Causes of loss
Canonical causes of stoppage and inefficiency, classified into the six big losses, with their probability of presence and evidence grade.
| Cause | Loss category | Probability of presence | Expected share of lost time | Evidence grade | Studies / units |
|---|---|---|---|---|---|
| Unplanned equipment breakdownWhole line or unspecified equipment | Equipment failure (breakdowns) | 11% [6–18%] | 6.3% [3.4–10.3%] | A | 127 / 161 |
| Changeover / setup timeWhole line or unspecified equipment | Setup and adjustments | 11% [6–17%] | 7.0% [3.7–11.6%] | A | 127 / 161 |
| Miscellaneous and unclassified lossesWhole line or unspecified equipment | not classifiable | 10% [5–17%] | 6.0% [3.1–10.0%] | A | 127 / 161 |
| Sterilizer piping and valve component failureSterilization (retort, UHT) | Equipment failure (breakdowns) | 6.2% [1.9–13.9%] | 3.7% [1.1–8.3%] | B | 34 / 37 |
| Packaging machine breakdownPackaging (forming, sealing, wrapping, case packing, palletizing) | Equipment failure (breakdowns) | 4.4% [1.9–8.4%] | 2.6% [1.1–4.8%] | A | 112 / 155 |
| Unspecified milling-area stoppage (mixed equipment/department code)Milling and grinding | Equipment failure (breakdowns) | 4.0% [1.2–9.2%] | 2.4% [0.7–5.6%] | B | 43 / 48 |
| Filler equipment breakdown (unspecified failure mode)Filling | Equipment failure (breakdowns) | 3.7% [1.4–7.5%] | 2.2% [0.8–4.4%] | A | 120 / 162 |
| Filler changeover and adjustmentFilling | Setup and adjustments | 3.6% [1.5–7.1%] | 2.0% [0.8–4.0%] | A | 120 / 162 |
| Dryer equipment malfunction and downtimeDrying | Equipment failure (breakdowns) | 3.6% [0.9–9.2%] | 2.1% [0.5–5.4%] | C | 28 / 32 |
| Raw material shortage or nonconformanceWhole line or unspecified equipment | organizational external | 3.1% [1.3–5.9%] | 1.7% [0.7–3.3%] | A | 127 / 161 |
| Sucrose Loss to Acid Hydrolysis in EvaporationEvaporation | Process defects (scrap and rework) | 2.5% [0.5–6.7%] | 1.2% [0.2–3.4%] | C | 29 / 34 |
| Labeling machine changeover and setupLabeling and coding | Setup and adjustments | 2.3% [0.8–5.1%] | 1.3% [0.4–2.9%] | B | 85 / 113 |
| Forming/blow-moulding machine breakdownForming, moulding and depositing | Equipment failure (breakdowns) | 2.3% [0.7–5.3%] | 1.3% [0.4–3.1%] | B | 76 / 96 |
| Minor stoppages on forming machinesForming, moulding and depositing | Idling and minor stops (micro-stops) | 2.2% [0.6–5.1%] | 1.1% [0.3–2.6%] | B | 76 / 96 |
| Reduced speed operation of forming equipmentForming, moulding and depositing | Reduced speed | 2.1% [0.6–5.0%] | 1.3% [0.4–3.2%] | C | 76 / 96 |
| Labeling machine equipment failureLabeling and coding | Equipment failure (breakdowns) | 2.0% [0.6–4.7%] | 1.2% [0.4–2.8%] | B | 85 / 113 |
| Idling and minor stoppagesWhole line or unspecified equipment | Idling and minor stops (micro-stops) | 1.9% [0.6–4.1%] | 1.0% [0.3–2.2%] | B | 127 / 161 |
| Unspecified production stoppage (pelletizing/forming)Forming, moulding and depositing | not classifiable | 1.8% [0.5–4.4%] | 1.1% [0.3–2.7%] | C | 76 / 96 |
| Minor stoppage of milling equipmentMilling and grinding | Idling and minor stops (micro-stops) | 1.8% [0.4–4.8%] | 1.0% [0.2–2.7%] | C | 43 / 48 |
| Unspecified process defectsWhole line or unspecified equipment | Process defects (scrap and rework) | 1.7% [0.6–3.7%] | 0.8% [0.3–1.7%] | B | 127 / 161 |
| Autoclave door/seal mechanism malfunctionSterilization (retort, UHT) | Equipment failure (breakdowns) | 1.7% [0.3–4.9%] | 1.0% [0.2–2.9%] | C | 34 / 37 |
| Unspecified packaging defectPackaging (forming, sealing, wrapping, case packing, palletizing) | Process defects (scrap and rework) | 1.6% [0.5–3.7%] | 0.8% [0.2–1.8%] | B | 112 / 155 |
| Extruder changeover (die/recipe change and line clearing)Extrusion | Setup and adjustments | 1.6% [0.4–4.2%] | 0.9% [0.2–2.5%] | C | 59 / 72 |
| Bearing failureSeparation (centrifugation, filtration, membranes) | Equipment failure (breakdowns) | 1.6% [0.3–4.4%] | 0.9% [0.2–2.6%] | C | 37 / 44 |
| Maintenance Program Downtime (Planned and Reactive)Whole line or unspecified equipment | planned downtime | 1.6% [0.5–3.6%] | 0.9% [0.3–2.0%] | B | 127 / 161 |
| Unspecified reduced-speed operation on packaging linePackaging (forming, sealing, wrapping, case packing, palletizing) | Reduced speed | 1.6% [0.5–3.6%] | 1.0% [0.3–2.3%] | C | 112 / 155 |
| Waiting for Raw Material or Ingredient SupplyWhole line or unspecified equipment | organizational external | 1.5% [0.5–3.5%] | 0.9% [0.3–2.1%] | B | 127 / 161 |
| Rework of off-specification productWhole line or unspecified equipment | Process defects (scrap and rework) | 1.5% [0.5–3.4%] | 0.7% [0.2–1.6%] | B | 127 / 161 |
| Screw press downtime of mixed/unrecorded causeSeparation (centrifugation, filtration, membranes) | not classifiable | 1.5% [0.3–4.2%] | 0.9% [0.2–2.4%] | C | 37 / 44 |
| Unspecified minor stoppage on filling lineFilling | Idling and minor stops (micro-stops) | 1.5% [0.5–3.3%] | 0.8% [0.3–1.9%] | B | 120 / 162 |
| Unspecified filler loss (unclassified cause)Filling | not classifiable | 1.4% [0.4–3.3%] | 0.8% [0.2–2.0%] | B | 120 / 162 |
| Mechanical, electrical or pneumatic component failureWhole line or unspecified equipment | Equipment failure (breakdowns) | 1.4% [0.5–3.2%] | 0.9% [0.3–1.9%] | B | 127 / 161 |
| Unspecified hammer mill stoppageMilling and grinding | not classifiable | 1.4% [0.3–4.1%] | 0.8% [0.2–2.3%] | C | 43 / 48 |
| Unspecified packaging line lossPackaging (forming, sealing, wrapping, case packing, palletizing) | not classifiable | 1.4% [0.4–3.2%] | 0.8% [0.2–1.8%] | C | 112 / 155 |
| Filling process quality defectsFilling | Process defects (scrap and rework) | 1.3% [0.4–3.1%] | 0.7% [0.2–1.6%] | B | 120 / 162 |
| Flexible package seal/forming defectPackaging (forming, sealing, wrapping, case packing, palletizing) | Process defects (scrap and rework) | 1.3% [0.4–3.0%] | 0.6% [0.2–1.5%] | C | 112 / 155 |
| Syrup batching changeover and setup timeMixing and blending | Setup and adjustments | 1.3% [0.3–3.8%] | 0.7% [0.1–2.1%] | C | 31 / 40 |
| Manual cleaning of mixing equipment during changeoverMixing and blending | Setup and adjustments | 1.3% [0.2–3.7%] | 0.7% [0.1–2.2%] | C | 31 / 40 |
| Product scrap and rejectionWhole line or unspecified equipment | Process defects (scrap and rework) | 1.3% [0.4–2.9%] | 0.6% [0.2–1.4%] | C | 127 / 161 |
| Format/mould changeover on forming equipmentForming, moulding and depositing | Setup and adjustments | 1.3% [0.3–3.2%] | 0.7% [0.2–1.9%] | C | 76 / 96 |
| Changeover and setup adjustment on grinding millMilling and grinding | Setup and adjustments | 1.3% [0.2–3.7%] | 0.7% [0.1–1.9%] | C | 43 / 48 |
| Miscellaneous non-specific line stoppageWhole line or unspecified equipment | organizational external | 1.3% [0.4–2.9%] | 0.7% [0.2–1.6%] | C | 127 / 161 |
| Separator running below rated throughputSeparation (centrifugation, filtration, membranes) | Reduced speed | 1.2% [0.2–3.9%] | 0.8% [0.1–2.5%] | D | 37 / 44 |
| HFCS transfer pump flow below design capacityMixing and blending | Reduced speed | 1.2% [0.2–3.7%] | 0.8% [0.1–2.4%] | D | 31 / 40 |
| Glass container breakageWhole line or unspecified equipment | Process defects (scrap and rework) | 1.2% [0.3–2.8%] | 0.6% [0.2–1.3%] | C | 127 / 161 |
| Reduced speed loss (cause not specified)Whole line or unspecified equipment | Reduced speed | 1.2% [0.3–2.8%] | 0.7% [0.2–1.8%] | C | 127 / 161 |
| Reduced hammer mill throughputMilling and grinding | Reduced speed | 1.2% [0.2–3.5%] | 0.7% [0.1–2.2%] | D | 43 / 48 |
| Grinding mill component wear causing reduced throughput and scrapMilling and grinding | Reduced speed | 1.1% [0.2–3.6%] | 0.7% [0.1–2.3%] | D | 43 / 48 |
| Capping/sealing equipment failureCapping and seaming | Equipment failure (breakdowns) | 1.1% [0.3–3.0%] | 0.7% [0.2–1.8%] | C | 82 / 109 |
| Reactive maintenance restart delayDrying | Equipment failure (breakdowns) | 1.1% [0.2–3.6%] | 0.6% [0.1–2.0%] | D | 28 / 32 |
| Filler running below rated speedFilling | Reduced speed | 1.1% [0.3–2.7%] | 0.7% [0.2–1.8%] | C | 120 / 162 |
| Forming machine drive/chain mechanical failureForming, moulding and depositing | Equipment failure (breakdowns) | 1.1% [0.2–3.0%] | 0.6% [0.1–1.7%] | C | 76 / 96 |
| Inadequate preventive maintenance (cleaning, lubrication, tensioning)Drying | Equipment failure (breakdowns) | 1.1% [0.2–3.3%] | 0.6% [0.1–1.9%] | D | 28 / 32 |
| Basic Condition and Operating Standard Non-CompliancePackaging (forming, sealing, wrapping, case packing, palletizing) | Equipment failure (breakdowns) | 1.1% [0.3–2.7%] | 0.6% [0.2–1.6%] | C | 112 / 155 |
| Proofer equipment failureFermentation | Equipment failure (breakdowns) | 1.1% [0.2–3.2%] | 0.6% [0.1–2.0%] | D | 29 / 33 |
| Baking process defects (under-proofed, burnt, contaminated product)Baking | Process defects (scrap and rework) | 1.1% [0.2–3.0%] | 0.5% [0.1–1.4%] | C | 60 / 73 |
| Pressure sensor/transmitter calibration drift (autoclave)Sterilization (retort, UHT) | Equipment failure (breakdowns) | 1.1% [0.2–3.2%] | 0.6% [0.1–1.9%] | D | 34 / 37 |
