Waste Management and Operational Efficiency Improvement in Cake and Pastry Factory Through Adapting DMAIC Methodology

Quelle öffnen

1Bibliografische Angaben

Autoren
Kaouther Ghacham, Shoug Ghanem Alshawi, Raghad Muhammed Aljaloud, Malath Abdulkarim Alrawdhan, Munerah Saleh Alrudhyan, Lial Hamad Almari
Jahr
2026
Publikationsorgan
International Conference on Industrial Engineering and Operations Management (IEOM)
Land
Saudi Arabia
Segment
Backwaren und Teigwaren
Prozessfamilie
Formen, Backen und Garen
Studientyp
Vorher-nachher-Intervention
Extraktionsumfang
Volltext
Umfang
1 Werke · 3 Linien · 9 Maschinen
Beobachtungszeitraum
300 Tage
Datenerhebung
manual_logs
Intervention
Umfeld laut Studie anzeigen
This study focuses on reducing waste and enhancing operations in a bun production line within a leading bakery manufacturer that has over 40 years of experience in the fast-food and baking industry and is ranked among the top 50 most valuable brands in Saudi Arabia.

2Verzerrungsrisiko

Bewertet nach dem Schema des Protokolls: 2 geringe Bedenken, 1 einige Bedenken, 0 hohe Bedenken.
Gesamtpunktzahl 12Mittleres Risiko
KriteriumPunkte
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described.2 / 2
Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events).2 / 2
How were loss data collected?Manual logs or maintenance records with unknown completeness.1 / 2
Are OEE, loading time and the loss categories defined explicitly?No definition; metrics are reported as bare numbers.0 / 2
Does the loss breakdown account for the total loss it claims to explain?The reported causes or categories sum to at least 90% of the stated total, or an explicit "other" class closes the balance.2 / 2
Is there evidence of selective reporting of favourable results?Intervention study in which baseline and post-intervention periods differ in length or method.1 / 2
Are the reported numbers internally consistent?Recomputed totals, shares and OEE factors agree with the reported values within 2 percentage points.2 / 2
Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result.2 / 2

3Extrahierte Daten

Jeder Datenpunkt mit seiner Einordnung und dem wörtlichen Zitat, das ihn belegt.
Berichtete UrsacheVerlustkategorieKennzahlWertExtraktion
time waste
Wörtliches Zitat anzeigen (Section 5.2.3 Solutions Execution)
Implementation led to a 13% reduction in food waste, from 1.13% to 0.983%, 5% increase in OEE, from 52.6% to 55.4%, and a 31.6% reduction in time waste, dropping from 12.8% to 8.76%, successfully meeting the project objectives.
Aus dem Bericht nicht klassifizierbarAnteil an der geplanten Zeit8,76 %Beide Extraktionen übereinstimmend
—
Wörtliches Zitat anzeigen (Section 5.2.3 Solutions Execution)
Implementation led to a 13% reduction in food waste, from 1.13% to 0.983%, 5% increase in OEE, from 52.6% to 55.4%, and a 31.6% reduction in time waste, dropping from 12.8% to 8.76%, successfully meeting the project objectives.
noneOEE55,4 %Beide Extraktionen übereinstimmend
DividerDivider
Wörtliches Zitat anzeigen (Section 5.1.2 Time Waste / Figure 4)
Divider exhibits the highest probability of failure in the upcoming month, indicated by the most significant number of recorded breakdowns (30 incidents). The high failure frequency combined with moderate repair time (MTTR = 42.1 minutes).
Anlagenausfall (Störungen)Mittlere Ereignisdauer42,1 minBeide Extraktionen übereinstimmend
DividerDivider
Wörtliches Zitat anzeigen (Section 5.1.2 Time Waste / Figure 4)
Divider exhibits the highest probability of failure in the upcoming month, indicated by the most significant number of recorded breakdowns (30 incidents). The high failure frequency combined with moderate repair time (MTTR = 42.1 minutes).
