Analysis of Total Productive Maintenance Using Overall Resource Effectiveness (ORE) Methods on Pellet Mill 3 Machine in PT. XYZ

Open source

1Bibliographic record

Authors
Tasya Az'zahra Puspita Wardhani, Endang Pudji Widjajati
Year
2023
Venue
IJIEM - Indonesian Journal of Industrial Engineering and Management
Country
Indonesia
Segment
Animal feed and pet food
Process family
Forming, baking and cooking
Study type
Single case study
Extraction scope
Full text
Size
1 plants · — lines · 1 machines
Observation period
365 days
Data collection
not_reported
Intervention
Show the setting as described by the study
Pellet Mill is a critical machine in producing animal feed in pellets and crumbles at PT XYZ.

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 14Low risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described.2 / 2
Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events).2 / 2
How were loss data collected?Manual logs or maintenance records with unknown completeness.1 / 2
Are OEE, loading time and the loss categories defined explicitly?Formulae or definitions are given for the reported metrics, including what counts as planned time.2 / 2
Does the loss breakdown account for the total loss it claims to explain?The reported causes or categories sum to at least 90% of the stated total, or an explicit "other" class closes the balance.2 / 2
Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method.2 / 2
Are the reported numbers internally consistent?Small inconsistencies (2 to 10 percentage points) or values that cannot be cross-checked.1 / 2
Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result.2 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
—Pellet Mill 3
Show verbatim quote (Section 4.1.G / Table 8)
the quality rate value of the pellet mill 3 machine shows a value of 100% which means that no defects or process deviations are found in the production results
noneQuality100 %Both extractors agreed
—Pellet Mill 3
Show verbatim quote (Table 6)
Average of Performance Efficiency 81,71%
nonePerformance81.7 %Both extractors agreed
—Pellet Mill 3
Show verbatim quote (Table 5)
Average of Availability of Manpower 100%
noneAvailability100 %Both extractors agreed
—Pellet Mill 3
Show verbatim quote (Table 4)
Average of Availability of Material 96,87%
noneAvailability96.9 %Both extractors agreed
—Pellet Mill 3
Show verbatim quote (Table 3)
Average of Changeover Efficiency 96,32%
noneAvailability96.3 %Both extractors agreed
—Pellet Mill 3
Show verbatim quote (Table 2)
Average of Availability of Facility 95,35%
noneAvailability95.4 %Both extractors agreed
—Pellet Mill 3
Show verbatim quote (Table 1)
Average of Readiness 98,22%
noneAvailability98.2 %Both extractors agreed
—Pellet Mill 3
Show verbatim quote (Abstract / Table 8)
the effectiveness value is 71.41%, below the Japan Institute of Plant Maintenance (JIPM) standard of 85%.
noneOEE71.4 %Both extractors agreed

Observation units

  • Pellet Mill 3 · Forming, moulding and depositing · Baseline