| Sterilizer conveyor chain derailmentSterilization (retort, UHT) | Equipment failure (breakdowns) | 1.1% [0.2–3.3%] | 0.6% [0.1–1.9%] | D | 34 / 37 |
| Control instrument misalignmentSterilization (retort, UHT) | Equipment failure (breakdowns) | 1.1% [0.2–3.3%] | 0.6% [0.1–1.9%] | D | 34 / 37 |
| Homogenizer mechanical/component failure (plunger, flange, monoblock, flowmeter)Homogenization | Equipment failure (breakdowns) | 1.1% [0.2–3.4%] | 0.6% [0.1–1.9%] | D | 28 / 34 |
| Homogenizer pressure instabilityHomogenization | Equipment failure (breakdowns) | 1.1% [0.2–3.2%] | 0.6% [0.1–1.8%] | D | 28 / 34 |
| Autoclave filter clogging causing overheatingSterilization (retort, UHT) | Equipment failure (breakdowns) | 1.1% [0.2–3.1%] | 0.6% [0.1–1.8%] | D | 34 / 37 |
| Structural failure of support railSterilization (retort, UHT) | Equipment failure (breakdowns) | 1.1% [0.2–3.2%] | 0.6% [0.1–1.8%] | D | 34 / 37 |
| Off-spec liquid product from pasteurized base tankPasteurization | Process defects (scrap and rework) | 1.0% [0.2–3.4%] | 0.5% [0.1–1.6%] | D | 26 / 29 |
| Unspecified fermentation equipment failureFermentation | Equipment failure (breakdowns) | 1.0% [0.2–3.3%] | 0.6% [0.1–1.9%] | D | 29 / 33 |
| Separator rotor shaft failureSeparation (centrifugation, filtration, membranes) | Equipment failure (breakdowns) | 1.0% [0.2–3.2%] | 0.6% [0.1–1.9%] | D | 37 / 44 |
| Blow Molding Container DefectsForming, moulding and depositing | Process defects (scrap and rework) | 1.0% [0.2–2.7%] | 0.5% [0.1–1.3%] | C | 76 / 96 |
| Packaging Equipment Setup and AdjustmentPackaging (forming, sealing, wrapping, case packing, palletizing) | Setup and adjustments | 1.0% [0.3–2.5%] | 0.6% [0.1–1.4%] | C | 112 / 155 |
| Ripple plate component failure (separator)Separation (centrifugation, filtration, membranes) | Equipment failure (breakdowns) | 1.0% [0.2–3.1%] | 0.6% [0.1–1.8%] | D | 37 / 44 |
| Tumbler shaft/body breakageMixing and blending | Equipment failure (breakdowns) | 1.0% [0.2–3.1%] | 0.6% [0.1–1.8%] | D | 31 / 40 |
| Plucking Machine Finger Wear, Misadjustment and FoulingSeparation (centrifugation, filtration, membranes) | Equipment failure (breakdowns) | 1.0% [0.2–3.1%] | 0.6% [0.1–1.8%] | D | 37 / 44 |
| Coagulation and fermentation process defectFermentation | Process defects (scrap and rework) | 1.0% [0.2–3.2%] | 0.5% [0.1–1.6%] | D | 29 / 33 |
| Lack of demand or input material shortageWhole line or unspecified equipment | organizational external | 1.0% [0.3–2.5%] | 0.6% [0.2–1.4%] | C | 127 / 161 |
| Organ rupture/damage during mechanical eviscerationSeparation (centrifugation, filtration, membranes) | Process defects (scrap and rework) | 1.0% [0.2–3.2%] | 0.5% [0.1–1.6%] | D | 37 / 44 |
| Mixer equipment failureMixing and blending | Equipment failure (breakdowns) | 1.0% [0.2–3.0%] | 0.6% [0.1–1.7%] | D | 31 / 40 |
| Ingredient dosing station failure or jamMixing and blending | Equipment failure (breakdowns) | 1.0% [0.2–3.1%] | 0.6% [0.1–1.8%] | D | 31 / 40 |
| Seaming Mandrel/Roller Wear and MisalignmentCapping and seaming | Equipment failure (breakdowns) | 1.0% [0.2–2.6%] | 0.6% [0.1–1.5%] | C | 82 / 109 |
| Unclassified Loss (Generic OEE Category Label Only)Conveying and accumulation | not classifiable | 1.0% [0.2–2.6%] | 0.6% [0.1–1.6%] | C | 86 / 112 |
| Dough Divider Jam or Mechanical FailureForming, moulding and depositing | Equipment failure (breakdowns) | 1.0% [0.2–2.6%] | 0.6% [0.1–1.6%] | C | 76 / 96 |
| Unspecified availability loss (OEE component, cause not detailed)Whole line or unspecified equipment | not classifiable | 1.0% [0.3–2.3%] | 0.5% [0.2–1.3%] | C | 127 / 161 |
| Washing/filling machine component failureContainer washing and rinsing | Equipment failure (breakdowns) | 1.0% [0.2–2.6%] | 0.6% [0.1–1.5%] | C | 80 / 102 |
| Roller arm/liner failureMilling and grinding | Equipment failure (breakdowns) | 1.0% [0.2–3.0%] | 0.6% [0.1–1.7%] | D | 43 / 48 |
| Workplace disorder / poor housekeepingWhole line or unspecified equipment | Idling and minor stops (micro-stops) | 1.0% [0.3–2.4%] | 0.5% [0.1–1.2%] | C | 127 / 161 |
| Unspecified production or food wasteWhole line or unspecified equipment | not classifiable | 1.0% [0.3–2.3%] | 0.5% [0.1–1.3%] | C | 127 / 161 |
| Mill center shaft drive failureMilling and grinding | Equipment failure (breakdowns) | 1.0% [0.2–2.9%] | 0.6% [0.1–1.7%] | D | 43 / 48 |
| Impurity/dirt carryover from first-press separationSeparation (centrifugation, filtration, membranes) | Process defects (scrap and rework) | 1.0% [0.2–3.0%] | 0.5% [0.1–1.4%] | D | 37 / 44 |
| Cleaning and sanitation downtimeWhole line or unspecified equipment | Setup and adjustments | 1.0% [0.3–2.3%] | 0.6% [0.1–1.4%] | C | 127 / 161 |
| Packaging line changeoverPackaging (forming, sealing, wrapping, case packing, palletizing) | Setup and adjustments | 1.0% [0.3–2.3%] | 0.5% [0.1–1.3%] | C | 112 / 155 |
| Electrical component failureMilling and grinding | Equipment failure (breakdowns) | 1.0% [0.2–2.9%] | 0.6% [0.1–1.6%] | D | 43 / 48 |
| Rework due to separation process deviationSeparation (centrifugation, filtration, membranes) | Process defects (scrap and rework) | 1.0% [0.2–3.0%] | 0.5% [0.1–1.4%] | D | 37 / 44 |
| Fibrizer deflector malfunctionMilling and grinding | Equipment failure (breakdowns) | 1.0% [0.2–2.9%] | 0.6% [0.1–1.7%] | D | 43 / 48 |
| Transfer and material handling delayWhole line or unspecified equipment | Idling and minor stops (micro-stops) | 0.9% [0.2–2.3%] | 0.5% [0.1–1.2%] | C | 127 / 161 |
| Grain pre-cleaning equipment failureMilling and grinding | Equipment failure (breakdowns) | 0.9% [0.2–2.9%] | 0.5% [0.1–1.7%] | D | 43 / 48 |
| Weight/yield loss during pulpingSeparation (centrifugation, filtration, membranes) | Process defects (scrap and rework) | 0.9% [0.1–2.8%] | 0.5% [0.1–1.4%] | D | 37 / 44 |
| Abdomen cut depth/position deviationCutting, slicing and deboning | Process defects (scrap and rework) | 0.9% [0.2–2.8%] | 0.5% [0.1–1.4%] | D | 39 / 48 |
| Cut piece dimension/weight out of customer specification limitsCutting, slicing and deboning | Process defects (scrap and rework) | 0.9% [0.2–2.9%] | 0.5% [0.1–1.4%] | D | 39 / 48 |
| Belt drive / transmission shaft failureMilling and grinding | Equipment failure (breakdowns) | 0.9% [0.2–2.7%] | 0.5% [0.1–1.6%] | D | 43 / 48 |
| Mechanical/structural breakdown maintenance (mill)Milling and grinding | Equipment failure (breakdowns) | 0.9% [0.2–2.7%] | 0.5% [0.1–1.5%] | D | 43 / 48 |
| Cane reception and preparation equipment failureMilling and grinding | Equipment failure (breakdowns) | 0.9% [0.2–2.7%] | 0.5% [0.1–1.6%] | D | 43 / 48 |
| Color deviation defectMixing and blending | Process defects (scrap and rework) | 0.9% [0.2–2.8%] | 0.4% [0.1–1.4%] | D | 31 / 40 |
| Improper container seal (cap/bag sealing defect)Capping and seaming | Process defects (scrap and rework) | 0.9% [0.2–2.5%] | 0.4% [0.1–1.2%] | C | 82 / 109 |
| Roller arm locker plate bolt failureMilling and grinding | Equipment failure (breakdowns) | 0.9% [0.2–2.6%] | 0.5% [0.1–1.5%] | D | 43 / 48 |
| Line Startup DelayWhole line or unspecified equipment | Setup and adjustments | 0.9% [0.3–2.2%] | 0.5% [0.1–1.3%] | C | 127 / 161 |
| Crown cap feed, strip and alignment malfunction at the crownerFilling | Equipment failure (breakdowns) | 0.9% [0.2–2.3%] | 0.5% [0.1–1.3%] | C | 120 / 162 |
| Minor stoppages on sterilizerSterilization (retort, UHT) | Idling and minor stops (micro-stops) | 0.9% [0.1–2.9%] | 0.5% [0.1–1.5%] | D | 34 / 37 |
| Poor housekeeping and workplace organizationMilling and grinding | organizational external | 0.9% [0.2–2.7%] | 0.5% [0.1–1.6%] | D | 43 / 48 |
| Over-trimmingCutting, slicing and deboning | Process defects (scrap and rework) | 0.9% [0.2–2.7%] | 0.4% [0.1–1.4%] | D | 39 / 48 |
| Rice polishing process defect (grain breakage/over-polishing)Milling and grinding | Process defects (scrap and rework) | 0.9% [0.2–2.7%] | 0.4% [0.1–1.3%] | D | 43 / 48 |
| Ripple mill nut cracking defect (whole/broken nut)Milling and grinding | Process defects (scrap and rework) | 0.9% [0.1–2.7%] | 0.4% [0.1–1.3%] | D | 43 / 48 |
| Milling yield loss from drying-induced grain fissuringMilling and grinding | Process defects (scrap and rework) | 0.9% [0.2–2.7%] | 0.4% [0.1–1.3%] | D | 43 / 48 |
| Inkjet printer failureLabeling and coding | Equipment failure (breakdowns) | 0.9% [0.2–2.3%] | 0.5% [0.1–1.3%] | C | 85 / 113 |
| Conveyor mechanical fault or jamConveying and accumulation | Equipment failure (breakdowns) | 0.9% [0.2–2.3%] | 0.5% [0.1–1.4%] | C | 86 / 112 |
| Husker roll clearance/speed mismatchMilling and grinding | Process defects (scrap and rework) | 0.9% [0.2–2.6%] | 0.4% [0.1–1.3%] | D | 43 / 48 |
| CIP (Clean-in-Place) cleaning cycleFilling | Setup and adjustments | 0.9% [0.2–2.2%] | 0.5% [0.1–1.2%] | C | 120 / 162 |