Anlagenausfall (Störungen)Anzahl der Ereignisse30,0 eventsBeide Extraktionen übereinstimmend
ProoferProofer
Wörtliches Zitat anzeigen (Section 5.1.2 Time Waste / Figure 4)
Proofer, with a recorded 27 failures, has the longest average MTTR (121.22) and reliability at only 4.25%, underscoring its substantial impact on unplanned downtime.
Anlagenausfall (Störungen)Mittlere Ereignisdauer121 minBeide Extraktionen übereinstimmend
prooferProofer
Wörtliches Zitat anzeigen (Figure 2 / Section 4.2)
Analysis of breakdown sources in Figure 2 showed that the proofer was the most critical contributor with 55 hours lost across 28 incidents, followed by power interruption during the Eid al-Fitr season.
Anlagenausfall (Störungen)Anzahl der Ereignisse28,0 eventsBeide Extraktionen übereinstimmend
prooferProofer
Wörtliches Zitat anzeigen (Figure 2 / Section 4.2)
Analysis of breakdown sources in Figure 2 showed that the proofer was the most critical contributor with 55 hours lost across 28 incidents, followed by power interruption during the Eid al-Fitr season.
Anlagenausfall (Störungen)Verlustzeit55,0 hBeide Extraktionen übereinstimmend
Power Interruption
Wörtliches Zitat anzeigen (Section 5.1.2 Time Waste)
The Power Interruption category only happened twice; it had a high MTTR of 913.5 minutes, which brought the reliability down to 79.22%.
Organisatorische oder externe Stillstände (Material- oder Personalmangel, Ausfall der Versorgung)Mittlere Ereignisdauer914 minBeide Extraktionen übereinstimmend
breakdowns
Wörtliches Zitat anzeigen (Section 4.2 Measure Phase)
Over the course of ten months in 2024, 187 breakdowns resulted in 204.75 hours of downtime (3.032% of production time), an acceptable rate that requires ongoing monitoring, particularly for trends that persist.
Anlagenausfall (Störungen)Anteil an der geplanten Zeit3,03 %Beide Extraktionen übereinstimmend
breakdowns
Wörtliches Zitat anzeigen (Section 4.2 Measure Phase)
Over the course of ten months in 2024, 187 breakdowns resulted in 204.75 hours of downtime (3.032% of production time), an acceptable rate that requires ongoing monitoring, particularly for trends that persist.
Anlagenausfall (Störungen)Verlustzeit205 hBeide Extraktionen übereinstimmend
breakdowns
Wörtliches Zitat anzeigen (Section 4.2 Measure Phase)
Over the course of ten months in 2024, 187 breakdowns resulted in 204.75 hours of downtime (3.032% of production time), an acceptable rate that requires ongoing monitoring, particularly for trends that persist.
Anlagenausfall (Störungen)Anzahl der Ereignisse187 eventsBeide Extraktionen übereinstimmend
—
Wörtliches Zitat anzeigen (Section 4.2 Measure Phase)
The 2024 performance yielded a 98.55% yield with an 82% automation level, but moderate technology utilization was observed, indicating untapped potential and weak process control that require further investigation.
noneAusbeute98,6 %Beide Extraktionen übereinstimmend
—
Wörtliches Zitat anzeigen (Section 5.1.4)
Results showed an Availability of 82.41%, a Performance of 87%, and a Quality rate of 68.18%, leading to an overall OEE of 48.64% and indicating potential for improvement, as world-class OEE values typically exceed 85%.
noneOEE48,6 %Beide Extraktionen übereinstimmend
—
Wörtliches Zitat anzeigen (Section 5.1.4)
Results showed an Availability of 82.41%, a Performance of 87%, and a Quality rate of 68.18%, leading to an overall OEE of 48.64% and indicating potential for improvement, as world-class OEE values typically exceed 85%.
noneQualität68,2 %Beide Extraktionen übereinstimmend
—
Wörtliches Zitat anzeigen (Section 5.1.4)
Results showed an Availability of 82.41%, a Performance of 87%, and a Quality rate of 68.18%, leading to an overall OEE of 48.64% and indicating potential for improvement, as world-class OEE values typically exceed 85%.
