Integrasi RCM Dan TPM Untuk Meningkatkan Keandalan Mesin Homogenizer

Open source

1Bibliographic record

Authors
Muhammad Ikhsanudin Basri, Rakay Edhiargo Toyosito, Lifia Citra Ramadhanti
Year
2026
Venue
UNISTEK
Country
Indonesia
Segment
Snacks, coffee, tea and other foods
Process family
Mixing and formulation
Study type
Before/after intervention
Extraction scope
Full text
Size
1 plants · 1 lines · 8 machines
Observation period
184 days
Data collection
maintenance_records
Intervention
Show the setting as described by the study
Mesin homogenizer merupakan salah satu peralatan kritis dalam proses produksi Non-Dairy Creamer karena berperan dalam menghasilkan emulsi yang homogen dan stabil.

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 12Moderate risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described.2 / 2
Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events).2 / 2
How were loss data collected?Manual logs or maintenance records with unknown completeness.1 / 2
Are OEE, loading time and the loss categories defined explicitly?A standard definition is cited but its application is not shown.1 / 2
Does the loss breakdown account for the total loss it claims to explain?The reported causes or categories sum to at least 90% of the stated total, or an explicit "other" class closes the balance.2 / 2
Is there evidence of selective reporting of favourable results?Intervention study in which baseline and post-intervention periods differ in length or method.1 / 2
Are the reported numbers internally consistent?Recomputed totals, shares and OEE factors agree with the reported values within 2 percentage points.2 / 2
Could conflicts of interest or the source of the data bias the result?Authors are employees of the plant or of an equipment/software vendor; no declaration.1 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
—Homogenizer
Show verbatim quote (Table 4)
MTTF 4.623,75 Menit
Equipment failure (breakdowns)Time between events4,624 menitBoth extractors agreed
—Homogenizer
Show verbatim quote (Table 4)
MTTR 83,63 Menit
Equipment failure (breakdowns)Mean event duration83.6 menitBoth extractors agreed
—Homogenizer
Show verbatim quote (Section 2.1)
mesin homogenizer menyumbang downtime sebesar 2.007 menit atau sekitar 69% dari total mechanical downtime yang terjadi pada lini produksi.
Equipment failure (breakdowns)Lost time2,007 menitBoth extractors agreed
—Homogenizer
Show verbatim quote (Table 1)
Homogenizer 2.007 24
Equipment failure (breakdowns)Number of events24.0 eventsBoth extractors agreed
Unstable pressurePressure System
Show verbatim quote (Table 2)
Pressure Tidak Stabil Mechanical 100 2
Equipment failure (breakdowns)Number of events2.00 eventsBoth extractors agreed
Unstable pressurePressure System
Show verbatim quote (Table 2)
Pressure Tidak Stabil Mechanical 100 2
Equipment failure (breakdowns)Lost time100 menitBoth extractors agreed
Flowmeter erratic readingFlowmeter
Show verbatim quote (Table 2)
Flowmeter Ngacak Instrument 233 2
Equipment failure (breakdowns)Number of events2.00 eventsBoth extractors agreed
Flowmeter erratic readingFlowmeter
Show verbatim quote (Table 2)
Flowmeter Ngacak Instrument 233 2
Equipment failure (breakdowns)Lost time233 menitBoth extractors agreed
Gasket plunger replacementGasket Plunger
Show verbatim quote (Table 2)
Ganti Gasket Plunger Mechanical 1.088 13
Equipment failure (breakdowns)Number of events13.0 eventsBoth extractors agreed
Gasket plunger replacementGasket Plunger
Show verbatim quote (Table 2)
Ganti Gasket Plunger Mechanical 1.088 13
Equipment failure (breakdowns)Lost time1,088 menitBoth extractors agreed
Plunger troublePlunger
Show verbatim quote (Table 2)
Trouble Plunger Mechanical 315 2
Equipment failure (breakdowns)Number of events2.00 eventsBoth extractors agreed
Plunger troublePlunger
Show verbatim quote (Table 2)
Trouble Plunger Mechanical 315 2
Equipment failure (breakdowns)Lost time315 menitBoth extractors agreed
Monoblock troubleMonoblock
Show verbatim quote (Table 2)
Trouble Monoblock Mechanical 46 1
Equipment failure (breakdowns)Number of events1.00 eventsBoth extractors agreed
Monoblock troubleMonoblock
Show verbatim quote (Table 2)
Trouble Monoblock Mechanical 46 1
Equipment failure (breakdowns)Lost time46.0 menitBoth extractors agreed
Flange leakFlange
Show verbatim quote (Table 2)
Flange Bocor Mechanical 225 4
Equipment failure (breakdowns)Number of events4.00 eventsBoth extractors agreed
Flange leakFlange
Show verbatim quote (Table 2)
Flange Bocor Mechanical 225 4
Equipment failure (breakdowns)Lost time225 menitBoth extractors agreed
—Homogenizer
Show verbatim quote (Section 2.1)
