Automatic translation of plant data into management performance metrics: a case for real-time and predictive production control

Open source

1Bibliographic record

Authors
Alireza Mousavi, H.R.A. Siervo
Year
2016
Venue
International Journal of Production Research
Country
Germany
Segment
Brewing, wine and spirits
Process family
Thermal processing
Study type
Single case study
Extraction scope
Full text
Size
1 plants · 1 lines · 12 machines
Observation period
1 days
Data collection
automatic_monitoring
Intervention
Show the setting as described by the study
The brewhouse production line model measures the utilisation of resources, Overall Equipment Effectiveness, and Overall Line Effectiveness in real-time and fast-forward mode simulation.

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 14Low risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described.2 / 2
Is the observation period long enough and reported?Period reported but shorter than 30 days, or only the number of shifts is given.1 / 2
How were loss data collected?Automatic line monitoring, or systematic logs covering every stop in the period.2 / 2
Are OEE, loading time and the loss categories defined explicitly?Formulae or definitions are given for the reported metrics, including what counts as planned time.2 / 2
Does the loss breakdown account for the total loss it claims to explain?Only the top causes are reported and the unexplained remainder can be computed.1 / 2
Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method.2 / 2
Are the reported numbers internally consistent?Recomputed totals, shares and OEE factors agree with the reported values within 2 percentage points.2 / 2
Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result.2 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
—Lauterstar
Show verbatim quote (Figure 10)
1.00 0.73 0.27 1.00 Lauterstar OEE Efficiency components
noneAvailability1.00 ratioBoth extractors agreed
—Malt Transport
Show verbatim quote (Figure 9)
1.00 0.40 0.93 1.00 Availability (AE) Operational (OE) Rate (RE) Quality (QE) Malt Transport OEE Efficiency components
noneAvailability1.00 ratioSingle extractor
—Malt Transport
Show verbatim quote (Figure 9)
1.00 0.40 0.93 1.00 Availability (AE) Operational (OE) Rate (RE) Quality (QE) Malt Transport OEE Efficiency components
nonePerformance0.930 ratioSingle extractor
—Malt Transport
Show verbatim quote (Figure 9)
1.00 0.40 0.93 1.00 Availability (AE) Operational (OE) Rate (RE) Quality (QE) Malt Transport OEE Efficiency components
noneQuality1.00 ratioSingle extractor
—Lauterstar
Show verbatim quote (Figure 10)
1.00 0.73 0.27 1.00 Lauterstar OEE Efficiency components
nonePerformance0.270 ratioSingle extractor
—Lauterstar
Show verbatim quote (Figure 10)
1.00 0.73 0.27 1.00 Lauterstar OEE Efficiency components
noneQuality1.00 ratioSingle extractor
—Prerun Tank
Show verbatim quote (Figure 10)
1.00 0.30 0.93 1.00 PRerun Tank OEE Efficiency components
noneAvailability1.00 ratioSingle extractor
—Prerun Tank
Show verbatim quote (Figure 10)
1.00 0.30 0.93 1.00 PRerun Tank OEE Efficiency components
nonePerformance0.930 ratioSingle extractor
—Prerun Tank
Show verbatim quote (Figure 10)
1.00 0.30 0.93 1.00 PRerun Tank OEE Efficiency components
noneQuality1.00 ratioSingle extractor
—Brewhouse line
Show verbatim quote (Figure 11)
1.00 0.68 LA LPQP OLE components
noneAvailability1.00 ratioSingle extractor
—Mashtun
Show verbatim quote (Page 11)
In this example, the real bottleneck is the Mashtun with a scheduled utilisation of 0.907.
noneShare of planned time0.907 -Single extractor

Observation units

  • Lauterstar · Separation (centrifugation, filtration, membranes) · Baseline
  • Malt Transport · Conveying and accumulation · Baseline
  • Prerun Tank · Separation (centrifugation, filtration, membranes) · Baseline
  • Brewhouse line · Whole line or unspecified equipment · Baseline
  • Mashtun · Mixing and blending · Baseline