Eingeschlossene Studie
Use of packing equipment efficiency as an estimate of the overall plant effectiveness and as a tool to improve financial results of a food-processing unit
1Bibliografische Angaben
- Autoren
- Jose Boaventura Rodrigues, Antonio Carlos Dantas Cabral
- Jahr
- 2017
- Publikationsorgan
- Brazilian journal of food technology/Brazilian Journal of Food Technology
- Land
- Brazil
- Segment
- Getreide- und Ölsaatenmüllerei
- Prozessfamilie
- Abfüll- und Verpackungslinie
- Studientyp
- Einzelfallstudie
- Extraktionsumfang
- Volltext
- Umfang
- 1 Werke · 1 Linien · — Maschinen
- Beobachtungszeitraum
- 88 Tage
- Datenerhebung
- manual_logs
- Intervention
Umfeld laut Studie anzeigen
a case study was conducted by collecting data from the packing unit along a four-month period in a soy processing plant located in Brazil.
2Verzerrungsrisiko
Bewertet nach dem Schema des Protokolls: 2 geringe Bedenken, 1 einige Bedenken, 0 hohe Bedenken.
Gesamtpunktzahl 12Mittleres Risiko
| Kriterium | Punkte |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product or sector is given but the equipment or process is only partly described. | 1 / 2 |
| Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events). | 2 / 2 |
| How were loss data collected?Manual logs or maintenance records with unknown completeness. | 1 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?Formulae or definitions are given for the reported metrics, including what counts as planned time. | 2 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?The reported causes or categories sum to at least 90% of the stated total, or an explicit "other" class closes the balance. | 2 / 2 |
| Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method. | 2 / 2 |
| Are the reported numbers internally consistent?Small inconsistencies (2 to 10 percentage points) or values that cannot be cross-checked. | 1 / 2 |
| Could conflicts of interest or the source of the data bias the result?Authors are employees of the plant or of an equipment/software vendor; no declaration. | 1 / 2 |
3Extrahierte Daten
Jeder Datenpunkt mit seiner Einordnung und dem wörtlichen Zitat, das ihn belegt.
| Berichtete Ursache | Verlustkategorie | Kennzahl | Wert | Extraktion |
|---|---|---|---|---|
automation failurespacking equipmentWörtliches Zitat anzeigen (Section 3.1, Figure 9)A deeper analysis of non-scheduled maintenance data (Figure 9) shows that major causes of packing equipment failure are related to: electrical failures (26%), unscheduled operational (26%) or mechanical (23%) adjustments, worn parts or equipment breakdown (13%) and automation failures (6%). | Anlagenausfall (Störungen) | Anteil an der Verlustzeit | 6,00 % | Beide Extraktionen übereinstimmend |
worn parts or equipment breakdownpacking equipmentWörtliches Zitat anzeigen (Section 3.1, Figure 9)A deeper analysis of non-scheduled maintenance data (Figure 9) shows that major causes of packing equipment failure are related to: electrical failures (26%), unscheduled operational (26%) or mechanical (23%) adjustments, worn parts or equipment breakdown (13%) and automation failures (6%). | Anlagenausfall (Störungen) | Anteil an der Verlustzeit | 13,0 % | Beide Extraktionen übereinstimmend |
mechanical adjustmentspacking equipmentWörtliches Zitat anzeigen (Section 3.1, Figure 9)A deeper analysis of non-scheduled maintenance data (Figure 9) shows that major causes of packing equipment failure are related to: electrical failures (26%), unscheduled operational (26%) or mechanical (23%) adjustments, worn parts or equipment breakdown (13%) and automation failures (6%). | Anlagenausfall (Störungen) | Anteil an der Verlustzeit | 23,0 % | Durch Schiedsentscheid |
unscheduled operational adjustmentspacking equipmentWörtliches Zitat anzeigen (Section 3.1, Figure 9)A deeper analysis of non-scheduled maintenance data (Figure 9) shows that major causes of packing equipment failure are related to: electrical failures (26%), unscheduled operational (26%) or mechanical (23%) adjustments, worn parts or equipment breakdown (13%) and automation failures (6%). | Anlagenausfall (Störungen) | Anteil an der Verlustzeit | 26,0 % | Durch Schiedsentscheid |
electrical failurespacking equipmentWörtliches Zitat anzeigen (Section 3.1, Figure 9)A deeper analysis of non-scheduled maintenance data (Figure 9) shows that major causes of packing equipment failure are related to: electrical failures (26%), unscheduled operational (26%) or mechanical (23%) adjustments, worn parts or equipment breakdown (13%) and automation failures (6%). | Anlagenausfall (Störungen) | Anteil an der Verlustzeit | 26,0 % | Beide Extraktionen übereinstimmend |
