Syrup batching changeover and setup time
Die wissenschaftlichen Inhalte dieser Seite werden auf Englisch und Spanisch veröffentlicht; hier werden sie auf Englisch angezeigt.
Kurz gefasst
Sie tritt bei etwa 1 von 100 untersuchten Linien auf.
Wenn sie auftritt, entfällt auf sie im Mittel etwa 57 % der Verlustzeit der Linie. Berichtet von 2 der 31 Studien, die sie beobachten konnten (begrenzte Evidenz).
Was passiert
Between successive syrup batches the mixing tank must be emptied, cleaned if required, recharged with water and ingredients, and brought to the target concentration, temperature and homogeneity before the batch is released to the filling line. This preparation sequence, together with recipe selection and verification, consumes time during which no usable syrup is produced.
Was man dagegen tut
Standardize and pre-stage ingredient quantities, automate recipe loading and parameter checks in the batch control system, and overlap tank cleaning or charging with upstream or downstream line activities so that the preparation sequence runs in parallel rather than in series with filling demand.
Praktische Hinweise auf Basis ingenieurtechnischen Wissens; keine statistische Schätzung.
1Wahrscheinlichkeit und Evidenz
- Auftretenswahrscheinlichkeit
- 1,3 % [0,3–3,8 %]
- Erwarteter Anteil an der Verlustzeit
- 0,7 % [0,1–2,1 %]
- Anteil an der Verlustzeit bei Auftreten
- 57 % [45–67 %]
- Studien / Einheiten
- 31 / 40
- Evidenzgrad
- C
Grad C: 2 bis 4 Studien oder eine Intervallbreite über 0,35.
2Wahrscheinlichkeit nach Segment
- Milchprodukte1,5 % [0,1–5,7 %]6 Studien
- Erfrischungsgetränke, abgefülltes Wasser und Säfte2,2 % [0,2–7,8 %]2 Studien
- Bier, Wein und Spirituosen1,5 % [0,2–5,7 %]0 Studien
- Backwaren und Teigwaren2,1 % [0,2–7,3 %]2 Studien
- Fleisch, Geflügel und Fisch1,6 % [0,1–5,9 %]1 Studie
- Obst- und Gemüseverarbeitung1,5 % [0,1–6,0 %]2 Studien
- Getreide- und Ölsaatenmüllerei1,6 % [0,1–6,1 %]0 Studien
- Zucker und Süßwaren1,5 % [0,1–5,8 %]3 Studien
- Snacks, Kaffee, Tee und sonstige Lebensmittel1,5 % [0,1–5,1 %]3 Studien
- Futtermittel und Heimtiernahrung1,4 % [0,2–5,3 %]5 Studien
- Lebensmittelherstellung (nicht spezifiziert oder gemischt)1,5 % [0,1–5,4 %]7 Studien
3Mechanismus, SCADA-Signatur und Gegenmaßnahme
Mechanismus
Ingenieurpraktische HinweiseBetween successive syrup batches the mixing tank must be emptied, cleaned if required, recharged with water and ingredients, and brought to the target concentration, temperature and homogeneity before the batch is released to the filling line. This preparation sequence, together with recipe selection and verification, consumes time during which no usable syrup is produced.
So zeigt sie sich in SCADA-Daten
Ingenieurpraktische HinweiseMES/SCADA shows an extended batch or setup state between the end of discharge of the previous batch and the start of stable mixing, with recipe-load and ingredient-charging events clustered in this window; total batch lead time recorded by the system is dominated by this non-productive segment rather than by active mixing time.
Gegenmaßnahme
Ingenieurpraktische HinweiseStandardize and pre-stage ingredient quantities, automate recipe loading and parameter checks in the batch control system, and overlap tank cleaning or charging with upstream or downstream line activities so that the preparation sequence runs in parallel rather than in series with filling demand.
4Quellen
- An implementation of lean technology to improve the lead time of syrup batching process and reduce hot fill line downtime (2023)Quelle öffnenVerlustzeit: 140 min · laut Bericht: “total leading time of syrup batching process”
Wörtliches Zitat anzeigen
Total leading time of recently batching syrup process for new product is 140 minutes.
- An implementation of lean technology to improve the lead time of syrup batching process and reduce hot fill line downtime (2023)Quelle öffnenVerlustzeit: 98,0 min · laut Bericht: “total leading time of syrup batching process”
Wörtliches Zitat anzeigen
The project results obtained that the total time in the syrup batching process was reduced from 140 minutes to 98 minutes - a dramatic decrease of 42 minutes (equivalent to a 30% reduction) as shown on Figure 11.
- Productivity Improvement in a Bakery and Pastry Premix Company by Applying Preventive Maintenance, SMED and 5´S (2026)Quelle öffnenMittlere Ereignisdauer: 27,3 min · laut Bericht: “Total Time”
Wörtliches Zitat anzeigen
Total Time 27.25 18.22 9.04
- Productivity Improvement in a Bakery and Pastry Premix Company by Applying Preventive Maintenance, SMED and 5´S (2026)Quelle öffnenMittlere Ereignisdauer: 18,2 min · laut Bericht: “Total Time”
Wörtliches Zitat anzeigen
Total Time 27.25 18.22 9.04