foratvise
Get Started
Included study

Enhancing Equipment Availability through Lean-TPM Integration: A Case Study of a Poultry Processing Plant in Peru

Open source

1Bibliographic record

Authors
Dorita Victoria Aguilar-Orbegoso, Yván Jesús García-López
Year
2025
Venue
International Conference on Industrial Engineering and Operations Management (IEOM)
Country
Peru
Segment
Meat, poultry and seafood
Process family
Slaughter, cutting and primary processing
Study type
Before/after intervention
Extraction scope
Full text
Size
1 plants · — lines · 1 machines
Observation period
365 days
Data collection
not_reported
Intervention
Show the setting as described by the study
The validation scenario was conducted in a case study of a poultry processing plant focused on improving its production line availability.

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 9Moderate risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described.2 / 2
Is the observation period long enough and reported?Period reported but shorter than 30 days, or only the number of shifts is given.1 / 2
How were loss data collected?Interviews, estimates, or method not reported.0 / 2
Are OEE, loading time and the loss categories defined explicitly?A standard definition is cited but its application is not shown.1 / 2
Does the loss breakdown account for the total loss it claims to explain?Only the top causes are reported and the unexplained remainder can be computed.1 / 2
Is there evidence of selective reporting of favourable results?Intervention study in which baseline and post-intervention periods differ in length or method.1 / 2
Are the reported numbers internally consistent?Small inconsistencies (2 to 10 percentage points) or values that cannot be cross-checked.1 / 2
Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result.2 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
Improper adjustment of fingersLincoln plucking machine
Show verbatim quote (Table 1)
Improper adjustment of fingers 74 10% 100%
Setup and adjustmentsShare of lost time10.0 %Adjudicated
Improper adjustment of fingersLincoln plucking machine
Show verbatim quote (Table 1)
Improper adjustment of fingers 74 10% 100%
Setup and adjustmentsLost time74.0 minAdjudicated
Accumulation of feathersLincoln plucking machine
Show verbatim quote (Table 1)
Accumulation of feathers 189 25.68% 90%
Idling and minor stops (micro-stops)Share of lost time25.7 %Both extractors agreed
Accumulation of feathersLincoln plucking machine
Show verbatim quote (Table 1)
Accumulation of feathers 189 25.68% 90%
Idling and minor stops (micro-stops)Lost time189 minBoth extractors agreed
Changes of fingersLincoln plucking machine
Show verbatim quote (Table 1)
Changes of fingers 473 64.27% 64%
Equipment failure (breakdowns)Share of lost time64.3 %Both extractors agreed
Changes of fingersLincoln plucking machine
Show verbatim quote (Table 1)
Changes of fingers 473 64.27% 64%
Equipment failure (breakdowns)Lost time473 minBoth extractors agreed
—
Show verbatim quote (Table 2)
Performance % 84.70% 95.00% 84.74% 0.05%
nonePerformance84.7 %Both extractors agreed
—
Show verbatim quote (Table 2)
Performance % 84.70% 95.00% 84.74% 0.05%
nonePerformance84.7 %Both extractors agreed
—
Show verbatim quote (Section 5 Results)
the most substantial improvement was observed in overall equipment effectiveness (OEE), which increased by 16.59%, rising from 58.16% to 67.81%.
noneOEE67.8 %Both extractors agreed
—
Show verbatim quote (Section 5 Results)
the most substantial improvement was observed in overall equipment effectiveness (OEE), which increased by 16.59%, rising from 58.16% to 67.81%.
noneOEE58.2 %Both extractors agreed
—
Show verbatim quote (Section 5 Results)
Additionally, quality improved by 3.11%, reaching 86.99% compared to the initial 84.37%.
noneQuality87.0 %Both extractors agreed
—
Show verbatim quote (Section 4.2 Initial Diagnosis)
The plant's availability rate of 86.13% fell below the industry standard of 95%, leading to an economic impact of 6,705,716 PEN per year, representing 8% of annual revenue.
noneAvailability86.1 %Both extractors agreed
—
Show verbatim quote (Section 5 Results)
Additionally, quality improved by 3.11%, reaching 86.99% compared to the initial 84.37%.
noneQuality84.4 %Both extractors agreed
—
Show verbatim quote (Section 4.3 Improvement in Availability)
After the implementation of the proposed solutions, the availability of the poultry processing plant increased by 6.81%, reaching a new value of 92%.
noneAvailability92.0 %Both extractors agreed
—
Show verbatim quote (Section 4.3 Identification of the Problem)
Quantitative data indicated that the availability of the process was 86.13%, with a total downtime of 2107 minutes throughout the year.
Not classifiable from the reportLost time2,107 minSingle extractor
—Lincoln plucking machine
Show verbatim quote (Section 4.3 Identification of the Problem)
the Lincoln plucking machine, which accounted for 34.93% of the total downtime, equivalent to 736 minutes in 2023.
Not classifiable from the reportLost time736 minSingle extractor
—Lincoln plucking machine
Show verbatim quote (Section 4.3 Identification of the Problem)
the Lincoln plucking machine, which accounted for 34.93% of the total downtime, equivalent to 736 minutes in 2023.
Not classifiable from the reportShare of lost time34.9 %Single extractor

Observation units

  • Lincoln plucking machine · Separation (centrifugation, filtration, membranes) · Baseline
  • Poultry processing plant · Whole line or unspecified equipment · After intervention
  • Poultry processing plant · Whole line or unspecified equipment · Baseline