lack of product input to the packing line (upstream losses)packing lineWörtliches Zitat anzeigen (Section 3.1, Figure 8)Major Availability losses were categorized as: non-scheduled maintenance (29,010 min. - 58% of Availability losses); packaging failure (11,079 min. - 22%); lack of demand that are downstream losses (8,260 min. - 13%) and; lack of product input to the packing line (952 min. – 2%). | Organisatorische oder externe Stillstände (Material- oder Personalmangel, Ausfall der Versorgung) | Anteil an der Verlustzeit | 2,00 % | Durch Schiedsentscheid |
lack of product input to the packing line (upstream losses)packing lineWörtliches Zitat anzeigen (Section 3.1, Figure 8)Major Availability losses were categorized as: non-scheduled maintenance (29,010 min. - 58% of Availability losses); packaging failure (11,079 min. - 22%); lack of demand that are downstream losses (8,260 min. - 13%) and; lack of product input to the packing line (952 min. – 2%). | Organisatorische oder externe Stillstände (Material- oder Personalmangel, Ausfall der Versorgung) | Verlustzeit | 952 min | Durch Schiedsentscheid |
lack of demand (downstream losses)packing lineWörtliches Zitat anzeigen (Section 3.1, Figure 8)Major Availability losses were categorized as: non-scheduled maintenance (29,010 min. - 58% of Availability losses); packaging failure (11,079 min. - 22%); lack of demand that are downstream losses (8,260 min. - 13%) and; lack of product input to the packing line (952 min. – 2%). | Geplanter Stillstand (geplante Instandhaltung, Pausen, keine Nachfrage) | Anteil an der Verlustzeit | 13,0 % | Durch Schiedsentscheid |
lack of demand (downstream losses)packing lineWörtliches Zitat anzeigen (Section 3.1, Figure 8)Major Availability losses were categorized as: non-scheduled maintenance (29,010 min. - 58% of Availability losses); packaging failure (11,079 min. - 22%); lack of demand that are downstream losses (8,260 min. - 13%) and; lack of product input to the packing line (952 min. – 2%). | Geplanter Stillstand (geplante Instandhaltung, Pausen, keine Nachfrage) | Verlustzeit | 8.260 min | Durch Schiedsentscheid |
packaging failurepacking lineWörtliches Zitat anzeigen (Section 3.1, Figure 8)Major Availability losses were categorized as: non-scheduled maintenance (29,010 min. - 58% of Availability losses); packaging failure (11,079 min. - 22%); lack of demand that are downstream losses (8,260 min. - 13%) and; lack of product input to the packing line (952 min. – 2%). | Leerlauf und Kurzstillstände | Anteil an der Verlustzeit | 22,0 % | Durch Schiedsentscheid |
packaging failurepacking lineWörtliches Zitat anzeigen (Section 3.1, Figure 8)Major Availability losses were categorized as: non-scheduled maintenance (29,010 min. - 58% of Availability losses); packaging failure (11,079 min. - 22%); lack of demand that are downstream losses (8,260 min. - 13%) and; lack of product input to the packing line (952 min. – 2%). | Leerlauf und Kurzstillstände | Verlustzeit | 11.079 min | Durch Schiedsentscheid |
non-scheduled maintenancepacking lineWörtliches Zitat anzeigen (Section 3.1, Figure 8)Major Availability losses were categorized as: non-scheduled maintenance (29,010 min. - 58% of Availability losses); packaging failure (11,079 min. - 22%); lack of demand that are downstream losses (8,260 min. - 13%) and; lack of product input to the packing line (952 min. – 2%). | Anlagenausfall (Störungen) | Anteil an der Verlustzeit | 58,0 % | Beide Extraktionen übereinstimmend |
non-scheduled maintenancepacking lineWörtliches Zitat anzeigen (Section 3.1, Figure 8)Major Availability losses were categorized as: non-scheduled maintenance (29,010 min. - 58% of Availability losses); packaging failure (11,079 min. - 22%); lack of demand that are downstream losses (8,260 min. - 13%) and; lack of product input to the packing line (952 min. – 2%). | Anlagenausfall (Störungen) | Verlustzeit | 29.010 min | Beide Extraktionen übereinstimmend |
—packing lineWörtliches Zitat anzeigen (Section 3.1 Results and discussion)Based on the expected improvement (existing OEE of 53.9% versus OEE of 74.1% for the proposed scenario) it is possible to estimate the financial benefit possibly achieved after the improvement plan is implemented. | none | OEE | 53,9 % | Beide Extraktionen übereinstimmend |
Beobachtungseinheiten
- Packing line · Verpacken (Formen, Siegeln, Einschlagen, Kartonieren, Palettieren) · Ausgangslage