noneLeistung87,0 %Beide Extraktionen übereinstimmend
—
Wörtliches Zitat anzeigen (Section 5.1.4)
Results showed an Availability of 82.41%, a Performance of 87%, and a Quality rate of 68.18%, leading to an overall OEE of 48.64% and indicating potential for improvement, as world-class OEE values typically exceed 85%.
noneVerfügbarkeit82,4 %Beide Extraktionen übereinstimmend
breakdown time and changeover time
Wörtliches Zitat anzeigen (Section 4.2 Measure Phase)
The waste of breakdown time and changeover time together accounted for 12.8% of production time.
Aus dem Bericht nicht klassifizierbarAnteil an der geplanten Zeit12,8 %Beide Extraktionen übereinstimmend
changeover time
Wörtliches Zitat anzeigen (Section 4.2 Measure Phase)
Changeover activities during January 2025 consumed 66.63 hours, which accounted for 9.77% of total production time, a relatively high percentage attributed to the product variety.
Rüsten und EinstellenAnteil an der geplanten Zeit9,77 %Beide Extraktionen übereinstimmend
changeover time
Wörtliches Zitat anzeigen (Section 4.2 Measure Phase)
Changeover activities during January 2025 consumed 66.63 hours, which accounted for 9.77% of total production time, a relatively high percentage attributed to the product variety.
Rüsten und EinstellenVerlustzeit66,6 hBeide Extraktionen übereinstimmend
—
Wörtliches Zitat anzeigen (Section 4.1 Define Phase)
improving Overall Equipment Effectiveness from its current level of 48% to more than 55% is crucial for enhancing productivity and achieving sustainability
noneOEE48,0 %Einfache Extraktion
total food waste
Wörtliches Zitat anzeigen (Section 4.2 Measure Phase)
total waste increased from 85,252 kg (0.42%) in 2022 to 286,723.99 kg (1.48%) in 2024, representing a 236% increase, while downtime increased from 106.26 hours to 244.17 hours, despite production levels remaining relatively stable at around 20 million units.
Aus dem Bericht nicht klassifizierbarFehlerquote0,420 %Einfache Extraktion
total food waste
Wörtliches Zitat anzeigen (Section 4.2 Measure Phase)
total waste increased from 85,252 kg (0.42%) in 2022 to 286,723.99 kg (1.48%) in 2024, representing a 236% increase, while downtime increased from 106.26 hours to 244.17 hours, despite production levels remaining relatively stable at around 20 million units.
Aus dem Bericht nicht klassifizierbarFehlerquote1,48 %Einfache Extraktion
total food waste
Wörtliches Zitat anzeigen (Section 4.2 Measure Phase)
total waste increased from 85,252 kg (0.42%) in 2022 to 286,723.99 kg (1.48%) in 2024, representing a 236% increase, while downtime increased from 106.26 hours to 244.17 hours, despite production levels remaining relatively stable at around 20 million units.
Aus dem Bericht nicht klassifizierbarFehlerquote85.252 kgEinfache Extraktion
total food waste
Wörtliches Zitat anzeigen (Section 4.2 Measure Phase)
Total food waste in the bun production line was 286,723.99 kg in 2024, representing approximately 1.5% of total production.
Aus dem Bericht nicht klassifizierbarFehlerquote286.724 kgEinfache Extraktion
total food waste
Wörtliches Zitat anzeigen (Section 4.2 Measure Phase)
Total food waste in the bun production line was 286,723.99 kg in 2024, representing approximately 1.5% of total production.
Aus dem Bericht nicht klassifizierbarFehlerquote1,50 %Einfache Extraktion
downtime
Wörtliches Zitat anzeigen (Section 4.2 Measure Phase)
total waste increased from 85,252 kg (0.42%) in 2022 to 286,723.99 kg (1.48%) in 2024, representing a 236% increase, while downtime increased from 106.26 hours to 244.17 hours, despite production levels remaining relatively stable at around 20 million units.