| Excess milling capacity (overcapacity)Milling and grinding | not classifiable | 0.9% [0.2–2.5%] | 0.5% [0.1–1.4%] | D | 43 / 48 |
| Off-Spec Particle Size from Hammer MillingMilling and grinding | Process defects (scrap and rework) | 0.9% [0.2–2.5%] | 0.4% [0.1–1.2%] | D | 43 / 48 |
| Fouled/dirty forming diesForming, moulding and depositing | Reduced speed | 0.9% [0.2–2.4%] | 0.6% [0.1–1.6%] | D | 76 / 96 |
| Filler dosing/valve fault causing overfillingFilling | Process defects (scrap and rework) | 0.9% [0.2–2.1%] | 0.4% [0.1–1.0%] | C | 120 / 162 |
| Waiting time due to line imbalance at cutting stationCutting, slicing and deboning | Idling and minor stops (micro-stops) | 0.9% [0.1–2.7%] | 0.5% [0.1–1.4%] | D | 39 / 48 |
| Product Loss in Transfer LinesWhole line or unspecified equipment | Start-up losses (reduced yield) | 0.9% [0.2–2.1%] | 0.4% [0.1–1.1%] | C | 127 / 161 |
| Changeover setup time (internal and external activities)Separation (centrifugation, filtration, membranes) | Setup and adjustments | 0.8% [0.1–2.6%] | 0.5% [0.1–1.5%] | D | 37 / 44 |
| Raw material verification and staging during changeoverMixing and blending | Setup and adjustments | 0.8% [0.1–2.5%] | 0.5% [0.1–1.5%] | D | 31 / 40 |
| Manual raw material weighing and transfer to mixing stageMixing and blending | Setup and adjustments | 0.8% [0.1–2.7%] | 0.5% [0.1–1.5%] | D | 31 / 40 |
| Machine start-up and shutdown procedure timeMixing and blending | Setup and adjustments | 0.8% [0.1–2.7%] | 0.5% [0.1–1.5%] | D | 31 / 40 |
| Laser Marking Machine Speed LossLabeling and coding | Reduced speed | 0.8% [0.2–2.3%] | 0.5% [0.1–1.5%] | D | 85 / 113 |
| Waiting for raw material supplyExtrusion | organizational external | 0.8% [0.1–2.4%] | 0.5% [0.1–1.4%] | D | 59 / 72 |
| Press changeover for format/product changeSeparation (centrifugation, filtration, membranes) | Setup and adjustments | 0.8% [0.1–2.6%] | 0.5% [0.1–1.5%] | D | 37 / 44 |
| Packing line starvation/blocking due to upstream or downstream imbalancePackaging (forming, sealing, wrapping, case packing, palletizing) | organizational external | 0.8% [0.2–2.0%] | 0.5% [0.1–1.1%] | C | 112 / 155 |
| Manual Pallet Transport Delay to Machine FloorMixing and blending | Setup and adjustments | 0.8% [0.1–2.5%] | 0.5% [0.1–1.4%] | D | 31 / 40 |
| Bag breaker cleaning changeoverMixing and blending | Setup and adjustments | 0.8% [0.1–2.6%] | 0.5% [0.1–1.5%] | D | 31 / 40 |
| Oven component wear and corrosion (tray, firebox, ignition system)Baking | Equipment failure (breakdowns) | 0.8% [0.2–2.4%] | 0.5% [0.1–1.4%] | D | 60 / 73 |
| Non-value-added time within washing cycleContainer washing and rinsing | Reduced speed | 0.8% [0.2–2.2%] | 0.5% [0.1–1.4%] | D | 80 / 102 |
| Oven equipment failureBaking | Equipment failure (breakdowns) | 0.8% [0.1–2.3%] | 0.5% [0.1–1.3%] | D | 60 / 73 |
| Pump failureWhole line or unspecified equipment | Equipment failure (breakdowns) | 0.8% [0.2–2.0%] | 0.5% [0.1–1.2%] | C | 127 / 161 |
| Heat seal defect (detached, wrinkled or folded seal)Packaging (forming, sealing, wrapping, case packing, palletizing) | Process defects (scrap and rework) | 0.8% [0.2–2.1%] | 0.4% [0.1–1.0%] | C | 112 / 155 |
| Unfilled pouch (empty pouch defect)Packaging (forming, sealing, wrapping, case packing, palletizing) | Process defects (scrap and rework) | 0.8% [0.2–2.0%] | 0.4% [0.1–1.0%] | C | 112 / 155 |
| Deflector position adjustmentMilling and grinding | Setup and adjustments | 0.8% [0.1–2.3%] | 0.4% [0.1–1.3%] | D | 43 / 48 |
| Unwanted crystallization in cooked productCooking and frying | Process defects (scrap and rework) | 0.8% [0.1–2.3%] | 0.4% [0.1–1.1%] | D | 57 / 69 |
| Ingredient weighing station fault or delayWhole line or unspecified equipment | Equipment failure (breakdowns) | 0.8% [0.2–2.0%] | 0.4% [0.1–1.1%] | C | 127 / 161 |
| Equipment down under repairWhole line or unspecified equipment | Equipment failure (breakdowns) | 0.8% [0.2–2.0%] | 0.4% [0.1–1.1%] | C | 127 / 161 |
| Automation and instrumentation failureWhole line or unspecified equipment | Equipment failure (breakdowns) | 0.8% [0.2–2.0%] | 0.4% [0.1–1.1%] | C | 127 / 161 |
| Filler inlet guide jam/failureFilling | Equipment failure (breakdowns) | 0.8% [0.2–1.9%] | 0.4% [0.1–1.1%] | C | 120 / 162 |
| Stoppage due to spare parts shortageWhole line or unspecified equipment | organizational external | 0.8% [0.2–1.9%] | 0.4% [0.1–1.1%] | C | 127 / 161 |
| Boiler breakdownUtilities (steam, compressed air, chilled water, power) | Equipment failure (breakdowns) | 0.8% [0.2–1.9%] | 0.4% [0.1–1.1%] | C | 131 / 165 |
| Delay in upstream supply or support processWhole line or unspecified equipment | organizational external | 0.8% [0.2–1.9%] | 0.4% [0.1–1.1%] | C | 127 / 161 |
| Electrical fault in filling/weighing equipmentFilling | Equipment failure (breakdowns) | 0.8% [0.2–1.8%] | 0.4% [0.1–1.1%] | C | 120 / 162 |
| Packaging/filling seal and handling mechanism faultPackaging (forming, sealing, wrapping, case packing, palletizing) | Idling and minor stops (micro-stops) | 0.8% [0.2–2.0%] | 0.4% [0.1–1.1%] | C | 112 / 155 |
| Depanning Product DamageBaking | Process defects (scrap and rework) | 0.8% [0.1–2.2%] | 0.4% [0.1–1.1%] | D | 60 / 73 |
| Oven Temperature InstabilityBaking | Process defects (scrap and rework) | 0.8% [0.1–2.2%] | 0.4% [0.1–1.1%] | D | 60 / 73 |
| Scheduled preventive maintenanceWhole line or unspecified equipment | planned downtime | 0.8% [0.2–1.9%] | 0.4% [0.1–1.1%] | C | 127 / 161 |
| Planned schedule shutdownWhole line or unspecified equipment | planned downtime | 0.8% [0.2–1.9%] | 0.4% [0.1–1.1%] | C | 127 / 161 |
| Film handling and wrapping system failurePackaging (forming, sealing, wrapping, case packing, palletizing) | Equipment failure (breakdowns) | 0.8% [0.2–1.9%] | 0.4% [0.1–1.1%] | C | 112 / 155 |
| Tray-forming clamp/finger mechanism faultPackaging (forming, sealing, wrapping, case packing, palletizing) | Equipment failure (breakdowns) | 0.7% [0.2–1.9%] | 0.4% [0.1–1.1%] | C | 112 / 155 |
| Fill content or contamination defectFilling | Process defects (scrap and rework) | 0.7% [0.2–2.0%] | 0.4% [0.1–1.0%] | C | 120 / 162 |
| Infeed screw/worm malfunction or jamFilling | Equipment failure (breakdowns) | 0.7% [0.2–2.0%] | 0.4% [0.1–1.1%] | C | 120 / 162 |
| Product pusher bushing wear/failureForming, moulding and depositing | Equipment failure (breakdowns) | 0.7% [0.1–2.0%] | 0.4% [0.1–1.2%] | D | 76 / 96 |
| Workforce / staffing shortageWhole line or unspecified equipment | organizational external | 0.7% [0.2–1.8%] | 0.4% [0.1–1.0%] | C | 127 / 161 |
| Organizational Stoppage (Personnel or Material Shortage)Whole line or unspecified equipment | organizational external | 0.7% [0.2–1.8%] | 0.4% [0.1–1.0%] | C | 127 / 161 |
| Pellet mill mechanical failureForming, moulding and depositing | Equipment failure (breakdowns) | 0.7% [0.1–2.1%] | 0.4% [0.1–1.3%] | D | 76 / 96 |
| Extruder setup and adjustmentExtrusion | Setup and adjustments | 0.7% [0.1–2.3%] | 0.4% [0.1–1.3%] | D | 59 / 72 |
| Container cracking and contaminationWhole line or unspecified equipment | Process defects (scrap and rework) | 0.7% [0.2–1.8%] | 0.3% [0.1–0.9%] | C | 127 / 161 |
| Gripper/clamp breakageForming, moulding and depositing | Equipment failure (breakdowns) | 0.7% [0.1–2.1%] | 0.4% [0.1–1.2%] | D | 76 / 96 |
| Milling capacity underutilization (excess mill capacity vs. feed rate)Milling and grinding | Reduced speed | 0.7% [0.1–2.4%] | 0.5% [0.1–1.5%] | D | 43 / 48 |
| Aseptic carton filler subsystem failureFilling | Equipment failure (breakdowns) | 0.7% [0.2–1.8%] | 0.4% [0.1–1.0%] | C | 120 / 162 |
| Power supply disruptionWhole line or unspecified equipment | organizational external | 0.7% [0.2–1.9%] | 0.4% [0.1–1.1%] | C | 127 / 161 |
| Mold Safety Cam/Closure Mechanism FaultForming, moulding and depositing | Equipment failure (breakdowns) | 0.7% [0.1–2.1%] | 0.4% [0.1–1.2%] | D | 76 / 96 |
| Filler discharge jam or backupFilling | Equipment failure (breakdowns) | 0.7% [0.2–1.9%] | 0.4% [0.1–1.1%] | C | 120 / 162 |
| Filling valve malfunctionFilling | Equipment failure (breakdowns) | 0.7% [0.2–1.8%] | 0.4% [0.1–1.0%] | C | 120 / 162 |
| Bottle washer drive/gearbox failureContainer washing and rinsing | Equipment failure (breakdowns) | 0.7% [0.1–2.0%] | 0.4% [0.1–1.1%] | D | 80 / 102 |
| Changeover retooling on fillerFilling | Setup and adjustments | 0.7% [0.2–1.9%] | 0.4% [0.1–1.1%] | C | 120 / 162 |
| Compressed air leakForming, moulding and depositing | Equipment failure (breakdowns) | 0.7% [0.1–1.9%] | 0.4% [0.1–1.1%] | D | 76 / 96 |
| Deficient corrective maintenance managementCapping and seaming | Equipment failure (breakdowns) | 0.7% [0.1–2.0%] | 0.4% [0.1–1.2%] | D | 82 / 109 |
| Defective containers and closures (warped bottles, cap defects)Whole line or unspecified equipment | Process defects (scrap and rework) | 0.7% [0.2–1.8%] | 0.3% [0.1–0.9%] | C | 127 / 161 |