mesin homogenizer menyumbang downtime sebesar 2.007 menit atau sekitar 69% dari total mechanical downtime yang terjadi pada lini produksi.
Equipment failure (breakdowns)Share of lost time69.0 %Single extractor
Gasket plunger replacementGasket Plunger
Show verbatim quote (Section 3.2)
kerusakan paling dominan terjadi pada gasket plunger dengan kontribusi downtime sebesar 1.088 menit atau 54,21% dari total downtime homogenizer.
Equipment failure (breakdowns)Share of lost time54.2 %Single extractor
—Homogenizer
Show verbatim quote (Table 3)
Persentase Downtime 1,81%
Equipment failure (breakdowns)Share of planned time1.81 %Single extractor
—Homogenizer
Show verbatim quote (Table 12)
Total Downtime 2.007 Menit 610 Menit ↓ 69%
Equipment failure (breakdowns)Lost time610 menitSingle extractor
—Homogenizer
Show verbatim quote (Table 12)
Frekuensi Kerusakan 24 Kali 8 Kali ↓ 67%
Equipment failure (breakdowns)Number of events8.00 eventsSingle extractor
—Homogenizer
Show verbatim quote (Table 12)
MTTF 4.623,75 Menit 13.871,25 Menit ↑ 200%
Equipment failure (breakdowns)Time between events13,871 menitSingle extractor
—Homogenizer
Show verbatim quote (Table 12)
MTTR 83,63 Menit 76,25 Menit ↓ 8,8%
Equipment failure (breakdowns)Mean event duration76.3 menitSingle extractor
—Burner
Show verbatim quote (Table 1)
Burner 304 2
Equipment failure (breakdowns)Lost time304 menitSingle extractor
—Burner
Show verbatim quote (Table 1)
Burner 304 2
Equipment failure (breakdowns)Number of events2.00 eventsSingle extractor
—Nozzle
Show verbatim quote (Table 1)
Nozzle 181 1
Equipment failure (breakdowns)Lost time181 menitSingle extractor
—Nozzle
Show verbatim quote (Table 1)
Nozzle 181 1
Equipment failure (breakdowns)Number of events1.00 eventsSingle extractor
—Reception
Show verbatim quote (Table 1)
Reception 181 1
Equipment failure (breakdowns)Lost time181 menitSingle extractor
—Reception
Show verbatim quote (Table 1)
Reception 181 1
Equipment failure (breakdowns)Number of events1.00 eventsSingle extractor
—Exhaust Fan
Show verbatim quote (Table 1)
Exhaust Fan 168 1
Equipment failure (breakdowns)Lost time168 menitSingle extractor
—Exhaust Fan
Show verbatim quote (Table 1)
Exhaust Fan 168 1
Equipment failure (breakdowns)Number of events1.00 eventsSingle extractor
—Sifter
Show verbatim quote (Table 1)
Sifter 30 1
Equipment failure (breakdowns)Lost time30.0 menitSingle extractor
—Sifter
Show verbatim quote (Table 1)
Sifter 30 1
Equipment failure (breakdowns)Number of events1.00 eventsSingle extractor
—Inlet Fan
Show verbatim quote (Table 1)
Inlet Fan 23 1
Equipment failure (breakdowns)Lost time23.0 menitSingle extractor
—Inlet Fan
Show verbatim quote (Table 1)
Inlet Fan 23 1
Equipment failure (breakdowns)Number of events1.00 eventsSingle extractor
—Scanima
Show verbatim quote (Table 1)
Scanima 17 1
Equipment failure (breakdowns)Lost time17.0 menitSingle extractor
—Scanima
Show verbatim quote (Table 1)
Scanima 17 1
Equipment failure (breakdowns)Number of events1.00 eventsSingle extractor
—
Show verbatim quote (Section 1)
total downtime mesin mencapai 3.928 menit dengan persentase downtime sebesar 3,54% dari total waktu kerja.
Not classifiable from the reportLost time3,928 menitSingle extractor
—
Show verbatim quote (Section 1)
total downtime mesin mencapai 3.928 menit dengan persentase downtime sebesar 3,54% dari total waktu kerja.
Not classifiable from the reportShare of planned time3.54 %Single extractor
—
Show verbatim quote (Section 1)
mechanical downtime menjadi penyumbang terbesar dengan nilai 2.911 menit atau sekitar 74,11% dari keseluruhan downtime.
Equipment failure (breakdowns)Lost time2,911 menitSingle extractor
—
Show verbatim quote (Section 1)
mechanical downtime menjadi penyumbang terbesar dengan nilai 2.911 menit atau sekitar 74,11% dari keseluruhan downtime.
Equipment failure (breakdowns)Share of lost time74.1 %Single extractor
—
Show verbatim quote (Section 3.1)
total downtime yang terjadi mencapai 2.911 menit dengan frekuensi kerusakan sebanyak 32 kejadian.
Equipment failure (breakdowns)Number of events32.0 eventsSingle extractor

Observation units

  • Homogenizer · Homogenization · Baseline
  • Homogenizer · Homogenization · After intervention
  • Burner · Utilities (steam, compressed air, chilled water, power) · Baseline
  • Nozzle · Drying · Baseline
  • Reception · Whole line or unspecified equipment · Baseline
  • Exhaust Fan · Utilities (steam, compressed air, chilled water, power) · Baseline
  • Sifter · Separation (centrifugation, filtration, membranes) · Baseline
  • Inlet Fan · Utilities (steam, compressed air, chilled water, power) · Baseline
  • Scanima · Inspection and checkweighing · Baseline
  • All production machines (PT CRM) · Whole line or unspecified equipment · Baseline