Aus dem Bericht nicht klassifizierbarVerlustzeit106 hEinfache Extraktion
downtime
Wörtliches Zitat anzeigen (Section 4.2 Measure Phase)
total waste increased from 85,252 kg (0.42%) in 2022 to 286,723.99 kg (1.48%) in 2024, representing a 236% increase, while downtime increased from 106.26 hours to 244.17 hours, despite production levels remaining relatively stable at around 20 million units.
Aus dem Bericht nicht klassifizierbarVerlustzeit244 hEinfache Extraktion
total food waste
Wörtliches Zitat anzeigen (Section 4.2 Measure Phase)
Over the course of ten months in 2024, the total food waste amounted to 182,539 kg.
Aus dem Bericht nicht klassifizierbarFehlerquote182.539 kgEinfache Extraktion
production waste
Wörtliches Zitat anzeigen (Section 4.2 Measure Phase)
It is categorized into three primary sources: production waste at 37.7%, breakdown waste at 61.7%, and R&D waste at 0.6%.
Prozessfehler (Ausschuss und Nacharbeit)Fehlerquote37,7 %Einfache Extraktion
breakdown waste
Wörtliches Zitat anzeigen (Section 4.2 Measure Phase)
It is categorized into three primary sources: production waste at 37.7%, breakdown waste at 61.7%, and R&D waste at 0.6%.
Anlagenausfall (Störungen)Fehlerquote61,7 %Einfache Extraktion
R&D waste
Wörtliches Zitat anzeigen (Section 4.2 Measure Phase)
It is categorized into three primary sources: production waste at 37.7%, breakdown waste at 61.7%, and R&D waste at 0.6%.
Aus dem Bericht nicht klassifizierbarFehlerquote0,600 %Einfache Extraktion
R&D waste
Wörtliches Zitat anzeigen (Section 4.2 Measure Phase)
R&D waste, though minor at 1,158.98 kg in January 2024, represented 6.55% of experimental activity waste in the month.
Aus dem Bericht nicht klassifizierbarFehlerquote1.159 kgEinfache Extraktion
R&D waste
Wörtliches Zitat anzeigen (Section 4.2 Measure Phase)
R&D waste, though minor at 1,158.98 kg in January 2024, represented 6.55% of experimental activity waste in the month.
Aus dem Bericht nicht klassifizierbarAnteil an der Verlustzeit6,55 %Einfache Extraktion
non-productive activities
Wörtliches Zitat anzeigen (Section 4.2 Measure Phase)
Based on January 2025 performance, 86.5% of planned production time was used effectively, while 13.5% was lost to non-productive activities, including setup, changeover, machine downtime, and maintenance.
Aus dem Bericht nicht klassifizierbarAnteil an der geplanten Zeit13,5 %Einfache Extraktion
breakdown events
Wörtliches Zitat anzeigen (Figure 5 / Section 5.1.2)
Analysis of 200 breakdown events by shift (Day: 6 AM - 6 PM, Night: 6 PM - 6 AM), Figure 5 showed a higher concentration of incidents during the night shift, particularly in the late evening and early morning hours.
Anlagenausfall (Störungen)Anzahl der Ereignisse200 eventsEinfache Extraktion
depanning failuresdepanner
Wörtliches Zitat anzeigen (Section 5.1.1 Food Waste)
The depanning failures, representing approximately 46.5% of production waste, were identified as the most significant contribution.
Prozessfehler (Ausschuss und Nacharbeit)Fehlerquote46,5 %Einfache Extraktion
proofing and baking deviations
Wörtliches Zitat anzeigen (Section 5.1.1 Food Waste)
Proofing and baking deviations, together accounting for 27% of production waste, were primarily linked to equipment malfunctions in the proofer and oven discussed earlier.
Prozessfehler (Ausschuss und Nacharbeit)Fehlerquote27,0 %Einfache Extraktion
ingredient mixing errors
Wörtliches Zitat anzeigen (Section 5.1.1 Food Waste)
Ingredient mixing errors (12.5%) were another source of loss, due to manual weighing and human variability.
