foratvise
Get Started
Idling and minor stops (micro-stops)

Line imbalance stop (starvation/blocking)

Idling and minor stops (micro-stops)PerformanceForming, moulding and depositing

In short

It appears in about 1 of every 100 lines studied.

When it appears, it takes on average about 54 % of the line's lost time. Reported by 1 of the 76 studies that could observe it (sparse evidence).

What happens

The stretch-blow molder is automatically paused by its control system either because upstream supply of preforms or compressed air is temporarily lacking (starvation) or because downstream conveying or packaging equipment cannot accept output and a tailback forms (blocking). The generic state labels recorded by the line SCADA (held, lack, tailback, prepared, production) reflect transitions between running, waiting-for-material, waiting-for-space and changeover states rather than a single mechanical failure.

What is done about it

Size and manage buffer accumulation (conveyors, surge bins) between the molder and adjacent stations to absorb short-term rate mismatches, synchronize line speeds, and tune sensors that trigger lack/tailback states to avoid nuisance stops. Review changeover and preparation procedures separately from these line-balance states so causes are not conflated in reporting.

Practical guidance written from engineering knowledge; it is not a statistical estimate.

1Probability and evidence

Pooled over all segments. A wide interval is a result: it states how much the evidence allows us to know.
Probability of presence
0.6% [0.1–1.8%]
Expected share of lost time
0.3% [0.1–1.0%]
Share of lost time when present
54% [42–65%]
Studies / units
76 / 96
Evidence grade
D

Grade D: 0 or 1 study; the estimate is driven by partial pooling and priors, and the wide interval is the result.

2Probability by segment

Partially pooled estimates for each industry segment.
  • Dairy products
    0.8% [0.1–3.2%]5 studies
  • Soft drinks, bottled water and juices
    1.0% [0.1–3.8%]11 studies
  • Brewing, wine and spirits
    0.8% [0.1–3.3%]0 studies
  • Bakery and pasta
    0.7% [0.1–2.4%]25 studies
  • Meat, poultry and seafood
    0.8% [0.1–3.0%]3 studies
  • Fruit and vegetable processing
    0.8% [0.1–3.0%]3 studies
  • Grain and oilseed milling
    0.8% [0.1–3.5%]0 studies
  • Sugar and confectionery
    0.7% [0.1–2.6%]8 studies
  • Snacks, coffee, tea and other foods
    0.7% [0.1–2.7%]7 studies
  • Animal feed and pet food
    0.8% [0.1–2.9%]6 studies
  • Food manufacturing (unspecified or mixed)
    0.8% [0.1–2.8%]8 studies

3Mechanism, SCADA signature and countermeasure

Engineering guidance that helps recognise and address the cause; it is not part of the statistical estimate.

Mechanism

Engineering guidance

The stretch-blow molder is automatically paused by its control system either because upstream supply of preforms or compressed air is temporarily lacking (starvation) or because downstream conveying or packaging equipment cannot accept output and a tailback forms (blocking). The generic state labels recorded by the line SCADA (held, lack, tailback, prepared, production) reflect transitions between running, waiting-for-material, waiting-for-space and changeover states rather than a single mechanical failure.

How it looks in SCADA data

Engineering guidance

Frequent, short-duration state changes alternating between running and non-running states labeled as lack-of-material or tailback, often correlated with starved/blocked states of adjacent upstream or downstream machines in the line topology; occasional longer events are tagged as held, prepared or equipment failure depending on cause. Total runtime counters show the sum of these intermittent stops without a specific fault code.

Countermeasure

Engineering guidance

Size and manage buffer accumulation (conveyors, surge bins) between the molder and adjacent stations to absorb short-term rate mismatches, synchronize line speeds, and tune sensors that trigger lack/tailback states to avoid nuisance stops. Review changeover and preparation procedures separately from these line-balance states so causes are not conflated in reporting.

4Sources

Every extracted datum with its study, value and verbatim quote.
  1. Specific energy: 4,290 Wh/1000 Bottles · as reported: “Production”
    Show verbatim quote
    Production 119 4290.2 117 212.8 121 581.6
  2. Lost time: 4.60 h · as reported: “Prepared”
    Show verbatim quote
    Prepared 4.6 12.4 5.2 8.1 3.5 3.3
  3. Specific energy: 12.4 Wh/1000 Bottles · as reported: “Prepared”
    Show verbatim quote
    Prepared 4.6 12.4 5.2 8.1 3.5 3.3
  4. Lost time: 0.100 h · as reported: “Lack”
    Show verbatim quote
    Lack 0.1 1.3 0.0 0.0 4.6 4.4
  5. Specific energy: 1.30 Wh/1000 Bottles · as reported: “Lack”
    Show verbatim quote
    Lack 0.1 1.3 0.0 0.0 4.6 4.4
  6. Lost time: 6.80 h · as reported: “Tailback”
    Show verbatim quote
    Tailback 6.8 145.8 7.8 9.9 4.8 4.6
  7. Specific energy: 146 Wh/1000 Bottles · as reported: “Tailback”
    Show verbatim quote
    Tailback 6.8 145.8 7.8 9.9 4.8 4.6
  8. Lost time: 8.10 h · as reported: “Equipment failure”
    Show verbatim quote
    Equipment failure 8.1 195.6 4.9 6.5 2.5 2.2
  9. Specific energy: 196 Wh/1000 Bottles · as reported: “Equipment failure”
    Show verbatim quote
    Equipment failure 8.1 195.6 4.9 6.5 2.5 2.2
  10. Lost time: 29.2 h · as reported: “Held”
    Show verbatim quote
    Held 29.2 48.7 33 37.4 31.7 25.2
  11. Specific energy: 48.7 Wh/1000 Bottles · as reported: “Held”
    Show verbatim quote
    Held 29.2 48.7 33 37.4 31.7 25.2
  12. Specific energy: 4,694 Wh/1000 Bottles · as reported: “Total”
    Show verbatim quote
    Total 4694.0 274.8 621.2