1Bibliographic record
- Authors
- Muhammad Ikbal Mawazin Qistan, Satriana Satriana, Juanda Juanda
- Year
- 2023
- Venue
- Jurnal Serambi Engineering
- Country
- Indonesia
- Segment
- Grain and oilseed milling
- Process family
- Milling, extraction and separation
- Study type
- Single case study
- Extraction scope
- Abstract only
- Size
- 1 plants · — lines · 1 machines
- Observation period
- —
- Data collection
- not_reported
- Intervention
Show the setting as described by the study
Salah satu tahapan proses dalam produksi inti sawit adalah proses pemecahan nut menghasilkan inti dan cangkang dengan menggunakan mesin ripple mill.
2Risk of bias
Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 8Moderate risk
| Item | Score |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described. | 2 / 2 |
| Is the observation period long enough and reported?Period not reported. | 0 / 2 |
| How were loss data collected?Interviews, estimates, or method not reported. | 0 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?No definition; metrics are reported as bare numbers. | 0 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?Only selected causes are reported and the total is unknown. | 0 / 2 |
| Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method. | 2 / 2 |
| Are the reported numbers internally consistent?Recomputed totals, shares and OEE factors agree with the reported values within 2 percentage points. | 2 / 2 |
| Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result. | 2 / 2 |
3Extracted data
Each datum with its classification and the verbatim quote that states it.
| Reported cause | Loss category | Metric | Value | Extraction |
|---|---|---|---|---|
—ripple millShow verbatim quote (abstract)nilai rata-rata dari availability ratio, performance ratio, quality ratio, dan nilai OEE adalah masing-masing 70,08%, 69,57%, 100%, dan 48,75% | none | OEE | 48.8 % | Both extractors agreed |
—ripple millShow verbatim quote (abstract)nilai rata-rata dari availability ratio, performance ratio, quality ratio, dan nilai OEE adalah masing-masing 70,08%, 69,57%, 100%, dan 48,75% | none | Quality | 100 % | Both extractors agreed |
—ripple millShow verbatim quote (abstract)nilai rata-rata dari availability ratio, performance ratio, quality ratio, dan nilai OEE adalah masing-masing 70,08%, 69,57%, 100%, dan 48,75% | none | Performance | 69.6 % | Both extractors agreed |
—ripple millShow verbatim quote (abstract)nilai rata-rata dari availability ratio, performance ratio, quality ratio, dan nilai OEE adalah masing-masing 70,08%, 69,57%, 100%, dan 48,75% | none | Availability | 70.1 % | Both extractors agreed |
Observation units
- Mesin Ripple Mill - Stasiun Kernel, PT X Jambi · Milling and grinding · Baseline