Prozessfehler (Ausschuss und Nacharbeit)Fehlerquote12,5 %Einfache Extraktion
topping and panning failures
Wörtliches Zitat anzeigen (Section 5.1.1 Food Waste)
Similarly, topping and panning failures (13.9% combined) occurred when dough balls were misaligned in pans or when glazing and sesame seeds were applied unsuccessfully.
Prozessfehler (Ausschuss und Nacharbeit)Fehlerquote13,9 %Einfache Extraktion
Depannerdepanner
Wörtliches Zitat anzeigen (Section 5.2 Improve Phase)
Analysis showed that the Imprinter caused 53% of breakdown-related waste (32.7% of total), followed by the Depanner at 17.4% and Ingredient Mixing at 12.9%.
Prozessfehler (Ausschuss und Nacharbeit)Fehlerquote17,4 %Einfache Extraktion
Ingredient Mixing
Wörtliches Zitat anzeigen (Section 5.2 Improve Phase)
Analysis showed that the Imprinter caused 53% of breakdown-related waste (32.7% of total), followed by the Depanner at 17.4% and Ingredient Mixing at 12.9%.
Prozessfehler (Ausschuss und Nacharbeit)Fehlerquote12,9 %Einfache Extraktion
ImprinterImprinter
Wörtliches Zitat anzeigen (Figure 1 / Section 4.2)
Pareto analysis (Figure 1) identified the imprinter machine as having the most significant contribution at 59,692 kg and requiring the highest level of priority for corrective action.
Anlagenausfall (Störungen)Fehlerquote59.692 kgEinfache Extraktion
ImprinterImprinter
Wörtliches Zitat anzeigen (Section 5.1.1 Food Waste)
The earlier Pareto chart shown in Figure 1 identified the imprinter machine as the most critical source, contributing 53% of breakdown waste and 32.7% of total food waste.
Anlagenausfall (Störungen)Fehlerquote53,0 %Einfache Extraktion
ImprinterImprinter
Wörtliches Zitat anzeigen (Section 5.1.1 Food Waste)
The earlier Pareto chart shown in Figure 1 identified the imprinter machine as the most critical source, contributing 53% of breakdown waste and 32.7% of total food waste.
Anlagenausfall (Störungen)Fehlerquote32,7 %Einfache Extraktion
ProoferProofer
Wörtliches Zitat anzeigen (Section 5.1.1 Food Waste)
The proof was identified as the second-largest contributor to breakdown waste, generating 14,820 kg of waste due to repeated failures in its endless drive system.
Anlagenausfall (Störungen)Fehlerquote14.820 kgEinfache Extraktion
ProoferProofer
Wörtliches Zitat anzeigen (Section 5.1.2 Time Waste / Figure 4)
Proofer, with a recorded 27 failures, has the longest average MTTR (121.22) and reliability at only 4.25%, underscoring its substantial impact on unplanned downtime.
Anlagenausfall (Störungen)Anzahl der Ereignisse27,0 eventsEinfache Extraktion
ovenOven
Wörtliches Zitat anzeigen (Section 5.1.1 Food Waste)
Next, the oven, with 7,392 kg of waste, experienced frequent jamming and gas supply fluctuations, resulting in uneven baking and temperature deviations.
Anlagenausfall (Störungen)Fehlerquote7.392 kgEinfache Extraktion
food waste
Wörtliches Zitat anzeigen (Section 5.2.3 Solutions Execution)
Implementation resulted in a reduction of 24.8% in food waste, from 1.5% to 1.13%, and a 7.11% increase in OEE, from 48% to 52.6%.
Aus dem Bericht nicht klassifizierbarFehlerquote1,13 %Einfache Extraktion
—
Wörtliches Zitat anzeigen (Section 5.2.3 Solutions Execution)
Implementation resulted in a reduction of 24.8% in food waste, from 1.5% to 1.13%, and a 7.11% increase in OEE, from 48% to 52.6%.
noneOEE52,6 %Einfache Extraktion
food waste
Wörtliches Zitat anzeigen (Section 5.2.3 Solutions Execution)
Implementation led to a 13% reduction in food waste, from 1.13% to 0.983%, 5% increase in OEE, from 52.6% to 55.4%, and a 31.6% reduction in time waste, dropping from 12.8% to 8.76%, successfully meeting the project objectives.
