Lean and RCM-Based Production Model to Improve Operational Efficiency in the Production Line of a Peruvian Dairy SME

Quelle öffnen

1Bibliografische Angaben

Autoren
Gustavo Chaccha-Cuicapusa, Marco Antonio Flores-Chavez, Elmer Luis Tupia-De-La-Cruz
Jahr
2025
Publikationsorgan
International Journal of Industrial Engineering
Land
Peru
Segment
Milchprodukte
Prozessfamilie
Abfüll- und Verpackungslinie
Studientyp
Vorher-nachher-Intervention
Extraktionsumfang
Volltext
Umfang
1 Werke · 1 Linien · 1 Maschinen
Beobachtungszeitraum
365 Tage
Datenerhebung
manual_logs
Intervention
Umfeld laut Studie anzeigen
The company ran a factory that made and packaged drinkable yogurt in a variety of ways.

2Verzerrungsrisiko

Bewertet nach dem Schema des Protokolls: 2 geringe Bedenken, 1 einige Bedenken, 0 hohe Bedenken.
Gesamtpunktzahl 13Geringes Risiko
KriteriumPunkte
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described.2 / 2
Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events).2 / 2
How were loss data collected?Manual logs or maintenance records with unknown completeness.1 / 2
Are OEE, loading time and the loss categories defined explicitly?A standard definition is cited but its application is not shown.1 / 2
Does the loss breakdown account for the total loss it claims to explain?The reported causes or categories sum to at least 90% of the stated total, or an explicit "other" class closes the balance.2 / 2
Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method.2 / 2
Are the reported numbers internally consistent?Small inconsistencies (2 to 10 percentage points) or values that cannot be cross-checked.1 / 2
Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result.2 / 2

