Estudio incluido
Application of Lean-Total Productive Maintenance Tools to Reduce Setup Times and Machine Stoppages on the Molding Line of an SME in the Food Industry
1Ficha bibliográfica
- Autores
- Renzo Peralta-Pereda, Frank Zamora, Juan Carlos Quiroz-Flores, Martin Fidel Collao-Diaz, Alberto Flores-Pérez
- Año
- 2023
- Publicación
- International Journal of Engineering and Technology
- País
- Peru
- Segmento
- Productos lácteos
- Familia de procesos
- Planta completa o sin especificar
- Tipo de estudio
- Intervención antes/después
- Alcance de la extracción
- Texto completo
- Tamaño
- 1 plantas · 1 líneas · 7 máquinas
- Periodo de observación
- 30 días
- Recolección de datos
- manual_logs
- Intervención
Ver el contexto tal como lo describe el estudio
For the validation, a data collection of the operation times and the necessary times for the analysis of the indicators was carried out, all this in one month for the production batches of cream ice cream in the presentation of 63 grams, obtaining as data the daily production of 5443 boxes of ice cream
2Riesgo de sesgo
Puntuado con la rúbrica del protocolo: 2 preocupación baja, 1 algunas preocupaciones, 0 preocupación alta.
Puntuación total 12Riesgo moderado
| Ítem | Puntuación |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described. | 2 / 2 |
| Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events). | 2 / 2 |
| How were loss data collected?Manual logs or maintenance records with unknown completeness. | 1 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?A standard definition is cited but its application is not shown. | 1 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?Only the top causes are reported and the unexplained remainder can be computed. | 1 / 2 |
| Is there evidence of selective reporting of favourable results?Intervention study in which baseline and post-intervention periods differ in length or method. | 1 / 2 |
| Are the reported numbers internally consistent?Recomputed totals, shares and OEE factors agree with the reported values within 2 percentage points. | 2 / 2 |
| Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result. | 2 / 2 |
3Datos extraídos
Cada dato con su clasificación y la cita textual que lo establece.
| Causa reportada | Categoría de pérdida | Métrica | Valor | Extracción |
|---|---|---|---|---|
—WrapperVer cita textual (Section IV.B)During the analysis period, the following machine stops were observed: 2 stops in the Mix Plant, 8 stops in the Freezer, 3 stops in the Cold Compressor and Boiler, 1 stop in the Air Compressor, 86 stops in the Palletizer and 25 in the Wrapper. | Fallas de equipo (averías) | Número de eventos | 25.0 events | Ambos extractores coincidieron |
—PalletizerVer cita textual (Section IV.B)During the analysis period, the following machine stops were observed: 2 stops in the Mix Plant, 8 stops in the Freezer, 3 stops in the Cold Compressor and Boiler, 1 stop in the Air Compressor, 86 stops in the Palletizer and 25 in the Wrapper. | Fallas de equipo (averías) | Número de eventos | 86.0 events | Ambos extractores coincidieron |
—Air CompressorVer cita textual (Section IV.B)During the analysis period, the following machine stops were observed: 2 stops in the Mix Plant, 8 stops in the Freezer, 3 stops in the Cold Compressor and Boiler, 1 stop in the Air Compressor, 86 stops in the Palletizer and 25 in the Wrapper. | Fallas de equipo (averías) | Número de eventos | 1.00 events | Ambos extractores coincidieron |
—BoilerVer cita textual (Section IV.B)During the analysis period, the following machine stops were observed: 2 stops in the Mix Plant, 8 stops in the Freezer, 3 stops in the Cold Compressor and Boiler, 1 stop in the Air Compressor, 86 stops in the Palletizer and 25 in the Wrapper. | Fallas de equipo (averías) | Número de eventos | 3.00 events | Ambos extractores coincidieron |
—Cold CompressorVer cita textual (Section IV.B)During the analysis period, the following machine stops were observed: 2 stops in the Mix Plant, 8 stops in the Freezer, 3 stops in the Cold Compressor and Boiler, 1 stop in the Air Compressor, 86 stops in the Palletizer and 25 in the Wrapper. | Fallas de equipo (averías) | Número de eventos | 3.00 events | Ambos extractores coincidieron |
