What happens
The cooker relies on steam generated by auxiliary boilers, so before a production run can begin the boilers must be ignited and brought up to operating pressure and temperature before steam can be supplied to the cooker. At the end of the run the cooker must be powered down and the steam supply cut, and both the warm-up and shutdown sequences consume time in which no product is being processed.
What is done about it
Pre-heat boilers ahead of the scheduled production start so steam is already available when the cooker is needed, and maintain standby boiler capacity to shorten ramp-up time. Standardize and document startup and shutdown sequences, and monitor steam ramp curves to identify opportunities to reduce the time lost in these transitions.
Practical guidance written from engineering knowledge; it is not a statistical estimate.
1Probability and evidence
- Probability of presence
- 0.5% [0.1–1.6%]
- Expected share of lost time
- 0.3% [0.0–0.9%]
- Share of lost time when present
- 56% [44–67%]
- Studies / units
- 37 / 44
- Evidence grade
- D
Grade D: 0 or 1 study; the estimate is driven by partial pooling and priors, and the wide interval is the result.
2Probability by segment
- Dairy products0.6% [0.0–2.3%]5 studies
- Soft drinks, bottled water and juices0.6% [0.0–2.4%]1 study
- Brewing, wine and spirits0.6% [0.0–2.4%]1 study
- Bakery and pasta0.6% [0.0–2.5%]0 studies
- Meat, poultry and seafood0.6% [0.0–2.7%]2 studies
- Fruit and vegetable processing0.6% [0.0–2.1%]3 studies
- Grain and oilseed milling0.6% [0.0–2.3%]6 studies
- Sugar and confectionery0.6% [0.0–2.3%]3 studies
- Snacks, coffee, tea and other foods0.6% [0.0–2.5%]4 studies
- Animal feed and pet food0.6% [0.0–2.4%]5 studies
- Food manufacturing (unspecified or mixed)0.6% [0.0–2.3%]7 studies
3Mechanism, SCADA signature and countermeasure
Mechanism
Engineering guidanceThe cooker relies on steam generated by auxiliary boilers, so before a production run can begin the boilers must be ignited and brought up to operating pressure and temperature before steam can be supplied to the cooker. At the end of the run the cooker must be powered down and the steam supply cut, and both the warm-up and shutdown sequences consume time in which no product is being processed.
How it looks in SCADA data
Engineering guidanceSCADA/MES logs show the boiler changing from off to an ignition or ramp-up state with steam pressure and temperature curves rising gradually to setpoint before the cooker enters its production state, and the reverse pattern of declining steam parameters and cooker cool-down at the end of the run. These periods appear as extended non-productive machine states (standby, warm-up, shutdown) bracketing the actual processing state, with zero throughput recorded during the transition.
Countermeasure
Engineering guidancePre-heat boilers ahead of the scheduled production start so steam is already available when the cooker is needed, and maintain standby boiler capacity to shorten ramp-up time. Standardize and document startup and shutdown sequences, and monitor steam ramp curves to identify opportunities to reduce the time lost in these transitions.
4Sources
- Mejora de la Eficiencia General de los Equipos (EGE) en la etapa de prensado: Un estudio de caso en la industria de harina de pescado (2024)Open sourceLost time: 654 s · as reported: “Encender calderos para generar vapor al cocinador”
Show verbatim quote
Encender calderos para generar vapor al cocinador 653, 5
- Mejora de la Eficiencia General de los Equipos (EGE) en la etapa de prensado: Un estudio de caso en la industria de harina de pescado (2024)Open sourceLost time: 13.5 s · as reported: “Apagar cocinador”
Show verbatim quote
Apagar cocinador 13,5