cita textual (Table 6 (Changeover activities))Forming of molds: 0:07:00 | Setups y ajustes | Duración media del evento | 7.00 min | Un solo extractor |
Blowing the front of the bassVer cita textual (Table 6 (Changeover activities))Blowing the front of the bass: 0:06:00 | Setups y ajustes | Duración media del evento | 6.00 min | Un solo extractor |
Start of productionVer cita textual (Table 6 (Changeover activities))Start of production: 0:03:00 | Setups y ajustes | Duración media del evento | 3.00 min | Un solo extractor |
First good formVer cita textual (Table 6 (Changeover activities))First good form: 0:03:00 | Setups y ajustes | Duración media del evento | 3.00 min | Un solo extractor |
First good productVer cita textual (Table 6 (Changeover activities))First good product: 0:27:00 | Setups y ajustes | Duración media del evento | 27.0 min | Un solo extractor |
—Ver cita textual (Section 4.2, Table 8 (Financial impact of the project))At a frequency of 58 changeovers per year and with a given number of operators and wage rates, the annual savings would be 91 thousand. CZK. | Setups y ajustes | Número de eventos | 58.0 events | Un solo extractor |
Unidades de observación
- D1 line · Formado, moldeado y dosificado · Después de la intervención
- D1 line · Formado, moldeado y dosificado · Línea base
- Whole plant · Línea completa o equipo sin especificar · Línea base