| Bottle inspection machine failureInspection and checkweighing | Equipment failure (breakdowns) | 0.7% [0.1–1.9%] | 0.4% [0.1–1.1%] | D | 79 / 101 |
| Micro-stoppages with reduced running speedWhole line or unspecified equipment | Idling and minor stops (micro-stops) | 0.7% [0.2–1.8%] | 0.4% [0.1–1.0%] | C | 127 / 161 |
| Out-of-spec pellets requiring reprocessingForming, moulding and depositing | Process defects (scrap and rework) | 0.7% [0.1–2.1%] | 0.3% [0.1–1.0%] | D | 76 / 96 |
| Underfill / short fill volumeForming, moulding and depositing | Process defects (scrap and rework) | 0.7% [0.1–2.1%] | 0.3% [0.1–1.0%] | D | 76 / 96 |
| Imprinter Equipment FailureForming, moulding and depositing | Equipment failure (breakdowns) | 0.7% [0.1–2.0%] | 0.4% [0.1–1.2%] | D | 76 / 96 |
| Changeover setup delay (baking)Baking | Setup and adjustments | 0.7% [0.1–2.1%] | 0.4% [0.1–1.2%] | D | 60 / 73 |
| Transfer carriage failure at tippler stationConveying and accumulation | Equipment failure (breakdowns) | 0.7% [0.1–1.9%] | 0.4% [0.1–1.1%] | D | 86 / 112 |
| Changeover disassembly, cleaning and reassembly of machine partsWhole line or unspecified equipment | Setup and adjustments | 0.7% [0.2–1.8%] | 0.4% [0.1–1.0%] | C | 127 / 161 |
| Conveyor line breakdown stoppageConveying and accumulation | Equipment failure (breakdowns) | 0.7% [0.1–1.9%] | 0.4% [0.1–1.1%] | D | 86 / 112 |
| Oven changeover and warm-up downtimeBaking | Setup and adjustments | 0.7% [0.1–2.1%] | 0.4% [0.1–1.2%] | D | 60 / 73 |
| Equipment calibration/adjustment errorWhole line or unspecified equipment | Setup and adjustments | 0.7% [0.2–1.7%] | 0.4% [0.1–1.0%] | C | 127 / 161 |
| Depalletizer/Unpacker Equipment FailureConveying and accumulation | Equipment failure (breakdowns) | 0.7% [0.1–1.9%] | 0.4% [0.1–1.1%] | D | 86 / 112 |
| Expedition feed conveyor failureConveying and accumulation | Equipment failure (breakdowns) | 0.7% [0.1–2.0%] | 0.4% [0.1–1.1%] | D | 86 / 112 |
| Palletizer minor stoppage (misalignment, jam or blockage)Packaging (forming, sealing, wrapping, case packing, palletizing) | Idling and minor stops (micro-stops) | 0.7% [0.2–1.8%] | 0.4% [0.1–1.0%] | C | 112 / 155 |
| Operator-limited line speedPackaging (forming, sealing, wrapping, case packing, palletizing) | Reduced speed | 0.7% [0.1–1.8%] | 0.4% [0.1–1.2%] | D | 112 / 155 |
| Product leakage/spillage from bulk material conveying equipmentConveying and accumulation | Equipment failure (breakdowns) | 0.7% [0.1–1.9%] | 0.4% [0.1–1.1%] | D | 86 / 112 |
| Packer guide rail adjustmentPackaging (forming, sealing, wrapping, case packing, palletizing) | Setup and adjustments | 0.7% [0.2–1.8%] | 0.4% [0.1–1.0%] | C | 112 / 155 |
| Discharge washer mechanical/electrical failureContainer washing and rinsing | Equipment failure (breakdowns) | 0.7% [0.1–2.0%] | 0.4% [0.1–1.2%] | D | 80 / 102 |
| Capping head mechanical failureCapping and seaming | Equipment failure (breakdowns) | 0.7% [0.1–1.9%] | 0.4% [0.1–1.1%] | D | 82 / 109 |
| Overnight production suspensionForming, moulding and depositing | organizational external | 0.7% [0.1–1.9%] | 0.4% [0.1–1.1%] | D | 76 / 96 |
| Discharge conveyor failureConveying and accumulation | Equipment failure (breakdowns) | 0.7% [0.1–1.9%] | 0.4% [0.1–1.1%] | D | 86 / 112 |
| Helical screw conveyor failureConveying and accumulation | Equipment failure (breakdowns) | 0.7% [0.1–1.8%] | 0.4% [0.1–1.1%] | D | 86 / 112 |
| In-process quality check (Brix, acidity, pH, appearance)Inspection and checkweighing | not classifiable | 0.7% [0.1–1.9%] | 0.4% [0.1–1.1%] | D | 79 / 101 |
| Station cycle time constraintWhole line or unspecified equipment | Reduced speed | 0.7% [0.1–1.8%] | 0.4% [0.1–1.2%] | D | 127 / 161 |
| Transportation time between stationsConveying and accumulation | not classifiable | 0.7% [0.1–1.9%] | 0.4% [0.1–1.2%] | D | 86 / 112 |
| Boiler performance degradationUtilities (steam, compressed air, chilled water, power) | Reduced speed | 0.7% [0.1–1.8%] | 0.4% [0.1–1.1%] | D | 131 / 165 |
| Missing or defective cap/seal on containerCapping and seaming | Process defects (scrap and rework) | 0.7% [0.1–1.9%] | 0.3% [0.1–0.9%] | D | 82 / 109 |
| Conveyor drive motor burnout or mechanical failureConveying and accumulation | Equipment failure (breakdowns) | 0.7% [0.1–1.8%] | 0.4% [0.1–1.1%] | D | 86 / 112 |
| Metal conveyor chain/track failureConveying and accumulation | Equipment failure (breakdowns) | 0.7% [0.1–1.8%] | 0.4% [0.1–1.0%] | D | 86 / 112 |
| Bottle ejection jam at blow moldForming, moulding and depositing | Idling and minor stops (micro-stops) | 0.7% [0.1–2.0%] | 0.4% [0.1–1.1%] | D | 76 / 96 |
| Incorrect label applicationLabeling and coding | Process defects (scrap and rework) | 0.7% [0.1–1.9%] | 0.3% [0.1–0.9%] | D | 85 / 113 |
| Line imbalance stop (starvation/blocking)Forming, moulding and depositing | Idling and minor stops (micro-stops) | 0.6% [0.1–1.8%] | 0.3% [0.1–1.0%] | D | 76 / 96 |
| Parasitic machine speed lossesWhole line or unspecified equipment | Reduced speed | 0.6% [0.1–1.7%] | 0.4% [0.1–1.1%] | D | 127 / 161 |
| Incorrect or Illegible Product CodingLabeling and coding | Process defects (scrap and rework) | 0.6% [0.1–1.7%] | 0.3% [0.1–0.9%] | D | 85 / 113 |
| Valve FailureForming, moulding and depositing | Setup and adjustments | 0.6% [0.1–1.8%] | 0.3% [0.1–1.0%] | D | 76 / 96 |
| Container guide rail tilting/misalignment failureSterilization (retort, UHT) | Equipment failure (breakdowns) | 0.6% [0.1–2.1%] | 0.3% [0.0–1.2%] | D | 34 / 37 |
| Capping/sealing mechanism readjustmentCapping and seaming | Setup and adjustments | 0.6% [0.1–1.8%] | 0.3% [0.1–1.0%] | D | 82 / 109 |
| Scheduled preventive maintenance of sealing machineCapping and seaming | Setup and adjustments | 0.6% [0.1–1.7%] | 0.4% [0.1–1.0%] | D | 82 / 109 |
| Thresher mechanical/electrical failureSeparation (centrifugation, filtration, membranes) | Equipment failure (breakdowns) | 0.6% [0.1–2.0%] | 0.3% [0.0–1.1%] | D | 37 / 44 |
| Wrapping machine component failurePackaging (forming, sealing, wrapping, case packing, palletizing) | Equipment failure (breakdowns) | 0.6% [0.1–1.6%] | 0.3% [0.1–0.9%] | D | 112 / 155 |
| Capping/seaming line changeoverCapping and seaming | Setup and adjustments | 0.6% [0.1–1.7%] | 0.3% [0.1–1.0%] | D | 82 / 109 |
| Unplanned corrective maintenance stopPackaging (forming, sealing, wrapping, case packing, palletizing) | Equipment failure (breakdowns) | 0.6% [0.1–1.6%] | 0.3% [0.1–1.0%] | D | 112 / 155 |
| Timing belt misalignment or failurePackaging (forming, sealing, wrapping, case packing, palletizing) | Equipment failure (breakdowns) | 0.6% [0.1–1.6%] | 0.3% [0.1–0.9%] | D | 112 / 155 |
| Reverse osmosis system mechanical failureSeparation (centrifugation, filtration, membranes) | Equipment failure (breakdowns) | 0.6% [0.1–2.0%] | 0.3% [0.1–1.1%] | D | 37 / 44 |
| Control panel failureFilling | Equipment failure (breakdowns) | 0.6% [0.1–1.7%] | 0.3% [0.1–1.0%] | D | 120 / 162 |
| Conveyor cleaning during changeoverConveying and accumulation | Setup and adjustments | 0.6% [0.1–1.7%] | 0.3% [0.1–1.0%] | D | 86 / 112 |
| Inverter/VFD fault or failureMilling and grinding | Equipment failure (breakdowns) | 0.6% [0.1–1.9%] | 0.3% [0.1–1.1%] | D | 43 / 48 |
| Overheating-induced failure of sealing control components (scale, RCU, thermocouple)Packaging (forming, sealing, wrapping, case packing, palletizing) | Equipment failure (breakdowns) | 0.6% [0.1–1.6%] | 0.3% [0.1–0.9%] | D | 112 / 155 |
| Juice treatment equipment failureMilling and grinding | Equipment failure (breakdowns) | 0.6% [0.1–1.9%] | 0.3% [0.0–1.1%] | D | 43 / 48 |
| Mill motor short circuitMilling and grinding | Equipment failure (breakdowns) | 0.6% [0.1–1.9%] | 0.3% [0.0–1.1%] | D | 43 / 48 |
| Perforation blade wear, breakage or foulingPackaging (forming, sealing, wrapping, case packing, palletizing) | Equipment failure (breakdowns) | 0.6% [0.1–1.5%] | 0.3% [0.1–0.9%] | D | 112 / 155 |
| Fastener or bolt breakageFilling | Equipment failure (breakdowns) | 0.6% [0.1–1.6%] | 0.3% [0.1–0.9%] | D | 120 / 162 |
| Star wheel and guide adjustment during format changeoverLabeling and coding | Setup and adjustments | 0.6% [0.1–1.6%] | 0.3% [0.1–1.0%] | D | 85 / 113 |
| Planned downtime (scheduled stop)Filling | planned downtime | 0.6% [0.1–1.6%] | 0.3% [0.1–0.9%] | D | 120 / 162 |
| Feed system failureMilling and grinding | Equipment failure (breakdowns) | 0.6% [0.1–1.8%] | 0.3% [0.0–1.1%] | D | 43 / 48 |
| Filler timing worm/synchronization faultFilling | Equipment failure (breakdowns) | 0.6% [0.1–1.6%] | 0.3% [0.1–0.9%] | D | 120 / 162 |
| Filling nozzle component failureFilling | Equipment failure (breakdowns) | 0.6% [0.1–1.6%] | 0.3% [0.1–0.9%] | D | 120 / 162 |
| Scheduled short breaksFilling | planned downtime | 0.6% [0.1–1.5%] | 0.3% [0.1–0.9%] | D | 120 / 162 |
| Raw material supply interruption causing filler readjustmentFilling | organizational external | 0.6% [0.1–1.6%] | 0.3% [0.1–0.9%] | D | 120 / 162 |