—FreezerVer cita textual (Section IV.B)During the analysis period, the following machine stops were observed: 2 stops in the Mix Plant, 8 stops in the Freezer, 3 stops in the Cold Compressor and Boiler, 1 stop in the Air Compressor, 86 stops in the Palletizer and 25 in the Wrapper. | Fallas de equipo (averías) | Número de eventos | 8.00 events | Ambos extractores coincidieron |
—Mix PlantVer cita textual (Section IV.B)During the analysis period, the following machine stops were observed: 2 stops in the Mix Plant, 8 stops in the Freezer, 3 stops in the Cold Compressor and Boiler, 1 stop in the Air Compressor, 86 stops in the Palletizer and 25 in the Wrapper. | Fallas de equipo (averías) | Número de eventos | 2.00 events | Ambos extractores coincidieron |
—Ver cita textual (Section IV.B)A global average MTBF (Mean Time Between Failures) equivalent to 185.22 h was obtained and concerning the MTTR (Mean Time to Repair), a global average of 88.45 minutes/stop was obtained for the machines. | Fallas de equipo (averías) | Duración media del evento | 88.5 min/stop | Ambos extractores coincidieron |
—Ver cita textual (Section IV.B)A global average MTBF (Mean Time Between Failures) equivalent to 185.22 h was obtained and concerning the MTTR (Mean Time to Repair), a global average of 88.45 minutes/stop was obtained for the machines. | Fallas de equipo (averías) | Tiempo entre eventos | 185 h | Ambos extractores coincidieron |
Total duration of mold changeVer cita textual (Section IV.B / Table II)From the data collection of the total duration of mold change times, a total of 280 minutes on average was obtained, and the times of internal activities, 254 min, and external activities, 26 min. | Setups y ajustes | Tiempo perdido | 280 min | Un solo extractor |
Duration of internal activitiesVer cita textual (Section IV.B / Table II)From the data collection of the total duration of mold change times, a total of 280 minutes on average was obtained, and the times of internal activities, 254 min, and external activities, 26 min. | Setups y ajustes | Tiempo perdido | 254 min | Un solo extractor |
Duration of external activitiesVer cita textual (Section IV.B / Table II)From the data collection of the total duration of mold change times, a total of 280 minutes on average was obtained, and the times of internal activities, 254 min, and external activities, 26 min. | Setups y ajustes | Tiempo perdido | 26.0 min | Un solo extractor |
mold changeVer cita textual (Page 4, Section B (Initial Diagnosis); Table II)From the data collection of the total duration of mold change times, a total of 280 minutes on average was obtained | Setups y ajustes | Duración media del evento | 280 min | Un solo extractor |
internal activitiesVer cita textual (Page 4, Section B)the times of internal activities, 254 min, and external activities, 26 min | Setups y ajustes | Duración media del evento | 254 min | Un solo extractor |
external activitiesVer cita textual (Page 4, Section B)the times of internal activities, 254 min, and external activities, 26 min | Setups y ajustes | Duración media del evento | 26.0 min | Un solo extractor |
—Ver cita textual (Page 4, Section B)obtaining as data the daily production of 5443 boxes of ice cream (each box contains 40 popsicles of cream ice cream) | none | Capacidad de producción | 5,443 boxes/day | Un solo extractor |
Unidades de observación
- Wrapper · Envasado (formado, sellado, envoltura, encajado, paletizado) · Línea base
- Palletizer · Envasado (formado, sellado, envoltura, encajado, paletizado) · Línea base
- Air Compressor · Servicios (vapor, aire comprimido, agua helada, energía) · Línea base
- Boiler · Servicios (vapor, aire comprimido, agua helada, energía) · Línea base
- Cold Compressor · Servicios (vapor, aire comprimido, agua helada, energía) · Línea base
- Freezer · Refrigeración y congelación · Línea base
- Mix Plant · Mezclado · Línea base
- Molding line (mold change / setup process) · Formado, moldeado y dosificado · Línea base
- Molding line · Línea completa o equipo sin especificar · Línea base