Analisis Produktivitas Mesin Filling Botol Dengan Metode Overal Equipment Effectiveness Dan Failure Mode And Effect Analysis

Quelle öffnen

1Bibliografische Angaben

Autoren
Angga Prasetya Aji, Widya Setiafindari
Jahr
2023
Publikationsorgan
Jurnal TRINISTIK Jurnal Teknik Industri Bisnis Digital dan Teknik Logistik
Land
Indonesia
Segment
Erfrischungsgetränke, abgefülltes Wasser und Säfte
Prozessfamilie
Abfüll- und Verpackungslinie
Studientyp
Einzelfallstudie
Extraktionsumfang
Nur Abstract
Umfang
1 Werke · 1 Linien · 1 Maschinen
Beobachtungszeitraum
365 Tage
Datenerhebung
not_reported
Intervention
Umfeld laut Studie anzeigen
PDAM Tirta Binangun is located in Secang, Sendangsari, Pengasih, Kulon Progo. The problem faced by the company is that the production of 600 ml bottled drinking water has a product failure of 16,038 bottles in one year, from April 2021 to March 2022.

2Verzerrungsrisiko

Bewertet nach dem Schema des Protokolls: 2 geringe Bedenken, 1 einige Bedenken, 0 hohe Bedenken.
Gesamtpunktzahl 8Mittleres Risiko
KriteriumPunkte
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product or sector is given but the equipment or process is only partly described.1 / 2
Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events).2 / 2
How were loss data collected?Interviews, estimates, or method not reported.0 / 2
Are OEE, loading time and the loss categories defined explicitly?No definition; metrics are reported as bare numbers.0 / 2
Does the loss breakdown account for the total loss it claims to explain?Only the top causes are reported and the unexplained remainder can be computed.1 / 2
Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method.2 / 2
Are the reported numbers internally consistent?Small inconsistencies (2 to 10 percentage points) or values that cannot be cross-checked.1 / 2
Could conflicts of interest or the source of the data bias the result?Authors are employees of the plant or of an equipment/software vendor; no declaration.1 / 2