| Preparation of tools and PPE before changeoverLabeling and coding | Setup and adjustments | 0.6% [0.1–1.6%] | 0.3% [0.1–0.9%] | D | 85 / 113 |
| Case packer / cartoner equipment failurePackaging (forming, sealing, wrapping, case packing, palletizing) | Equipment failure (breakdowns) | 0.6% [0.1–1.5%] | 0.3% [0.1–0.9%] | D | 112 / 155 |
| Conveyor belt system failurePackaging (forming, sealing, wrapping, case packing, palletizing) | Equipment failure (breakdowns) | 0.6% [0.1–1.6%] | 0.3% [0.1–0.9%] | D | 112 / 155 |
| Bagasse Handling Equipment FailureMilling and grinding | Equipment failure (breakdowns) | 0.6% [0.1–1.8%] | 0.3% [0.0–1.1%] | D | 43 / 48 |
| Film cutter/sealer blade failurePackaging (forming, sealing, wrapping, case packing, palletizing) | Equipment failure (breakdowns) | 0.6% [0.1–1.6%] | 0.3% [0.1–1.0%] | D | 112 / 155 |
| Mill scraper breakageMilling and grinding | Equipment failure (breakdowns) | 0.6% [0.1–1.8%] | 0.3% [0.0–1.0%] | D | 43 / 48 |
| Drive/inverter cooling fan failureMilling and grinding | Equipment failure (breakdowns) | 0.6% [0.1–1.8%] | 0.3% [0.0–1.0%] | D | 43 / 48 |
| Tray Corner Ear Flare DefectPackaging (forming, sealing, wrapping, case packing, palletizing) | Equipment failure (breakdowns) | 0.6% [0.1–1.6%] | 0.3% [0.1–0.9%] | D | 112 / 155 |
| Dosing/lobe pump jamming failureFilling | Equipment failure (breakdowns) | 0.6% [0.1–1.6%] | 0.3% [0.1–0.9%] | D | 120 / 162 |
| Conveyor belt and guide rail adjustmentLabeling and coding | Setup and adjustments | 0.6% [0.1–1.7%] | 0.3% [0.1–1.0%] | D | 85 / 113 |
| Dosing hose cloggingFilling | Equipment failure (breakdowns) | 0.6% [0.1–1.5%] | 0.3% [0.1–0.9%] | D | 120 / 162 |
| Operator execution error during packaging operationPackaging (forming, sealing, wrapping, case packing, palletizing) | not classifiable | 0.6% [0.1–1.6%] | 0.3% [0.1–0.9%] | D | 112 / 155 |
| Operator unavailability due to labor shortage or scheduled breaksPackaging (forming, sealing, wrapping, case packing, palletizing) | organizational external | 0.6% [0.1–1.6%] | 0.3% [0.1–0.9%] | D | 112 / 155 |
| Utility supply outage or disruptionMilling and grinding | organizational external | 0.6% [0.1–1.8%] | 0.3% [0.0–1.0%] | D | 43 / 48 |
| Changeover parts placementLabeling and coding | Setup and adjustments | 0.6% [0.1–1.7%] | 0.3% [0.1–1.0%] | D | 85 / 113 |
| Wrap/pack quality defect requiring reworkPackaging (forming, sealing, wrapping, case packing, palletizing) | Process defects (scrap and rework) | 0.6% [0.1–1.5%] | 0.3% [0.1–0.8%] | D | 112 / 155 |
| Storage silo equipment failure (bulk raw material)Whole line or unspecified equipment | Equipment failure (breakdowns) | 0.6% [0.1–1.6%] | 0.3% [0.1–0.9%] | D | 127 / 161 |
| Glue roller and scraper adjustmentLabeling and coding | Setup and adjustments | 0.6% [0.1–1.7%] | 0.3% [0.1–0.9%] | D | 85 / 113 |
| Drive motor overload failure (high current draw)Milling and grinding | Equipment failure (breakdowns) | 0.6% [0.1–1.8%] | 0.3% [0.0–1.1%] | D | 43 / 48 |
| Label magazine cleaningLabeling and coding | Setup and adjustments | 0.6% [0.1–1.7%] | 0.3% [0.1–0.9%] | D | 85 / 113 |
| Aluminum foil tearingPackaging (forming, sealing, wrapping, case packing, palletizing) | Process defects (scrap and rework) | 0.6% [0.1–1.6%] | 0.3% [0.1–0.8%] | D | 112 / 155 |
| Carton Erector Equipment FailurePackaging (forming, sealing, wrapping, case packing, palletizing) | Equipment failure (breakdowns) | 0.6% [0.1–1.5%] | 0.3% [0.1–0.9%] | D | 112 / 155 |
| Air compressor failureUtilities (steam, compressed air, chilled water, power) | Equipment failure (breakdowns) | 0.6% [0.1–1.6%] | 0.3% [0.1–0.9%] | D | 131 / 165 |
| Raw material receiving equipment failureWhole line or unspecified equipment | Equipment failure (breakdowns) | 0.6% [0.1–1.5%] | 0.3% [0.1–0.9%] | D | 127 / 161 |
| Product loss from bulk material handling equipment failureWhole line or unspecified equipment | Equipment failure (breakdowns) | 0.6% [0.1–1.6%] | 0.3% [0.1–0.9%] | D | 127 / 161 |
| Centering disc replacement (format changeover)Labeling and coding | Setup and adjustments | 0.6% [0.1–1.6%] | 0.3% [0.1–0.9%] | D | 85 / 113 |
| Package fill weight deviation (variation/overfilling)Packaging (forming, sealing, wrapping, case packing, palletizing) | Process defects (scrap and rework) | 0.6% [0.1–1.6%] | 0.3% [0.1–0.8%] | D | 112 / 155 |
| Steam/Power Generation Utility FailureUtilities (steam, compressed air, chilled water, power) | Equipment failure (breakdowns) | 0.6% [0.1–1.5%] | 0.3% [0.1–0.9%] | D | 131 / 165 |
| Packaging machine seal defects from component wearPackaging (forming, sealing, wrapping, case packing, palletizing) | Process defects (scrap and rework) | 0.6% [0.1–1.5%] | 0.3% [0.1–0.7%] | D | 112 / 155 |
| Mechanical component failureWhole line or unspecified equipment | Equipment failure (breakdowns) | 0.6% [0.1–1.5%] | 0.3% [0.1–0.9%] | D | 127 / 161 |
| Manual non-value-added tasksPackaging (forming, sealing, wrapping, case packing, palletizing) | not classifiable | 0.6% [0.1–1.6%] | 0.3% [0.1–0.9%] | D | 112 / 155 |
| Selection/sorting error in separation processSeparation (centrifugation, filtration, membranes) | Process defects (scrap and rework) | 0.6% [0.1–1.8%] | 0.3% [0.0–0.9%] | D | 37 / 44 |
| Ingredient/Component Addition Equipment FailureWhole line or unspecified equipment | Equipment failure (breakdowns) | 0.6% [0.1–1.5%] | 0.3% [0.1–0.9%] | D | 127 / 161 |
| Unspecified palletizer lossesPackaging (forming, sealing, wrapping, case packing, palletizing) | not classifiable | 0.6% [0.1–1.6%] | 0.3% [0.1–0.9%] | D | 112 / 155 |
| Out-of-spec productPackaging (forming, sealing, wrapping, case packing, palletizing) | Process defects (scrap and rework) | 0.6% [0.1–1.5%] | 0.3% [0.1–0.8%] | D | 112 / 155 |
| Generic steam turbine performance loss (mixed causes)Utilities (steam, compressed air, chilled water, power) | Equipment failure (breakdowns) | 0.6% [0.1–1.5%] | 0.3% [0.1–0.9%] | D | 131 / 165 |
| Bag Fill Weight and Seal DefectsFilling | Process defects (scrap and rework) | 0.6% [0.1–1.6%] | 0.3% [0.1–0.8%] | D | 120 / 162 |
| Seed/foreign fragment contamination in pulpSeparation (centrifugation, filtration, membranes) | Process defects (scrap and rework) | 0.6% [0.1–1.9%] | 0.3% [0.0–0.9%] | D | 37 / 44 |
| Infeed timing (worm) screw changeover adjustmentLabeling and coding | Setup and adjustments | 0.6% [0.1–1.6%] | 0.3% [0.1–0.9%] | D | 85 / 113 |
| Scheduled cleaning, inspection and lubrication of the fillerFilling | planned downtime | 0.6% [0.1–1.5%] | 0.3% [0.1–0.9%] | D | 120 / 162 |
| Sealing system improperly adjustedCapping and seaming | Reduced speed | 0.6% [0.1–1.6%] | 0.4% [0.1–1.0%] | D | 82 / 109 |
| Container Body or Seal DefectFilling | Process defects (scrap and rework) | 0.6% [0.1–1.5%] | 0.3% [0.1–0.7%] | D | 120 / 162 |
| Weighing scale failure (electrical or mechanical)Filling | Equipment failure (breakdowns) | 0.6% [0.1–1.5%] | 0.3% [0.1–0.9%] | D | 120 / 162 |
| Operator procedural error during operationsWhole line or unspecified equipment | organizational external | 0.6% [0.1–1.5%] | 0.3% [0.1–0.8%] | D | 127 / 161 |
| Scheduled maintenance and cleaning stop (excluded from OEE)Whole line or unspecified equipment | planned downtime | 0.6% [0.1–1.5%] | 0.3% [0.1–0.9%] | D | 127 / 161 |
| Microbiological non-conformity of raw material during conditioningWhole line or unspecified equipment | Process defects (scrap and rework) | 0.6% [0.1–1.5%] | 0.3% [0.1–0.8%] | D | 127 / 161 |
| Vent tube bent or looseFilling | Equipment failure (breakdowns) | 0.6% [0.1–1.5%] | 0.3% [0.1–0.9%] | D | 120 / 162 |
| Raw material queuing/waiting delay (staging or weighing)Whole line or unspecified equipment | organizational external | 0.6% [0.1–1.4%] | 0.3% [0.1–0.9%] | D | 127 / 161 |
| Raw material backlog awaiting processingWhole line or unspecified equipment | organizational external | 0.5% [0.1–1.5%] | 0.3% [0.1–0.8%] | D | 127 / 161 |
| Reject/discard system adjustmentLabeling and coding | Setup and adjustments | 0.5% [0.1–1.5%] | 0.3% [0.1–0.9%] | D | 85 / 113 |
| Raw material staging congestion (frequent pallet relocation)Whole line or unspecified equipment | organizational external | 0.5% [0.1–1.4%] | 0.3% [0.1–0.8%] | D | 127 / 161 |
| Ingredient mixing errorMixing and blending | Process defects (scrap and rework) | 0.5% [0.1–1.8%] | 0.3% [0.0–0.8%] | D | 31 / 40 |
| Waiting for supervisor or maintenance instructionsWhole line or unspecified equipment | organizational external | 0.5% [0.1–1.5%] | 0.3% [0.1–0.9%] | D | 127 / 161 |
| Sensor fouling or malfunctionWhole line or unspecified equipment | Equipment failure (breakdowns) | 0.5% [0.1–1.5%] | 0.3% [0.1–0.9%] | D | 127 / 161 |
| Minor mechanical adjustment stop on fillerFilling | Equipment failure (breakdowns) | 0.5% [0.1–1.4%] | 0.3% [0.1–0.9%] | D | 120 / 162 |
