Press changeover for format/product change

In short

It appears in about 1 of every 100 lines studied.

When it appears, it takes on average about 57 % of the line's lost time. Reported by 1 of the 37 studies that could observe it (sparse evidence).

What happens

To adapt the press to a new product or format the line must be stopped and opened, distribution belts and pulleys dismounted and remounted, the feed system cleaned and checked, and the drive motor speed re-regulated with the frequency converter before production can resume; these sequential mechanical and adjustment tasks keep the press out of production.

What is done about it

Apply SMED principles to the press changeover: pre-stage and label belts and pulleys for each format, use quick-release fasteners and modular feed-system parts, pre-program frequency-drive speed setpoints per format, and separate internal from external setup tasks so most preparation happens while the press is still running.

Practical guidance written from engineering knowledge; it is not a statistical estimate.

1Probability and evidence

Pooled over all segments. A wide interval is a result: it states how much the evidence allows us to know.
Probability of presence
0.8% [0.1–2.6%]
Expected share of lost time
0.5% [0.1–1.5%]
Share of lost time when present
57% [45–67%]
Studies / units
37 / 44
Evidence grade
D

Grade D: 0 or 1 study; the estimate is driven by partial pooling and priors, and the wide interval is the result.

2Probability by segment

Partially pooled estimates for each industry segment.
  • Dairy products
    1.0% [0.1–3.9%]5 studies
  • Soft drinks, bottled water and juices
    1.0% [0.1–4.0%]1 study
  • Brewing, wine and spirits
    1.0% [0.1–4.0%]1 study
  • Bakery and pasta
    1.0% [0.1–4.2%]0 studies
  • Meat, poultry and seafood
    1.0% [0.1–3.6%]2 studies
  • Fruit and vegetable processing
    1.0% [0.1–3.9%]3 studies
  • Grain and oilseed milling
    1.0% [0.1–3.8%]6 studies
  • Sugar and confectionery
    1.0% [0.1–4.0%]3 studies
  • Snacks, coffee, tea and other foods
    1.0% [0.1–4.0%]4 studies
  • Animal feed and pet food
    1.4% [0.1–5.3%]5 studies
  • Food manufacturing (unspecified or mixed)
    1.0% [0.1–3.9%]7 studies

3Mechanism, SCADA signature and countermeasure

Engineering guidance that helps recognise and address the cause; it is not part of the statistical estimate.

Mechanism

Engineering guidance

To adapt the press to a new product or format the line must be stopped and opened, distribution belts and pulleys dismounted and remounted, the feed system cleaned and checked, and the drive motor speed re-regulated with the frequency converter before production can resume; these sequential mechanical and adjustment tasks keep the press out of production.

How it looks in SCADA data

Engineering guidance

SCADA/MES logs a changeover or stopped machine state on the press for an extended, non-cyclical duration, with motor speed/frequency-drive signal ramping to zero and later to a new setpoint, feed-system flow or presence sensors flat-lined, and no good-part counts registered until restart; downstream and upstream equipment show starvation or blocking aligned with the same window.

Countermeasure

Engineering guidance

Apply SMED principles to the press changeover: pre-stage and label belts and pulleys for each format, use quick-release fasteners and modular feed-system parts, pre-program frequency-drive speed setpoints per format, and separate internal from external setup tasks so most preparation happens while the press is still running.

4Sources

Every extracted datum with its study, value and verbatim quote.
  1. Lost time: 8.90 s · as reported: “Verificar sistema de alimentación de la prensa”
    Show verbatim quote
    Verificar sistema de alimentación de la prensa 8,9
  2. Lost time: 169 s · as reported: “Aperturar el interior de la prensa”
    Show verbatim quote
    Aperturar el interior de la prensa 169, 3
  3. Lost time: 440 s · as reported: “Desmontar bandas de distribución”
    Show verbatim quote
    Desmontar bandas de distribución 439, 6
  4. Lost time: 105 s · as reported: “Limpiar el sistema de alimentación de la prensa”
    Show verbatim quote
    Limpiar el sistema de alimentación de la prensa 104, 5
  5. Lost time: 622 s · as reported: “Empezar a procesar en la prensa”
    Show verbatim quote
    Empezar a procesar en la prensa 622, 4
  6. Lost time: 310 s · as reported: “Regular motor de prensa para el nuevo formato”
    Show verbatim quote
    Regular motor de prensa para el nuevo formato 309, 9
  7. Lost time: 389 s · as reported: “Colocar las bandas de distribución”
    Show verbatim quote
    Colocar las bandas de distribución 388, 8
  8. Lost time: 336 s · as reported: “Montar las nuevas poleas”
    Show verbatim quote
    Montar las nuevas poleas 336, 2
  9. Lost time: 48.9 s · as reported: “Encender el sumidero de prensa”
    Show verbatim quote
    Encender el sumidero de prensa 48,9
  10. Lost time: 6.80 s · as reported: “Verificar que la prensa esté detenida”
    Show verbatim quote
    Verificar que la prensa esté detenida 6,8
  11. Lost time: 459 s · as reported: “Desmontar poleas”
    Show verbatim quote
    Desmontar poleas 458, 7
  12. Lost time: 183 s · as reported: “Limpiar la prensa con agua a presión”
    Show verbatim quote
    Limpiar la prensa con agua a presión 182, 7
  13. Lost time: 223 s · as reported: “Encender la prensa”
    Show verbatim quote
    Encender la prensa 223, 1
  14. Lost time: 9.40 s · as reported: “Apagar la prensa”
    Show verbatim quote
    Apagar la prensa 9,4
  15. Lost time: 769 s · as reported: “Reajustar velocidad de motor mediante variador de frecuencia”
    Show verbatim quote
    17 Reajustar velocidad de motor mediante variador de frecuencia 768,6