Eingeschlossene Studie
Application of Lean-Total Productive Maintenance Tools to Reduce Setup Times and Machine Stoppages on the Molding Line of an SME in the Food Industry
1Bibliografische Angaben
- Autoren
- Renzo Peralta-Pereda, Frank Zamora, Juan Carlos Quiroz-Flores, Martin Fidel Collao-Diaz, Alberto Flores-Pérez
- Jahr
- 2023
- Publikationsorgan
- International Journal of Engineering and Technology
- Land
- Peru
- Segment
- Milchprodukte
- Prozessfamilie
- Gesamtwerk oder nicht spezifiziert
- Studientyp
- Vorher-nachher-Intervention
- Extraktionsumfang
- Volltext
- Umfang
- 1 Werke · 1 Linien · 7 Maschinen
- Beobachtungszeitraum
- 30 Tage
- Datenerhebung
- manual_logs
- Intervention
Umfeld laut Studie anzeigen
For the validation, a data collection of the operation times and the necessary times for the analysis of the indicators was carried out, all this in one month for the production batches of cream ice cream in the presentation of 63 grams, obtaining as data the daily production of 5443 boxes of ice cream
2Verzerrungsrisiko
Bewertet nach dem Schema des Protokolls: 2 geringe Bedenken, 1 einige Bedenken, 0 hohe Bedenken.
Gesamtpunktzahl 12Mittleres Risiko
| Kriterium | Punkte |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described. | 2 / 2 |
| Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events). | 2 / 2 |
| How were loss data collected?Manual logs or maintenance records with unknown completeness. | 1 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?A standard definition is cited but its application is not shown. | 1 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?Only the top causes are reported and the unexplained remainder can be computed. | 1 / 2 |
| Is there evidence of selective reporting of favourable results?Intervention study in which baseline and post-intervention periods differ in length or method. | 1 / 2 |
| Are the reported numbers internally consistent?Recomputed totals, shares and OEE factors agree with the reported values within 2 percentage points. | 2 / 2 |
| Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result. | 2 / 2 |
3Extrahierte Daten
Jeder Datenpunkt mit seiner Einordnung und dem wörtlichen Zitat, das ihn belegt.
| Berichtete Ursache | Verlustkategorie | Kennzahl | Wert | Extraktion |
|---|---|---|---|---|
—WrapperWörtliches Zitat anzeigen (Section IV.B)During the analysis period, the following machine stops were observed: 2 stops in the Mix Plant, 8 stops in the Freezer, 3 stops in the Cold Compressor and Boiler, 1 stop in the Air Compressor, 86 stops in the Palletizer and 25 in the Wrapper. | Anlagenausfall (Störungen) | Anzahl der Ereignisse | 25,0 events | Beide Extraktionen übereinstimmend |
—PalletizerWörtliches Zitat anzeigen (Section IV.B)During the analysis period, the following machine stops were observed: 2 stops in the Mix Plant, 8 stops in the Freezer, 3 stops in the Cold Compressor and Boiler, 1 stop in the Air Compressor, 86 stops in the Palletizer and 25 in the Wrapper. | Anlagenausfall (Störungen) | Anzahl der Ereignisse | 86,0 events | Beide Extraktionen übereinstimmend |
—Air CompressorWörtliches Zitat anzeigen (Section IV.B)During the analysis period, the following machine stops were observed: 2 stops in the Mix Plant, 8 stops in the Freezer, 3 stops in the Cold Compressor and Boiler, 1 stop in the Air Compressor, 86 stops in the Palletizer and 25 in the Wrapper. | Anlagenausfall (Störungen) | Anzahl der Ereignisse | 1,00 events | Beide Extraktionen übereinstimmend |
—BoilerWörtliches Zitat anzeigen (Section IV.B)During the analysis period, the following machine stops were observed: 2 stops in the Mix Plant, 8 stops in the Freezer, 3 stops in the Cold Compressor and Boiler, 1 stop in the Air Compressor, 86 stops in the Palletizer and 25 in the Wrapper. | Anlagenausfall (Störungen) | Anzahl der Ereignisse | 3,00 events | Beide Extraktionen übereinstimmend |
—Cold CompressorWörtliches Zitat anzeigen (Section IV.B)During the analysis period, the following machine stops were observed: 2 stops in the Mix Plant, 8 stops in the Freezer, 3 stops in the Cold Compressor and Boiler, 1 stop in the Air Compressor, 86 stops in the Palletizer and 25 in the Wrapper. | Anlagenausfall (Störungen) | Anzahl der Ereignisse | 3,00 events | Beide Extraktionen übereinstimmend |