| Inaccurate inventory recordsWhole line or unspecified equipment | organizational external | 0.5% [0.1–1.5%] | 0.3% [0.1–0.8%] | D | 127 / 161 |
| Unspecified process delayWhole line or unspecified equipment | not classifiable | 0.5% [0.1–1.4%] | 0.3% [0.1–0.9%] | D | 127 / 161 |
| Metal detector malfunctionFilling | Equipment failure (breakdowns) | 0.5% [0.1–1.5%] | 0.3% [0.1–0.9%] | D | 120 / 162 |
| Reduced speed and minor stoppages (unspecified)Whole line or unspecified equipment | not classifiable | 0.5% [0.1–1.5%] | 0.3% [0.1–0.8%] | D | 127 / 161 |
| Miscommunication between operatorsWhole line or unspecified equipment | organizational external | 0.5% [0.1–1.5%] | 0.3% [0.1–0.8%] | D | 127 / 161 |
| Inadequate Inventory Rotation (FIFO/FEFO Failure)Whole line or unspecified equipment | Process defects (scrap and rework) | 0.5% [0.1–1.5%] | 0.3% [0.1–0.7%] | D | 127 / 161 |
| Inefficient maintenance spare parts inventory managementWhole line or unspecified equipment | organizational external | 0.5% [0.1–1.5%] | 0.3% [0.1–0.8%] | D | 127 / 161 |
| CIP wash cycle stopCleaning in place (CIP) and sanitation | planned downtime | 0.5% [0.1–1.5%] | 0.3% [0.1–0.9%] | D | 129 / 163 |
| Raw material/ingredient transport shortageWhole line or unspecified equipment | organizational external | 0.5% [0.1–1.5%] | 0.3% [0.1–0.8%] | D | 127 / 161 |
| Planned maintenance stopWhole line or unspecified equipment | planned downtime | 0.5% [0.1–1.4%] | 0.3% [0.1–0.8%] | D | 127 / 161 |
| Insufficient operator trainingWhole line or unspecified equipment | organizational external | 0.5% [0.1–1.4%] | 0.3% [0.1–0.8%] | D | 127 / 161 |
| Improper machine speed settingWhole line or unspecified equipment | Process defects (scrap and rework) | 0.5% [0.1–1.5%] | 0.3% [0.1–0.7%] | D | 127 / 161 |
| Excessive polishing machine pressureWhole line or unspecified equipment | Process defects (scrap and rework) | 0.5% [0.1–1.4%] | 0.3% [0.1–0.7%] | D | 127 / 161 |
| Fibrizer deflector wear causing off-spec fiber reworkMilling and grinding | Process defects (scrap and rework) | 0.5% [0.1–1.7%] | 0.3% [0.0–0.8%] | D | 43 / 48 |
| Strapping machine malfunction / minor stoppagePackaging (forming, sealing, wrapping, case packing, palletizing) | Idling and minor stops (micro-stops) | 0.5% [0.1–1.5%] | 0.3% [0.0–0.8%] | D | 112 / 155 |
| Fallen Product Requiring CleanupPackaging (forming, sealing, wrapping, case packing, palletizing) | Idling and minor stops (micro-stops) | 0.5% [0.1–1.5%] | 0.3% [0.1–0.8%] | D | 112 / 155 |
| Operator-related inefficiencyWhole line or unspecified equipment | organizational external | 0.5% [0.1–1.5%] | 0.3% [0.1–0.8%] | D | 127 / 161 |
| Delayed eviscerationWhole line or unspecified equipment | Process defects (scrap and rework) | 0.5% [0.1–1.4%] | 0.3% [0.0–0.7%] | D | 127 / 161 |
| Pull/feed roller jamPackaging (forming, sealing, wrapping, case packing, palletizing) | Idling and minor stops (micro-stops) | 0.5% [0.1–1.5%] | 0.3% [0.1–0.8%] | D | 112 / 155 |
| Final Folder Jam/StoppagePackaging (forming, sealing, wrapping, case packing, palletizing) | Idling and minor stops (micro-stops) | 0.5% [0.1–1.5%] | 0.3% [0.1–0.8%] | D | 112 / 155 |
| Packaging line jam or blockagePackaging (forming, sealing, wrapping, case packing, palletizing) | Idling and minor stops (micro-stops) | 0.5% [0.1–1.5%] | 0.3% [0.1–0.8%] | D | 112 / 155 |
| Filling and closure defects (underfill, uncrowned, contamination)Filling | Process defects (scrap and rework) | 0.5% [0.1–1.5%] | 0.3% [0.1–0.7%] | D | 120 / 162 |
| Tool/material search time due to lack of visual workplace organizationWhole line or unspecified equipment | organizational external | 0.5% [0.1–1.4%] | 0.3% [0.1–0.8%] | D | 127 / 161 |
| Manual bottle pushing in pasteurizerPasteurization | Setup and adjustments | 0.5% [0.1–1.9%] | 0.3% [0.0–1.0%] | D | 26 / 29 |
| Proofer conveyor drive failureBaking | Equipment failure (breakdowns) | 0.5% [0.1–1.8%] | 0.3% [0.0–1.0%] | D | 60 / 73 |
| Labeling and cap/seal defectsWhole line or unspecified equipment | Process defects (scrap and rework) | 0.5% [0.1–1.4%] | 0.3% [0.0–0.7%] | D | 127 / 161 |
| Fill level and label adhesion nonconformanceWhole line or unspecified equipment | Process defects (scrap and rework) | 0.5% [0.1–1.4%] | 0.2% [0.0–0.7%] | D | 127 / 161 |
| WIP and packing material adjustmentPackaging (forming, sealing, wrapping, case packing, palletizing) | Setup and adjustments | 0.5% [0.1–1.4%] | 0.3% [0.1–0.8%] | D | 112 / 155 |
| Shift start/end line setupPackaging (forming, sealing, wrapping, case packing, palletizing) | Setup and adjustments | 0.5% [0.1–1.4%] | 0.3% [0.1–0.8%] | D | 112 / 155 |
| Component fouling from residue and degraded lubricantWhole line or unspecified equipment | Idling and minor stops (micro-stops) | 0.5% [0.1–1.4%] | 0.3% [0.1–0.7%] | D | 127 / 161 |
| Changeover material staging and organizationPackaging (forming, sealing, wrapping, case packing, palletizing) | Setup and adjustments | 0.5% [0.1–1.4%] | 0.3% [0.1–0.8%] | D | 112 / 155 |
| Equipment configuration/setup timeFermentation | Setup and adjustments | 0.5% [0.1–1.7%] | 0.3% [0.0–1.0%] | D | 29 / 33 |
| Waiting time for decanter draining between batchesSeparation (centrifugation, filtration, membranes) | Idling and minor stops (micro-stops) | 0.5% [0.1–1.7%] | 0.3% [0.0–0.9%] | D | 37 / 44 |
| Changeover adjustment of guide rails and air-blower positioningPackaging (forming, sealing, wrapping, case packing, palletizing) | Setup and adjustments | 0.5% [0.1–1.4%] | 0.3% [0.1–0.8%] | D | 112 / 155 |
| Toasting degree deviation (under/over-toasting)Cooking and frying | Process defects (scrap and rework) | 0.5% [0.1–1.6%] | 0.2% [0.0–0.8%] | D | 57 / 69 |
| Blender wall scrape-downMixing and blending | Idling and minor stops (micro-stops) | 0.5% [0.1–1.7%] | 0.3% [0.0–0.9%] | D | 31 / 40 |
| Cardboard cutout feeding module fine-tuning stoppagesPackaging (forming, sealing, wrapping, case packing, palletizing) | Setup and adjustments | 0.5% [0.1–1.4%] | 0.3% [0.1–0.8%] | D | 112 / 155 |
| Film and film-holding equipment changeoverPackaging (forming, sealing, wrapping, case packing, palletizing) | Setup and adjustments | 0.5% [0.1–1.4%] | 0.3% [0.1–0.8%] | D | 112 / 155 |
| Sanitation-in-place (SIP) cycle on fillerFilling | Idling and minor stops (micro-stops) | 0.5% [0.1–1.4%] | 0.3% [0.1–0.7%] | D | 120 / 162 |
| Changeover material staging/fetching delayFilling | Setup and adjustments | 0.5% [0.1–1.4%] | 0.3% [0.1–0.8%] | D | 120 / 162 |
| Die or tooling retrieval delay during changeoverFilling | Setup and adjustments | 0.5% [0.1–1.4%] | 0.3% [0.1–0.8%] | D | 120 / 162 |
| Metal detector or inkjet coder malfunctionWhole line or unspecified equipment | Idling and minor stops (micro-stops) | 0.5% [0.1–1.4%] | 0.3% [0.1–0.7%] | D | 127 / 161 |
| Container jam at bottle divider/lane splitterFilling | Idling and minor stops (micro-stops) | 0.5% [0.1–1.4%] | 0.3% [0.1–0.7%] | D | 120 / 162 |
| Deflector Blockage in Milling EquipmentMilling and grinding | Idling and minor stops (micro-stops) | 0.5% [0.1–1.6%] | 0.3% [0.0–0.8%] | D | 43 / 48 |
| Screw conveyor start-up/shutdown and cleaning sequence during changeoverSeparation (centrifugation, filtration, membranes) | Setup and adjustments | 0.5% [0.1–1.7%] | 0.3% [0.0–1.0%] | D | 37 / 44 |
| Fallen-bottle detection sensor adjustmentPackaging (forming, sealing, wrapping, case packing, palletizing) | Setup and adjustments | 0.5% [0.1–1.4%] | 0.3% [0.1–0.8%] | D | 112 / 155 |
| Stamp/cap jam on applicator trackFilling | Idling and minor stops (micro-stops) | 0.5% [0.1–1.4%] | 0.3% [0.1–0.7%] | D | 120 / 162 |
| Head Sensor AdjustmentWhole line or unspecified equipment | Setup and adjustments | 0.5% [0.1–1.3%] | 0.3% [0.1–0.8%] | D | 127 / 161 |
| Changeover retooling and team briefing downtimeWhole line or unspecified equipment | Setup and adjustments | 0.5% [0.1–1.4%] | 0.3% [0.1–0.8%] | D | 127 / 161 |
| Discontinuous upstream feeding (hopper/conveyor bottleneck)Milling and grinding | Idling and minor stops (micro-stops) | 0.5% [0.1–1.6%] | 0.3% [0.0–0.9%] | D | 43 / 48 |
| Waiting for supervisor confirmation/authorizationWhole line or unspecified equipment | Setup and adjustments | 0.5% [0.1–1.4%] | 0.3% [0.1–0.8%] | D | 127 / 161 |
| Manual transfer of product trays to cold storageWhole line or unspecified equipment | Setup and adjustments | 0.5% [0.1–1.3%] | 0.3% [0.1–0.7%] | D | 127 / 161 |
| Excessive ScaldingCooking and frying | Process defects (scrap and rework) | 0.5% [0.1–1.6%] | 0.2% [0.0–0.7%] | D | 57 / 69 |
| Motor overcurrent verification during changeover adjustmentWhole line or unspecified equipment | Setup and adjustments | 0.5% [0.1–1.4%] | 0.3% [0.1–0.8%] | D | 127 / 161 |
| Crusher jam from oversized foreign materialMilling and grinding | Idling and minor stops (micro-stops) | 0.5% [0.1–1.6%] | 0.3% [0.0–0.8%] | D | 43 / 48 |
