Press changeover for format/product change
In short
It appears in about 1 of every 100 lines studied.
When it appears, it takes on average about 57 % of the line's lost time. Reported by 1 of the 37 studies that could observe it (sparse evidence).
What happens
To adapt the press to a new product or format the line must be stopped and opened, distribution belts and pulleys dismounted and remounted, the feed system cleaned and checked, and the drive motor speed re-regulated with the frequency converter before production can resume; these sequential mechanical and adjustment tasks keep the press out of production.
What is done about it
Apply SMED principles to the press changeover: pre-stage and label belts and pulleys for each format, use quick-release fasteners and modular feed-system parts, pre-program frequency-drive speed setpoints per format, and separate internal from external setup tasks so most preparation happens while the press is still running.
Practical guidance written from engineering knowledge; it is not a statistical estimate.
1Probability and evidence
- Probability of presence
- 0.8% [0.1–2.6%]
- Expected share of lost time
- 0.5% [0.1–1.5%]
- Share of lost time when present
- 57% [45–67%]
- Studies / units
- 37 / 44
- Evidence grade
- D
Grade D: 0 or 1 study; the estimate is driven by partial pooling and priors, and the wide interval is the result.
2Probability by segment
- Dairy products1.0% [0.1–3.9%]5 studies
- Soft drinks, bottled water and juices1.0% [0.1–4.0%]1 study
- Brewing, wine and spirits1.0% [0.1–4.0%]1 study
- Bakery and pasta1.0% [0.1–4.2%]0 studies
- Meat, poultry and seafood1.0% [0.1–3.6%]2 studies
- Fruit and vegetable processing1.0% [0.1–3.9%]3 studies
- Grain and oilseed milling1.0% [0.1–3.8%]6 studies
- Sugar and confectionery1.0% [0.1–4.0%]3 studies
- Snacks, coffee, tea and other foods1.0% [0.1–4.0%]4 studies
- Animal feed and pet food1.4% [0.1–5.3%]5 studies
- Food manufacturing (unspecified or mixed)1.0% [0.1–3.9%]7 studies
3Mechanism, SCADA signature and countermeasure
Mechanism
Engineering guidanceTo adapt the press to a new product or format the line must be stopped and opened, distribution belts and pulleys dismounted and remounted, the feed system cleaned and checked, and the drive motor speed re-regulated with the frequency converter before production can resume; these sequential mechanical and adjustment tasks keep the press out of production.
How it looks in SCADA data
Engineering guidanceSCADA/MES logs a changeover or stopped machine state on the press for an extended, non-cyclical duration, with motor speed/frequency-drive signal ramping to zero and later to a new setpoint, feed-system flow or presence sensors flat-lined, and no good-part counts registered until restart; downstream and upstream equipment show starvation or blocking aligned with the same window.
Countermeasure
Engineering guidanceApply SMED principles to the press changeover: pre-stage and label belts and pulleys for each format, use quick-release fasteners and modular feed-system parts, pre-program frequency-drive speed setpoints per format, and separate internal from external setup tasks so most preparation happens while the press is still running.
4Sources
- Mejora de la Eficiencia General de los Equipos (EGE) en la etapa de prensado: Un estudio de caso en la industria de harina de pescado (2024)Open sourceLost time: 8.90 s · as reported: “Verificar sistema de alimentación de la prensa”
Show verbatim quote
Verificar sistema de alimentación de la prensa 8,9
- Mejora de la Eficiencia General de los Equipos (EGE) en la etapa de prensado: Un estudio de caso en la industria de harina de pescado (2024)Open sourceLost time: 169 s · as reported: “Aperturar el interior de la prensa”
Show verbatim quote
Aperturar el interior de la prensa 169, 3
- Mejora de la Eficiencia General de los Equipos (EGE) en la etapa de prensado: Un estudio de caso en la industria de harina de pescado (2024)Open sourceLost time: 440 s · as reported: “Desmontar bandas de distribución”
Show verbatim quote
Desmontar bandas de distribución 439, 6
- Mejora de la Eficiencia General de los Equipos (EGE) en la etapa de prensado: Un estudio de caso en la industria de harina de pescado (2024)Open sourceLost time: 105 s · as reported: “Limpiar el sistema de alimentación de la prensa”
Show verbatim quote
Limpiar el sistema de alimentación de la prensa 104, 5
- Mejora de la Eficiencia General de los Equipos (EGE) en la etapa de prensado: Un estudio de caso en la industria de harina de pescado (2024)Open sourceLost time: 622 s · as reported: “Empezar a procesar en la prensa”
Show verbatim quote
Empezar a procesar en la prensa 622, 4
- Mejora de la Eficiencia General de los Equipos (EGE) en la etapa de prensado: Un estudio de caso en la industria de harina de pescado (2024)Open sourceLost time: 310 s · as reported: “Regular motor de prensa para el nuevo formato”
Show verbatim quote
Regular motor de prensa para el nuevo formato 309, 9
- Mejora de la Eficiencia General de los Equipos (EGE) en la etapa de prensado: Un estudio de caso en la industria de harina de pescado (2024)Open sourceLost time: 389 s · as reported: “Colocar las bandas de distribución”
Show verbatim quote
Colocar las bandas de distribución 388, 8
- Mejora de la Eficiencia General de los Equipos (EGE) en la etapa de prensado: Un estudio de caso en la industria de harina de pescado (2024)Open sourceLost time: 336 s · as reported: “Montar las nuevas poleas”
Show verbatim quote
Montar las nuevas poleas 336, 2
- Mejora de la Eficiencia General de los Equipos (EGE) en la etapa de prensado: Un estudio de caso en la industria de harina de pescado (2024)Open sourceLost time: 48.9 s · as reported: “Encender el sumidero de prensa”
Show verbatim quote
Encender el sumidero de prensa 48,9
- Mejora de la Eficiencia General de los Equipos (EGE) en la etapa de prensado: Un estudio de caso en la industria de harina de pescado (2024)Open sourceLost time: 6.80 s · as reported: “Verificar que la prensa esté detenida”
Show verbatim quote
Verificar que la prensa esté detenida 6,8
- Mejora de la Eficiencia General de los Equipos (EGE) en la etapa de prensado: Un estudio de caso en la industria de harina de pescado (2024)Open sourceLost time: 459 s · as reported: “Desmontar poleas”
Show verbatim quote
Desmontar poleas 458, 7
- Mejora de la Eficiencia General de los Equipos (EGE) en la etapa de prensado: Un estudio de caso en la industria de harina de pescado (2024)Open sourceLost time: 183 s · as reported: “Limpiar la prensa con agua a presión”
Show verbatim quote
Limpiar la prensa con agua a presión 182, 7
- Mejora de la Eficiencia General de los Equipos (EGE) en la etapa de prensado: Un estudio de caso en la industria de harina de pescado (2024)Open sourceLost time: 223 s · as reported: “Encender la prensa”
Show verbatim quote
Encender la prensa 223, 1
- Mejora de la Eficiencia General de los Equipos (EGE) en la etapa de prensado: Un estudio de caso en la industria de harina de pescado (2024)Open sourceLost time: 9.40 s · as reported: “Apagar la prensa”
Show verbatim quote
Apagar la prensa 9,4
- Mejora de la Eficiencia General de los Equipos (EGE) en la etapa de prensado: Un estudio de caso en la industria de harina de pescado (2024)Open sourceLost time: 769 s · as reported: “Reajustar velocidad de motor mediante variador de frecuencia”
Show verbatim quote
17 Reajustar velocidad de motor mediante variador de frecuencia 768,6