3Extrahierte Daten

Jeder Datenpunkt mit seiner Einordnung und dem wörtlichen Zitat, das ihn belegt.
Berichtete UrsacheVerlustkategorieKennzahlWertExtraktion
—
Wörtliches Zitat anzeigen (Section 4.3.3)
It was confirmed that system availability went up by 10.7 percentage points, the OEE of the filling subprocess went up from 60.4% to 70.6%, and the overall production OEE went up to 72.8%, which is an eight-percentage-point increase.
noneOEE72,8 %Beide Extraktionen übereinstimmend
—
Wörtliches Zitat anzeigen (Section 4.2)
This result showed that the average efficiency level over the past twelve months was 67.7%, which is lower than the industry standard.
noneOEE67,7 %Beide Extraktionen übereinstimmend
—filling machine
Wörtliches Zitat anzeigen (Section 4.3.3)
It was confirmed that system availability went up by 10.7 percentage points, the OEE of the filling subprocess went up from 60.4% to 70.6%, and the overall production OEE went up to 72.8%, which is an eight-percentage-point increase.
noneOEE70,6 %Beide Extraktionen übereinstimmend
product losses during the filling processfilling machine
Wörtliches Zitat anzeigen (Section 4.2)
The analysis found two main reasons for this inefficiency: unproductive time during the packaging process, which made up 63% of the problem, and product losses during the filling process, which made up the other 37%.
Prozessfehler (Ausschuss und Nacharbeit)Anteil an der Verlustzeit37,0 %Beide Extraktionen übereinstimmend
setup time delaysfilling machine
Wörtliches Zitat anzeigen (Section 4.2)
The first reason had a lot of problems that caused the filling machine to break down often (55.8% of the problems) and setup time delays (44.2% of the inefficiencies).
Rüsten und EinstellenAnteil an der Verlustzeit44,2 %Beide Extraktionen übereinstimmend
—filling machine
Wörtliches Zitat anzeigen (Section 4.3.3)
It was confirmed that system availability went up by 10.7 percentage points, the OEE of the filling subprocess went up from 60.4% to 70.6%, and the overall production OEE went up to 72.8%, which is an eight-percentage-point increase.
noneOEE60,4 %Beide Extraktionen übereinstimmend
—filling machine
Wörtliches Zitat anzeigen (Section 4.3.2)
These numbers showed that the system broke down a lot and took a long time to recover, which meant it was only available 69.9% of the time.
noneVerfügbarkeit69,9 %Beide Extraktionen übereinstimmend
—filling machine
Wörtliches Zitat anzeigen (Section 4.3.2)
The system's Mean Time Between Failures (MTBF) was 3.57 hours, and the Mean Time to Repair (MTTR) was 1.53 hours before it was used.
Anlagenausfall (Störungen)Mittlere Ereignisdauer1,53 hBeide Extraktionen übereinstimmend
—filling machine
Wörtliches Zitat anzeigen (Section 4.3.2)
The system's Mean Time Between Failures (MTBF) was 3.57 hours, and the Mean Time to Repair (MTTR) was 1.53 hours before it was used.
Anlagenausfall (Störungen)Zeit zwischen Ereignissen3,57 hBeide Extraktionen übereinstimmend
filling machine break down oftenfilling machine
Wörtliches Zitat anzeigen (Section 4.2)
The first reason had a lot of problems that caused the filling machine to break down often (55.8% of the problems) and setup time delays (44.2% of the inefficiencies).
Anlagenausfall (Störungen)Anteil an der Verlustzeit55,8 %Beide Extraktionen übereinstimmend
—filling machine
Wörtliches Zitat anzeigen (Table 1)
MTTR hour 1.53 0.77 1.5 -2%
Anlagenausfall (Störungen)Mittlere Ereignisdauer1,50 hBeide Extraktionen übereinstimmend
—filling machine
Wörtliches Zitat anzeigen (Table 1)
MTBF hour 3.57 5.84 6.23 75%
Anlagenausfall (Störungen)Zeit zwischen Ereignissen6,23 hBeide Extraktionen übereinstimmend
—filling machine
Wörtliches Zitat anzeigen (Table 1)
Availability % 69.90% 80% 80.60% 15%
noneVerfügbarkeit80,6 %Beide Extraktionen übereinstimmend
setup timefilling machine
Wörtliches Zitat anzeigen (Section 4.3.1)
The average setup time alone was 37.5 minutes, which made things much less efficient and cut down on effective working time.
Rüsten und EinstellenVerlustzeit37,5 minEinfache Extraktion
setup timefilling machine
Wörtliches Zitat anzeigen (Figure 2 / Section 4.3.1)
The first setup took 37.3 minutes, but after using the method, it only took 16.3 minutes.
Rüsten und EinstellenVerlustzeit37,3 minEinfache Extraktion
unproductive time during the packaging processfilling machine
Wörtliches Zitat anzeigen (Section 4.2)
The analysis found two main reasons for this inefficiency: unproductive time during the packaging process, which made up 63% of the problem, and product losses during the filling process, which made up the other 37%.
Aus dem Bericht nicht klassifizierbarAnteil an der Verlustzeit63,0 %Einfache Extraktion
setup timefilling machine
Wörtliches Zitat anzeigen (Table 1)
Setup Time minutes 37.5 18.75 16.39 -56%
Rüsten und EinstellenVerlustzeit16,4 minEinfache Extraktion
setup timefilling machine
Wörtliches Zitat anzeigen (Figure 2 / Section 4.3.1)
The first setup took 37.3 minutes, but after using the method, it only took 16.3 minutes.
Rüsten und EinstellenVerlustzeit16,3 minEinfache Extraktion
—filling machine
Wörtliches Zitat anzeigen (Section 4.3.1)
The average setup time alone was 37.5 minutes
Rüsten und EinstellenMittlere Ereignisdauer37,5 minEinfache Extraktion
—filling machine
Wörtliches Zitat anzeigen (Table 1)
Setup Time | minutes | 37.5 | 18.75 | 16.39 | -56%
Rüsten und EinstellenMittlere Ereignisdauer16,4 minEinfache Extraktion

Beobachtungseinheiten

  • Overall production process · Gesamte Linie oder nicht spezifizierte Anlage · Nach der Intervention
  • Overall production process · Gesamte Linie oder nicht spezifizierte Anlage · Ausgangslage
  • Filling machine (packaging subprocess) · Abfüllen · Nach der Intervention
  • Filling machine (packaging subprocess) · Abfüllen · Ausgangslage
  • Packaging line · Abfüllen · Ausgangslage
  • Packaging line · Abfüllen · Nach der Intervention