| Changeover delay due to searching for and fetching tools/utensilsWhole line or unspecified equipment | Setup and adjustments | 0.5% [0.1–1.3%] | 0.3% [0.1–0.8%] | D | 127 / 161 |
| Packaging program change and parameter recalculationPackaging (forming, sealing, wrapping, case packing, palletizing) | Setup and adjustments | 0.5% [0.1–1.3%] | 0.3% [0.1–0.7%] | D | 112 / 155 |
| Process procedure deviationBaking | Process defects (scrap and rework) | 0.5% [0.1–1.5%] | 0.2% [0.0–0.7%] | D | 60 / 73 |
| Detergent/disinfectant solution preparationCleaning in place (CIP) and sanitation | Setup and adjustments | 0.5% [0.1–1.4%] | 0.3% [0.1–0.8%] | D | 129 / 163 |
| Pre-production resource staging and preparationSeparation (centrifugation, filtration, membranes) | Setup and adjustments | 0.5% [0.1–1.6%] | 0.3% [0.0–0.9%] | D | 37 / 44 |
| Cooker Steam Warm-up and ShutdownSeparation (centrifugation, filtration, membranes) | Setup and adjustments | 0.5% [0.1–1.6%] | 0.3% [0.0–0.9%] | D | 37 / 44 |
| Changeover documentation and paperwork delayFilling | Setup and adjustments | 0.5% [0.1–1.4%] | 0.3% [0.0–0.7%] | D | 120 / 162 |
| Mixed and undifferentiated filler losses (changeover, breakdown, stoppage, defects)Filling | Setup and adjustments | 0.5% [0.1–1.4%] | 0.3% [0.1–0.8%] | D | 120 / 162 |
| Product damage during restart after maintenancePackaging (forming, sealing, wrapping, case packing, palletizing) | Start-up losses (reduced yield) | 0.5% [0.1–1.4%] | 0.2% [0.0–0.7%] | D | 112 / 155 |
| Grinding liner replacement changeoverMilling and grinding | Setup and adjustments | 0.5% [0.1–1.5%] | 0.3% [0.0–0.9%] | D | 43 / 48 |
| Oven wheel malfunction (blow molding)Forming, moulding and depositing | Equipment failure (breakdowns) | 0.5% [0.1–1.4%] | 0.3% [0.0–0.8%] | D | 76 / 96 |
| Boiler startup warm-up yield lossUtilities (steam, compressed air, chilled water, power) | Start-up losses (reduced yield) | 0.5% [0.1–1.3%] | 0.2% [0.0–0.7%] | D | 131 / 165 |
| Treated water supply failureContainer washing and rinsing | Equipment failure (breakdowns) | 0.5% [0.1–1.4%] | 0.3% [0.0–0.8%] | D | 80 / 102 |
| Product loss at start-up/shut-down due to line designWhole line or unspecified equipment | Start-up losses (reduced yield) | 0.5% [0.1–1.3%] | 0.2% [0.0–0.7%] | D | 127 / 161 |
| Conveyor belt misalignment / tracking faultConveying and accumulation | Equipment failure (breakdowns) | 0.4% [0.1–1.4%] | 0.3% [0.0–0.8%] | D | 86 / 112 |
| Out-of-specification parts from press formingForming, moulding and depositing | Process defects (scrap and rework) | 0.4% [0.1–1.4%] | 0.2% [0.0–0.7%] | D | 76 / 96 |
| Label applicator jam or misfeedLabeling and coding | Equipment failure (breakdowns) | 0.4% [0.1–1.4%] | 0.3% [0.0–0.8%] | D | 85 / 113 |
| Conveyor roller fouling from dirt buildupConveying and accumulation | Equipment failure (breakdowns) | 0.4% [0.1–1.4%] | 0.3% [0.0–0.8%] | D | 86 / 112 |
| Dosing inaccuracy in forming/pelletizingForming, moulding and depositing | Process defects (scrap and rework) | 0.4% [0.1–1.4%] | 0.2% [0.0–0.6%] | D | 76 / 96 |
| Raw material staging and setup for cookingCooking and frying | Setup and adjustments | 0.4% [0.1–1.5%] | 0.3% [0.0–0.8%] | D | 57 / 69 |
| Rotary conveyor dry-run failureConveying and accumulation | Equipment failure (breakdowns) | 0.4% [0.1–1.3%] | 0.3% [0.0–0.7%] | D | 86 / 112 |
| Cooking equipment start-up and warm-upCooking and frying | Setup and adjustments | 0.4% [0.1–1.4%] | 0.2% [0.0–0.8%] | D | 57 / 69 |
| Tool/mould preparation during changeoverBaking | Setup and adjustments | 0.4% [0.1–1.4%] | 0.2% [0.0–0.8%] | D | 60 / 73 |
| Storage/staging delay during changeoverBaking | Setup and adjustments | 0.4% [0.1–1.4%] | 0.2% [0.0–0.8%] | D | 60 / 73 |
| Quality control rejection at inspection stageInspection and checkweighing | Process defects (scrap and rework) | 0.4% [0.1–1.3%] | 0.2% [0.0–0.6%] | D | 79 / 101 |
| Conveyor chain link repairBaking | Setup and adjustments | 0.4% [0.1–1.4%] | 0.2% [0.0–0.8%] | D | 60 / 73 |
| Transport/conveying system changeover adjustmentBaking | Setup and adjustments | 0.4% [0.1–1.3%] | 0.2% [0.0–0.7%] | D | 60 / 73 |
| Label too short / undersized labelLabeling and coding | Process defects (scrap and rework) | 0.4% [0.1–1.3%] | 0.2% [0.0–0.6%] | D | 85 / 113 |
| Gauge roller jam or material buildupForming, moulding and depositing | Idling and minor stops (micro-stops) | 0.4% [0.1–1.3%] | 0.2% [0.0–0.7%] | D | 76 / 96 |
| Missing product code/date stampLabeling and coding | Process defects (scrap and rework) | 0.4% [0.1–1.3%] | 0.2% [0.0–0.6%] | D | 85 / 113 |
| Start-of-production warm-up and adjustmentForming, moulding and depositing | Setup and adjustments | 0.4% [0.1–1.2%] | 0.2% [0.0–0.7%] | D | 76 / 96 |
| Product flush/purge during changeoverForming, moulding and depositing | Setup and adjustments | 0.4% [0.1–1.2%] | 0.2% [0.0–0.7%] | D | 76 / 96 |
| Cutting blade failurePackaging (forming, sealing, wrapping, case packing, palletizing) | Equipment failure (breakdowns) | 0.4% [0.1–1.1%] | 0.2% [0.0–0.6%] | D | 112 / 155 |
| Pre-batch equipment cleaning cycleForming, moulding and depositing | Setup and adjustments | 0.4% [0.1–1.2%] | 0.2% [0.0–0.7%] | D | 76 / 96 |
| Mold base-forming adjustment during changeoverForming, moulding and depositing | Setup and adjustments | 0.4% [0.1–1.2%] | 0.2% [0.0–0.6%] | D | 76 / 96 |
| Changeover adjustment time to first good unitForming, moulding and depositing | Setup and adjustments | 0.4% [0.1–1.3%] | 0.2% [0.0–0.7%] | D | 76 / 96 |
| Tooling preparation and transport delay for changeoverForming, moulding and depositing | Setup and adjustments | 0.4% [0.1–1.3%] | 0.2% [0.0–0.7%] | D | 76 / 96 |
| Nylon washer/seal wear and failureFilling | Equipment failure (breakdowns) | 0.4% [0.1–1.1%] | 0.2% [0.0–0.7%] | D | 120 / 162 |
| Filler Sealing Pad Wear/FailureFilling | Equipment failure (breakdowns) | 0.4% [0.1–1.2%] | 0.2% [0.0–0.7%] | D | 120 / 162 |
| Crown cap sorter sensor malfunctionFilling | Equipment failure (breakdowns) | 0.4% [0.1–1.1%] | 0.2% [0.0–0.6%] | D | 120 / 162 |
| Jam/blockage at coding or sealing stationFilling | Equipment failure (breakdowns) | 0.4% [0.1–1.1%] | 0.2% [0.0–0.6%] | D | 120 / 162 |
| Product jam/blockage on infeed conveyorConveying and accumulation | Idling and minor stops (micro-stops) | 0.4% [0.1–1.2%] | 0.2% [0.0–0.7%] | D | 86 / 112 |
| Pneumatic Component Failure (Air Hose / Solenoid Valve)Filling | Equipment failure (breakdowns) | 0.4% [0.1–1.2%] | 0.2% [0.0–0.7%] | D | 120 / 162 |
| Filler centering bell fault/tripFilling | Equipment failure (breakdowns) | 0.4% [0.1–1.2%] | 0.2% [0.0–0.7%] | D | 120 / 162 |
| Filler support/bracket mechanical failureFilling | Equipment failure (breakdowns) | 0.4% [0.1–1.1%] | 0.2% [0.0–0.7%] | D | 120 / 162 |
| Bag loading/opening mechanism failureFilling | Equipment failure (breakdowns) | 0.4% [0.1–1.1%] | 0.2% [0.0–0.7%] | D | 120 / 162 |
| Gripper FailureFilling | Equipment failure (breakdowns) | 0.4% [0.1–1.2%] | 0.2% [0.0–0.7%] | D | 120 / 162 |
| Control system / software faultWhole line or unspecified equipment | Equipment failure (breakdowns) | 0.4% [0.1–1.1%] | 0.2% [0.0–0.6%] | D | 127 / 161 |
| Filler product bowl malfunctionFilling | Equipment failure (breakdowns) | 0.4% [0.1–1.1%] | 0.2% [0.0–0.7%] | D | 120 / 162 |
| Filling sensor failure (electrical/photoelectric)Filling | Equipment failure (breakdowns) | 0.4% [0.1–1.1%] | 0.2% [0.0–0.6%] | D | 120 / 162 |
| Unspecified case packer lossPackaging (forming, sealing, wrapping, case packing, palletizing) | not classifiable | 0.4% [0.1–1.2%] | 0.2% [0.0–0.7%] | D | 112 / 155 |
| Star wheel / transfer wheel timing faultFilling | Equipment failure (breakdowns) | 0.4% [0.1–1.1%] | 0.2% [0.0–0.6%] | D | 120 / 162 |
| Blower malfunctionUtilities (steam, compressed air, chilled water, power) | Equipment failure (breakdowns) | 0.4% [0.1–1.1%] | 0.2% [0.0–0.6%] | D | 131 / 165 |
| Gasket wear and replacementWhole line or unspecified equipment | Equipment failure (breakdowns) | 0.4% [0.1–1.1%] | 0.2% [0.0–0.7%] | D | 127 / 161 |
| Equipment failure from deficient basic care (overheating, blockages)Whole line or unspecified equipment | Equipment failure (breakdowns) | 0.4% [0.1–1.1%] | 0.2% [0.0–0.6%] | D | 127 / 161 |
| Filler piston wear or failureFilling | Equipment failure (breakdowns) | 0.4% [0.1–1.0%] | 0.2% [0.0–0.6%] | D | 120 / 162 |
| Startup yield loss in forming (blow moulding)Forming, moulding and depositing | Start-up losses (reduced yield) | 0.4% [0.0–1.3%] | 0.2% [0.0–0.6%] | D | 76 / 96 |
| Component wear and tearWhole line or unspecified equipment | Equipment failure (breakdowns) | 0.4% [0.1–1.1%] | 0.2% [0.0–0.6%] | D | 127 / 161 |
| Missing or illegible expiry date printPackaging (forming, sealing, wrapping, case packing, palletizing) | Process defects (scrap and rework) | 0.4% [0.1–1.1%] | 0.2% [0.0–0.5%] | D | 112 / 155 |