—FreezerWörtliches Zitat anzeigen (Section IV.B)During the analysis period, the following machine stops were observed: 2 stops in the Mix Plant, 8 stops in the Freezer, 3 stops in the Cold Compressor and Boiler, 1 stop in the Air Compressor, 86 stops in the Palletizer and 25 in the Wrapper. | Anlagenausfall (Störungen) | Anzahl der Ereignisse | 8,00 events | Beide Extraktionen übereinstimmend |
—Mix PlantWörtliches Zitat anzeigen (Section IV.B)During the analysis period, the following machine stops were observed: 2 stops in the Mix Plant, 8 stops in the Freezer, 3 stops in the Cold Compressor and Boiler, 1 stop in the Air Compressor, 86 stops in the Palletizer and 25 in the Wrapper. | Anlagenausfall (Störungen) | Anzahl der Ereignisse | 2,00 events | Beide Extraktionen übereinstimmend |
—Wörtliches Zitat anzeigen (Section IV.B)A global average MTBF (Mean Time Between Failures) equivalent to 185.22 h was obtained and concerning the MTTR (Mean Time to Repair), a global average of 88.45 minutes/stop was obtained for the machines. | Anlagenausfall (Störungen) | Mittlere Ereignisdauer | 88,5 min/stop | Beide Extraktionen übereinstimmend |
—Wörtliches Zitat anzeigen (Section IV.B)A global average MTBF (Mean Time Between Failures) equivalent to 185.22 h was obtained and concerning the MTTR (Mean Time to Repair), a global average of 88.45 minutes/stop was obtained for the machines. | Anlagenausfall (Störungen) | Zeit zwischen Ereignissen | 185 h | Beide Extraktionen übereinstimmend |
Total duration of mold changeWörtliches Zitat anzeigen (Section IV.B / Table II)From the data collection of the total duration of mold change times, a total of 280 minutes on average was obtained, and the times of internal activities, 254 min, and external activities, 26 min. | Rüsten und Einstellen | Verlustzeit | 280 min | Einfache Extraktion |
Duration of internal activitiesWörtliches Zitat anzeigen (Section IV.B / Table II)From the data collection of the total duration of mold change times, a total of 280 minutes on average was obtained, and the times of internal activities, 254 min, and external activities, 26 min. | Rüsten und Einstellen | Verlustzeit | 254 min | Einfache Extraktion |
Duration of external activitiesWörtliches Zitat anzeigen (Section IV.B / Table II)From the data collection of the total duration of mold change times, a total of 280 minutes on average was obtained, and the times of internal activities, 254 min, and external activities, 26 min. | Rüsten und Einstellen | Verlustzeit | 26,0 min | Einfache Extraktion |
mold changeWörtliches Zitat anzeigen (Page 4, Section B (Initial Diagnosis); Table II)From the data collection of the total duration of mold change times, a total of 280 minutes on average was obtained | Rüsten und Einstellen | Mittlere Ereignisdauer | 280 min | Einfache Extraktion |
internal activitiesWörtliches Zitat anzeigen (Page 4, Section B)the times of internal activities, 254 min, and external activities, 26 min | Rüsten und Einstellen | Mittlere Ereignisdauer | 254 min | Einfache Extraktion |
external activitiesWörtliches Zitat anzeigen (Page 4, Section B)the times of internal activities, 254 min, and external activities, 26 min | Rüsten und Einstellen | Mittlere Ereignisdauer | 26,0 min | Einfache Extraktion |
—Wörtliches Zitat anzeigen (Page 4, Section B)obtaining as data the daily production of 5443 boxes of ice cream (each box contains 40 popsicles of cream ice cream) | none | Durchsatz | 5.443 boxes/day | Einfache Extraktion |
Beobachtungseinheiten
- Wrapper · Verpacken (Formen, Siegeln, Einschlagen, Kartonieren, Palettieren) · Ausgangslage
- Palletizer · Verpacken (Formen, Siegeln, Einschlagen, Kartonieren, Palettieren) · Ausgangslage
- Air Compressor · Betriebsmittelversorgung (Dampf, Druckluft, Kaltwasser, Strom) · Ausgangslage
- Boiler · Betriebsmittelversorgung (Dampf, Druckluft, Kaltwasser, Strom) · Ausgangslage
- Cold Compressor · Betriebsmittelversorgung (Dampf, Druckluft, Kaltwasser, Strom) · Ausgangslage
- Freezer · Kühlen und Gefrieren · Ausgangslage
- Mix Plant · Mischen und Vermengen · Ausgangslage
- Molding line (mold change / setup process) · Formen, Gießen und Dosieren · Ausgangslage
- Molding line · Gesamte Linie oder nicht spezifizierte Anlage · Ausgangslage