3Extrahierte Daten

Jeder Datenpunkt mit seiner Einordnung und dem wörtlichen Zitat, das ihn belegt.
Berichtete UrsacheVerlustkategorieKennzahlWertExtraktion
—filling machine
Wörtliches Zitat anzeigen (Abstract)
The results of the OEE show that the average effectiveness of the filling machine is 87.48% so that the failure is still within tolerance and has a good value because it is greater than the OEE standard, which is 85%.
noneOEE87,5 %Beide Extraktionen übereinstimmend
Idle and Minor Stoppagefilling machine
Wörtliches Zitat anzeigen (Abstract)
Reduce Speed Losses with an average proportion of 3.82% and a relative frequency of 39.01%, Downtime Losses with an average of 2.27% and a relative frequency of 28.31%, Defect Losses with an average of 1.58% and a relative frequency of 15.59%, Idle and Minor Stoppage with an average of 1.55% and a relative frequency of 15.85%.
Leerlauf und KurzstillständeAnteil an den Verlustereignissen15,9 %Beide Extraktionen übereinstimmend
Defect Lossesfilling machine
Wörtliches Zitat anzeigen (Abstract)
Reduce Speed Losses with an average proportion of 3.82% and a relative frequency of 39.01%, Downtime Losses with an average of 2.27% and a relative frequency of 28.31%, Defect Losses with an average of 1.58% and a relative frequency of 15.59%, Idle and Minor Stoppage with an average of 1.55% and a relative frequency of 15.85%.
Prozessfehler (Ausschuss und Nacharbeit)Anteil an den Verlustereignissen15,6 %Beide Extraktionen übereinstimmend
Downtime Lossesfilling machine
Wörtliches Zitat anzeigen (Abstract)
Reduce Speed Losses with an average proportion of 3.82% and a relative frequency of 39.01%, Downtime Losses with an average of 2.27% and a relative frequency of 28.31%, Defect Losses with an average of 1.58% and a relative frequency of 15.59%, Idle and Minor Stoppage with an average of 1.55% and a relative frequency of 15.85%.
Aus dem Bericht nicht klassifizierbarAnteil an den Verlustereignissen28,3 %Durch Schiedsentscheid
Reduce Speed Lossesfilling machine
Wörtliches Zitat anzeigen (Abstract)
Reduce Speed Losses with an average proportion of 3.82% and a relative frequency of 39.01%, Downtime Losses with an average of 2.27% and a relative frequency of 28.31%, Defect Losses with an average of 1.58% and a relative frequency of 15.59%, Idle and Minor Stoppage with an average of 1.55% and a relative frequency of 15.85%.
Verringerte GeschwindigkeitAnteil an den Verlustereignissen39,0 %Beide Extraktionen übereinstimmend
Reduce Speed Lossesfilling machine
Wörtliches Zitat anzeigen (Abstract)
Reduce Speed Losses with an average proportion of 3.82% and a relative frequency of 39.01%, Downtime Losses with an average of 2.27% and a relative frequency of 28.31%, Defect Losses with an average of 1.58% and a relative frequency of 15.59%, Idle and Minor Stoppage with an average of 1.55% and a relative frequency of 15.85%.
Verringerte GeschwindigkeitAnteil an der geplanten Zeit3,82 %Einfache Extraktion
Downtime Lossesfilling machine
Wörtliches Zitat anzeigen (Abstract)
Reduce Speed Losses with an average proportion of 3.82% and a relative frequency of 39.01%, Downtime Losses with an average of 2.27% and a relative frequency of 28.31%, Defect Losses with an average of 1.58% and a relative frequency of 15.59%, Idle and Minor Stoppage with an average of 1.55% and a relative frequency of 15.85%.
Aus dem Bericht nicht klassifizierbarAnteil an der geplanten Zeit2,27 %Einfache Extraktion
Defect Lossesfilling machine
Wörtliches Zitat anzeigen (Abstract)
Reduce Speed Losses with an average proportion of 3.82% and a relative frequency of 39.01%, Downtime Losses with an average of 2.27% and a relative frequency of 28.31%, Defect Losses with an average of 1.58% and a relative frequency of 15.59%, Idle and Minor Stoppage with an average of 1.55% and a relative frequency of 15.85%.
Prozessfehler (Ausschuss und Nacharbeit)Anteil an der geplanten Zeit1,58 %Einfache Extraktion
Idle and Minor Stoppagefilling machine
Wörtliches Zitat anzeigen (Abstract)
Reduce Speed Losses with an average proportion of 3.82% and a relative frequency of 39.01%, Downtime Losses with an average of 2.27% and a relative frequency of 28.31%, Defect Losses with an average of 1.58% and a relative frequency of 15.59%, Idle and Minor Stoppage with an average of 1.55% and a relative frequency of 15.85%.
Leerlauf und KurzstillständeAnteil an der geplanten Zeit1,55 %Einfache Extraktion
—
Wörtliches Zitat anzeigen (Abstract)
Reduce Speed ​​Losses with an average proportion of 3.82%
Verringerte GeschwindigkeitAnteil an der Verlustzeit3,82 %Einfache Extraktion
—
Wörtliches Zitat anzeigen (Abstract)
Downtime Losses with an average of 2.27%
Anlagenausfall (Störungen)Anteil an der Verlustzeit2,27 %Einfache Extraktion
—
Wörtliches Zitat anzeigen (Abstract)
Defect Losses with an average of 1.58%
Prozessfehler (Ausschuss und Nacharbeit)Anteil an der Verlustzeit1,58 %Einfache Extraktion
—
Wörtliches Zitat anzeigen (Abstract)
Idle and Minor Stoppage with an average of 1.55%
Leerlauf und KurzstillständeAnteil an der Verlustzeit1,55 %Einfache Extraktion
—
Wörtliches Zitat anzeigen (Abstract)
the production of 600 ml bottled drinking water has a product failure of 16,038 bottles in one year, from April 2021 to March 2022
Prozessfehler (Ausschuss und Nacharbeit)Anzahl der Ereignisse16.038 bottlesEinfache Extraktion

Beobachtungseinheiten

  • Filling machine · Abfüllen · Ausgangslage