| Excess air entrapped in sealed bagPackaging (forming, sealing, wrapping, case packing, palletizing) | Process defects (scrap and rework) | 0.4% [0.1–1.2%] | 0.2% [0.0–0.6%] | D | 112 / 155 |
| Automatic lubricator (oiler) failureWhole line or unspecified equipment | Equipment failure (breakdowns) | 0.4% [0.1–1.1%] | 0.2% [0.0–0.6%] | D | 127 / 161 |
| Defective packaging bagsPackaging (forming, sealing, wrapping, case packing, palletizing) | Process defects (scrap and rework) | 0.4% [0.1–1.2%] | 0.2% [0.0–0.6%] | D | 112 / 155 |
| Underfill (low fill weight/volume)Packaging (forming, sealing, wrapping, case packing, palletizing) | Process defects (scrap and rework) | 0.4% [0.1–1.1%] | 0.2% [0.0–0.5%] | D | 112 / 155 |
| Inkjet printer/coder adjustmentLabeling and coding | Setup and adjustments | 0.4% [0.1–1.2%] | 0.2% [0.0–0.7%] | D | 85 / 113 |
| V-belt breakage or slippageWhole line or unspecified equipment | Equipment failure (breakdowns) | 0.4% [0.1–1.1%] | 0.2% [0.0–0.6%] | D | 127 / 161 |
| Empty container supply shortageFilling | organizational external | 0.4% [0.1–1.1%] | 0.2% [0.0–0.6%] | D | 120 / 162 |
| Water ingress / leak from rain into equipmentWhole line or unspecified equipment | Equipment failure (breakdowns) | 0.4% [0.1–1.1%] | 0.2% [0.0–0.6%] | D | 127 / 161 |
| Staff meetings and briefingsFilling | organizational external | 0.4% [0.1–1.1%] | 0.2% [0.0–0.6%] | D | 120 / 162 |
| Manual filling/weighing variationFilling | Process defects (scrap and rework) | 0.4% [0.1–1.1%] | 0.2% [0.0–0.5%] | D | 120 / 162 |
| Scheduled overtime / extra production hoursWhole line or unspecified equipment | planned downtime | 0.4% [0.1–1.1%] | 0.2% [0.0–0.6%] | D | 127 / 161 |
| Aseptic carton form-fill-seal defectPackaging (forming, sealing, wrapping, case packing, palletizing) | Process defects (scrap and rework) | 0.4% [0.1–1.1%] | 0.2% [0.0–0.5%] | D | 112 / 155 |
| Unspecified quality or process issueWhole line or unspecified equipment | not classifiable | 0.4% [0.1–1.1%] | 0.2% [0.0–0.6%] | D | 127 / 161 |
| External supply disruption (utilities or spare parts)Whole line or unspecified equipment | organizational external | 0.4% [0.1–1.1%] | 0.2% [0.0–0.6%] | D | 127 / 161 |
| Scheduled Operator BreaksWhole line or unspecified equipment | planned downtime | 0.4% [0.1–1.1%] | 0.2% [0.0–0.6%] | D | 127 / 161 |
| Excessive Product Foaming During FillingFilling | Process defects (scrap and rework) | 0.4% [0.1–1.1%] | 0.2% [0.0–0.5%] | D | 120 / 162 |
| Operator assessment delayWhole line or unspecified equipment | organizational external | 0.4% [0.1–1.1%] | 0.2% [0.0–0.6%] | D | 127 / 161 |
| Manual rework due to packaging sealing defectsFilling | Process defects (scrap and rework) | 0.4% [0.1–1.1%] | 0.2% [0.0–0.5%] | D | 120 / 162 |
| Unspecified equipment failure or adjustment stopWhole line or unspecified equipment | not classifiable | 0.4% [0.1–1.1%] | 0.2% [0.0–0.6%] | D | 127 / 161 |
| Thermal variability during tempering affecting fill accuracyFilling | Process defects (scrap and rework) | 0.4% [0.1–1.1%] | 0.2% [0.0–0.5%] | D | 120 / 162 |
| Defective incoming pouch from supplierFilling | Process defects (scrap and rework) | 0.4% [0.1–1.1%] | 0.2% [0.0–0.5%] | D | 120 / 162 |
| Combined breakdown and changeover downtimeWhole line or unspecified equipment | not classifiable | 0.4% [0.1–1.1%] | 0.2% [0.0–0.6%] | D | 127 / 161 |
| Inadequate real-time detection of defective materialsWhole line or unspecified equipment | Process defects (scrap and rework) | 0.4% [0.1–1.1%] | 0.2% [0.0–0.5%] | D | 127 / 161 |
| Unspecified bottling line cycle time lossWhole line or unspecified equipment | not classifiable | 0.4% [0.1–1.1%] | 0.2% [0.0–0.6%] | D | 127 / 161 |
| Scheduled cleaning following equipment modificationWhole line or unspecified equipment | planned downtime | 0.4% [0.1–1.0%] | 0.2% [0.0–0.6%] | D | 127 / 161 |
| Delay awaiting quality laboratory analysis (titratable acidity)Whole line or unspecified equipment | organizational external | 0.4% [0.1–1.1%] | 0.2% [0.0–0.6%] | D | 127 / 161 |
| Deficient visual management / communication of standardsWhole line or unspecified equipment | organizational external | 0.4% [0.1–1.0%] | 0.2% [0.0–0.6%] | D | 127 / 161 |
| Bag re-feeding after misfeed or jamPackaging (forming, sealing, wrapping, case packing, palletizing) | Idling and minor stops (micro-stops) | 0.4% [0.1–1.2%] | 0.2% [0.0–0.6%] | D | 112 / 155 |
| Batch product out of composition specificationWhole line or unspecified equipment | Process defects (scrap and rework) | 0.4% [0.1–1.0%] | 0.2% [0.0–0.5%] | D | 127 / 161 |
| Packaging material shortage (cans, bottles, crates, labels, crowns)Whole line or unspecified equipment | organizational external | 0.4% [0.1–1.0%] | 0.2% [0.0–0.6%] | D | 127 / 161 |
| Doser calibration driftFilling | Process defects (scrap and rework) | 0.4% [0.1–1.0%] | 0.2% [0.0–0.5%] | D | 120 / 162 |
| Improper bag attachment to filling/packaging spoutPackaging (forming, sealing, wrapping, case packing, palletizing) | Idling and minor stops (micro-stops) | 0.4% [0.1–1.1%] | 0.2% [0.0–0.6%] | D | 112 / 155 |
| Bottle jam or fall on conveyorFilling | Idling and minor stops (micro-stops) | 0.3% [0.1–1.1%] | 0.2% [0.0–0.6%] | D | 120 / 162 |
| Tilting mechanism jamFilling | Idling and minor stops (micro-stops) | 0.3% [0.1–1.0%] | 0.2% [0.0–0.5%] | D | 120 / 162 |
| Bottle jam on spiral infeed screwFilling | Idling and minor stops (micro-stops) | 0.3% [0.1–1.0%] | 0.2% [0.0–0.5%] | D | 120 / 162 |
| Folding bracket assembly during changeoverPackaging (forming, sealing, wrapping, case packing, palletizing) | Setup and adjustments | 0.3% [0.1–1.0%] | 0.2% [0.0–0.6%] | D | 112 / 155 |
| Non-optimized changeover procedureFilling | Setup and adjustments | 0.3% [0.1–1.0%] | 0.2% [0.0–0.6%] | D | 120 / 162 |
| Boiler minor stoppageUtilities (steam, compressed air, chilled water, power) | Idling and minor stops (micro-stops) | 0.3% [0.1–1.0%] | 0.2% [0.0–0.5%] | D | 131 / 165 |
| CIP conductivity/temperature transmitter malfunctionFilling | Setup and adjustments | 0.3% [0.1–1.0%] | 0.2% [0.0–0.6%] | D | 120 / 162 |
| Transport System Changeover AdjustmentPackaging (forming, sealing, wrapping, case packing, palletizing) | Setup and adjustments | 0.3% [0.1–1.0%] | 0.2% [0.0–0.6%] | D | 112 / 155 |
| Pallet Supply DepletionFilling | Idling and minor stops (micro-stops) | 0.3% [0.1–1.0%] | 0.2% [0.0–0.5%] | D | 120 / 162 |
| Shift handover documentation updateFilling | Setup and adjustments | 0.3% [0.1–1.0%] | 0.2% [0.0–0.6%] | D | 120 / 162 |
| Manual ingredient loading into filling tankFilling | Setup and adjustments | 0.3% [0.1–1.0%] | 0.2% [0.0–0.6%] | D | 120 / 162 |
| Changeover tooling disorganization (lack of 5S)Filling | Setup and adjustments | 0.3% [0.1–1.0%] | 0.2% [0.0–0.6%] | D | 120 / 162 |
| Human error in calibration or operationWhole line or unspecified equipment | Idling and minor stops (micro-stops) | 0.3% [0.1–1.0%] | 0.2% [0.0–0.5%] | D | 127 / 161 |
| Cut-open rework of filled packages at changeoverFilling | Setup and adjustments | 0.3% [0.1–1.0%] | 0.2% [0.0–0.6%] | D | 120 / 162 |
| Changeover to new plastic package formatFilling | Setup and adjustments | 0.3% [0.1–1.0%] | 0.2% [0.0–0.5%] | D | 120 / 162 |
| Waiting for empty container supplyFilling | Setup and adjustments | 0.3% [0.1–1.0%] | 0.2% [0.0–0.6%] | D | 120 / 162 |
| Buffer/Bright Tank Changeover DelayFilling | Setup and adjustments | 0.3% [0.1–1.0%] | 0.2% [0.0–0.6%] | D | 120 / 162 |
| First-piece inspection after changeoverFilling | Setup and adjustments | 0.3% [0.1–1.0%] | 0.2% [0.0–0.5%] | D | 120 / 162 |
| Extended setup time after weekend shutdownWhole line or unspecified equipment | Setup and adjustments | 0.3% [0.1–1.0%] | 0.2% [0.0–0.6%] | D | 127 / 161 |
| Fill volume setpoint adjustmentFilling | Setup and adjustments | 0.3% [0.1–1.0%] | 0.2% [0.0–0.5%] | D | 120 / 162 |
| CIP cleaning during changeoverCleaning in place (CIP) and sanitation | Setup and adjustments | 0.3% [0.1–1.0%] | 0.2% [0.0–0.6%] | D | 129 / 163 |
| Commissioning of new inline density/gravity sensorFilling | Setup and adjustments | 0.3% [0.1–0.9%] | 0.2% [0.0–0.5%] | D | 120 / 162 |
| Boiler changeover and adjustmentUtilities (steam, compressed air, chilled water, power) | Setup and adjustments | 0.3% [0.1–0.9%] | 0.2% [0.0–0.5%] | D | 131 / 165 |
| Equipment installation time during changeoverWhole line or unspecified equipment | Setup and adjustments | 0.3% [0.1–1.0%] | 0.2% [0.0–0.6%] | D | 127 / 161 |
| Boiler warm-up and equipment shutdown sequence at startupUtilities (steam, compressed air, chilled water, power) | Setup and adjustments | 0.3% [0.1–0.9%] | 0.2% [0.0–0.5%] | D | 131 / 165 |
| Filler start-up yield lossFilling | Start-up losses (reduced yield) | 0.3% [0.0–1.0%] | 0.1% [0.0–0.5%] | D | 120 / 162 |
| Yield loss during start-up/transitionWhole line or unspecified equipment | Start-up losses (reduced yield) | 0.3% [0.0–1.0%] | 0.1% [0.0–0.5%] | D | 127 / 161 |