Analysis of Total Productive Maintenance Using Overall Resource Effectiveness (ORE) Methods on Pellet Mill 3 Machine in PT. XYZ
1Bibliographic record
- Authors
- Tasya Az'zahra Puspita Wardhani, Endang Pudji Widjajati
- Year
- 2023
- Venue
- IJIEM - Indonesian Journal of Industrial Engineering and Management
- Country
- Indonesia
- Segment
- Animal feed and pet food
- Process family
- Forming, baking and cooking
- Study type
- Single case study
- Extraction scope
- Full text
- Size
- 1 plants · — lines · 1 machines
- Observation period
- 365 days
- Data collection
- not_reported
- Intervention
Show the setting as described by the study
Pellet Mill is a critical machine in producing animal feed in pellets and crumbles at PT XYZ.
2Risk of bias
Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 14Low risk
| Item | Score |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described. | 2 / 2 |
| Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events). | 2 / 2 |
| How were loss data collected?Manual logs or maintenance records with unknown completeness. | 1 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?Formulae or definitions are given for the reported metrics, including what counts as planned time. | 2 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?The reported causes or categories sum to at least 90% of the stated total, or an explicit "other" class closes the balance. | 2 / 2 |
| Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method. | 2 / 2 |
| Are the reported numbers internally consistent?Small inconsistencies (2 to 10 percentage points) or values that cannot be cross-checked. | 1 / 2 |
| Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result. | 2 / 2 |
3Extracted data
Each datum with its classification and the verbatim quote that states it.
| Reported cause | Loss category | Metric | Value | Extraction |
|---|---|---|---|---|
—Pellet Mill 3Show verbatim quote (Section 4.1.G / Table 8)the quality rate value of the pellet mill 3 machine shows a value of 100% which means that no defects or process deviations are found in the production results | none | Quality | 100 % | Both extractors agreed |
—Pellet Mill 3Show verbatim quote (Table 6)Average of Performance Efficiency 81,71% | none | Performance | 81.7 % | Both extractors agreed |
—Pellet Mill 3Show verbatim quote (Table 5)Average of Availability of Manpower 100% | none | Availability | 100 % | Both extractors agreed |
—Pellet Mill 3Show verbatim quote (Table 4)Average of Availability of Material 96,87% | none | Availability | 96.9 % | Both extractors agreed |
—Pellet Mill 3Show verbatim quote (Table 3)Average of Changeover Efficiency 96,32% | none | Availability | 96.3 % | Both extractors agreed |
—Pellet Mill 3Show verbatim quote (Table 2)Average of Availability of Facility 95,35% | none | Availability | 95.4 % | Both extractors agreed |
—Pellet Mill 3Show verbatim quote (Table 1)Average of Readiness 98,22% | none | Availability | 98.2 % | Both extractors agreed |
—Pellet Mill 3Show verbatim quote (Abstract / Table 8)the effectiveness value is 71.41%, below the Japan Institute of Plant Maintenance (JIPM) standard of 85%. | none | OEE | 71.4 % | Both extractors agreed |
Observation units
- Pellet Mill 3 · Forming, moulding and depositing · Baseline