Total Productive Maintenance Analysis of The Oven Machine Using Overall Equipment Effectiveness Method
1Bibliographic record
- Authors
- Muhammad Azyumiardi Azra, Khusna Dwijayanti
- Year
- 2022
- Venue
- Journal of Industrial Engineering and Halal Industries
- Country
- Indonesia
- Segment
- Bakery and pasta
- Process family
- Forming, baking and cooking
- Study type
- Single case study
- Extraction scope
- Full text
- Size
- 1 plants · — lines · 1 machines
- Observation period
- 30 days
- Data collection
- manual_logs
- Intervention
Show the setting as described by the study
CV Halalan Thoyiban is a bakery company produces various kinds of bread.
2Risk of bias
Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 14Low risk
| Item | Score |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described. | 2 / 2 |
| Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events). | 2 / 2 |
| How were loss data collected?Manual logs or maintenance records with unknown completeness. | 1 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?Formulae or definitions are given for the reported metrics, including what counts as planned time. | 2 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?Only the top causes are reported and the unexplained remainder can be computed. | 1 / 2 |
| Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method. | 2 / 2 |
| Are the reported numbers internally consistent?Recomputed totals, shares and OEE factors agree with the reported values within 2 percentage points. | 2 / 2 |
| Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result. | 2 / 2 |
3Extracted data
Each datum with its classification and the verbatim quote that states it.
| Reported cause | Loss category | Metric | Value | Extraction |
|---|---|---|---|---|
—oven machineShow verbatim quote (Table 6 / Results text)The average quality rate of the oven machine for 1 month is 93.30%. | none | Quality | 93.3 % | Both extractors agreed |
—oven machineShow verbatim quote (Table 4 / Results text)From the results of availability rate calculations, the average availability rate of oven machines for 1 month is 59.72%. | none | Availability | 59.7 % | Both extractors agreed |
—oven machineShow verbatim quote (Table 8. OEE Calculation)Average 59.72 % 68.90 % 93.30 % 38.06 % | none | Performance | 68.9 % | Both extractors agreed |
—oven machineShow verbatim quote (Table 8. OEE Calculation)Average 59.72 % 68.90 % 93.30 % 38.06 % | none | OEE | 38.1 % | Both extractors agreed |
—oven machineShow verbatim quote (Table 5. Calculation of Performance Rate of Oven Machine)Total 80922 0.041667 4930 68.93% | none | Performance | 68.9 % | Single extractor |
Downtimeoven machineShow verbatim quote (Table 3. Data of Total Break Downtime of Oven Machine)Total 2270 630 | Equipment failure (breakdowns) | Lost time | 2,270 min | Single extractor |
Set Up Timeoven machineShow verbatim quote (Table 3. Data of Total Break Downtime of Oven Machine)Total 2270 630 | Setup and adjustments | Lost time | 630 min | Single extractor |
Product Defectoven machineShow verbatim quote (Table 2. The Products Defect Ratio)Total 80922 5358 6,62% | Process defects (scrap and rework) | Defect rate | 6.62 % | Single extractor |
Observation units
- Oven Machine · Baking · Baseline