It appears in about 1 of every 100 lines studied.

When it appears, it takes on average about 57 % of the line's lost time. Reported by 1 of the 37 studies that could observe it (sparse evidence).

What happens

When the line switches product, batch or screen configuration on the twin-screw press, the changeover is split into external activities that can be prepared or finished while the press is still running, and internal activities that can only be performed while the press is stopped, such as screw, screen or seal changes and adjustments. The total setup time lost is the sum of these internal and external tasks plus the time needed to reach stable, on-spec operation again.

What is done about it

Apply SMED methodology to systematically convert internal activities into external ones, standardize and pre-stage tooling, screens and spare parts, use quick-change fixtures and locating devices, and sequence operator tasks so that preparation and verification occur while the press is still processing the previous batch, minimizing the machine-stopped portion of the changeover.

Practical guidance written from engineering knowledge; it is not a statistical estimate.

1Probability and evidence

Pooled over all segments. A wide interval is a result: it states how much the evidence allows us to know.
Probability of presence
0.8% [0.1–2.6%]
Expected share of lost time
0.5% [0.1–1.5%]
Share of lost time when present
57% [45–68%]
Studies / units
37 / 44
Evidence grade
D

Grade D: 0 or 1 study; the estimate is driven by partial pooling and priors, and the wide interval is the result.

2Probability by segment

Partially pooled estimates for each industry segment.
  • Dairy products
    1.0% [0.1–4.0%]5 studies
  • Soft drinks, bottled water and juices
    1.0% [0.1–4.1%]1 study
  • Brewing, wine and spirits
    1.0% [0.1–4.1%]1 study
  • Bakery and pasta
    1.0% [0.1–4.4%]0 studies
  • Meat, poultry and seafood
    1.0% [0.1–3.9%]2 studies
  • Fruit and vegetable processing
    1.0% [0.1–3.7%]3 studies
  • Grain and oilseed milling
    1.0% [0.1–4.1%]6 studies
  • Sugar and confectionery
    1.0% [0.1–3.8%]3 studies
  • Snacks, coffee, tea and other foods
    1.0% [0.1–4.0%]4 studies
  • Animal feed and pet food
    1.4% [0.1–5.4%]5 studies
  • Food manufacturing (unspecified or mixed)
    1.0% [0.1–4.0%]7 studies

3Mechanism, SCADA signature and countermeasure

Engineering guidance that helps recognise and address the cause; it is not part of the statistical estimate.

Mechanism

Engineering guidance

When the line switches product, batch or screen configuration on the twin-screw press, the changeover is split into external activities that can be prepared or finished while the press is still running, and internal activities that can only be performed while the press is stopped, such as screw, screen or seal changes and adjustments. The total setup time lost is the sum of these internal and external tasks plus the time needed to reach stable, on-spec operation again.

How it looks in SCADA data

Engineering guidance

MES/SCADA logs show an extended machine state transition to changeover or stopped mode between the last good unit of the previous run and the first good unit of the next, with no production counts recorded; internal and external sub-periods may appear as separate operator-logged activity codes or manual timestamps within the same changeover event. Downstream and upstream equipment often show starvation or blocking states correlated with this stop.

Countermeasure

Engineering guidance

Apply SMED methodology to systematically convert internal activities into external ones, standardize and pre-stage tooling, screens and spare parts, use quick-change fixtures and locating devices, and sequence operator tasks so that preparation and verification occur while the press is still processing the previous batch, minimizing the machine-stopped portion of the changeover.

4Sources

Every extracted datum with its study, value and verbatim quote.
  1. Share of lost time: 45.9 % · as reported: “actividades externas”
    Show verbatim quote
    El tiempo para AE aumentó al 45,94% del total, en comparación con el 14,33% previo a la implementación.
  2. Share of lost time: 54.1 % · as reported: “actividades internas”
    Show verbatim quote
    El tiempo para AI fue el 54,06% del tiempo total de cambio, comparado con el 85,67% antes de la implementación, mostrando una reducción significativa en el tiempo que la línea de producción está detenida.
  3. Lost time: 37.5 min · as reported: “actividades externas”
    Show verbatim quote
    El tiempo para AI pasó de 95,86 minutos a 44,11 minutos (1,6 horas a 0,74 horas), mientras que para AE aumentó de 16,4 minutos a 37,49 minutos.
  4. Lost time: 44.1 min · as reported: “actividades internas”
    Show verbatim quote
    El tiempo para AI pasó de 95,86 minutos a 44,11 minutos (1,6 horas a 0,74 horas), mientras que para AE aumentó de 16,4 minutos a 37,49 minutos.
  5. Lost time: 5,752 s · as reported: “actividades internas”
    Show verbatim quote
    Se determinó que la duración de las actividades internas fue de 5751,7 segundos, es decir, 95,86 minutos (1.6 h), mientras que las actividades externas fue 962,4 segundos (16,4 min).
  6. Lost time: 962 s · as reported: “actividades externas”
    Show verbatim quote
    Se determinó que la duración de las actividades internas fue de 5751,7 segundos, es decir, 95,86 minutos (1.6 h), mientras que las actividades externas fue 962,4 segundos (16,4 min).
  7. Share of lost time: 14.3 % · as reported: “actividades externas”
    Show verbatim quote
    Y el 14,33% de las actividades realizadas pertenecen a elementos externos y se realizaran mientras la línea de producción se pone en marcha.
  8. Number of events: 29.0 pasos · as reported: “actividades internas”
    Show verbatim quote
    Las actividades internas representan 29 pasos, mientras que las externas solo 4.
  9. Number of events: 4.00 pasos · as reported: “actividades externas”
    Show verbatim quote
    Las actividades internas representan 29 pasos, mientras que las externas solo 4.
  10. Lost time: 4,896 s · as reported: “TOTAL”
    Show verbatim quote
    Tras implementar SMED, el tiempo total de cambio se redujo significativamente de 6714,1 segundos a 4896 segundos, mejorando tanto en actividades internas como externas.
  11. Number of events: 18.0 pasos · as reported: “actividades internas”
    Show verbatim quote
    El número de actividades internas disminuyó de 29 a 18 (un 37,93% menos) y las actividades externas aumentaron de 4 a 10, reconfigurando el proceso para mayor eficiencia (gráfico 6).
  12. Number of events: 10.0 pasos · as reported: “actividades externas”
    Show verbatim quote
    El número de actividades internas disminuyó de 29 a 18 (un 37,93% menos) y las actividades externas aumentaron de 4 a 10, reconfigurando el proceso para mayor eficiencia (gráfico 6).