Aus dem Bericht nicht klassifizierbarFehlerquote0,983 %Einfache Extraktion
—
Wörtliches Zitat anzeigen (Section 4.2)
Total food waste in the bun production line was 286,723.99 kg in 2024, representing approximately 1.5% of total production.
Prozessfehler (Ausschuss und Nacharbeit)Anteil an der geplanten Zeit1,50 %Einfache Extraktion
—
Wörtliches Zitat anzeigen (Section 4.2)
It is categorized into three primary sources: production waste at 37.7%, breakdown waste at 61.7%, and R&D waste at 0.6%.
Anlagenausfall (Störungen)Anteil an der Verlustzeit61,7 %Einfache Extraktion
—
Wörtliches Zitat anzeigen (Section 4.2)
It is categorized into three primary sources: production waste at 37.7%, breakdown waste at 61.7%, and R&D waste at 0.6%.
Prozessfehler (Ausschuss und Nacharbeit)Anteil an der Verlustzeit37,7 %Einfache Extraktion
imprinter machineimprinter
Wörtliches Zitat anzeigen (Section 4.2)
Pareto analysis (Figure 1) identified the imprinter machine as having the most significant contribution at 59,692 kg and requiring the highest level of priority for corrective action.
Anlagenausfall (Störungen)Verlustzeit59.692 kgEinfache Extraktion
proofer endless drive system failuresproofer
Wörtliches Zitat anzeigen (Section 5.1.1)
The proof was identified as the second-largest contributor to breakdown waste, generating 14,820 kg of waste due to repeated failures in its endless drive system.
Anlagenausfall (Störungen)Verlustzeit14.820 kgEinfache Extraktion
oven jamming and gas supply fluctuationsoven
Wörtliches Zitat anzeigen (Section 5.1.1)
Next, the oven, with 7,392 kg of waste, experienced frequent jamming and gas supply fluctuations, resulting in uneven baking and temperature deviations.
Anlagenausfall (Störungen)Verlustzeit7.392 kgEinfache Extraktion
depanning failuresdepanner
Wörtliches Zitat anzeigen (Section 5.1.1)
The depanning failures, representing approximately 46.5% of production waste, were identified as the most significant contribution.
Prozessfehler (Ausschuss und Nacharbeit)Anteil an der Verlustzeit46,5 %Einfache Extraktion
proofing and baking deviationsproofer, oven
Wörtliches Zitat anzeigen (Section 5.1.1)
Proofing and baking deviations, together accounting for 27% of production waste, were primarily linked to equipment malfunctions in the proofer and oven
Prozessfehler (Ausschuss und Nacharbeit)Anteil an der Verlustzeit27,0 %Einfache Extraktion
ingredient mixing errors
Wörtliches Zitat anzeigen (Section 5.1.1)
Ingredient mixing errors (12.5%) were another source of loss, due to manual weighing and human variability.
Prozessfehler (Ausschuss und Nacharbeit)Anteil an der Verlustzeit12,5 %Einfache Extraktion
panning and topping failurespanner
Wörtliches Zitat anzeigen (Section 5.1.1)
Similarly, topping and panning failures (13.9% combined) occurred when dough balls were misaligned in pans or when glazing and sesame seeds were applied unsuccessfully.
Prozessfehler (Ausschuss und Nacharbeit)Anteil an der Verlustzeit13,9 %Einfache Extraktion
—
Wörtliches Zitat anzeigen (Section 5.2.3)
In Phase 2, from April to May 2025, similar product scheduling was implemented, along with preventive maintenance and the standardization of color-coded measuring tools. Implementation led to a 13% reduction in food waste, from 1.13% to 0.983%
Prozessfehler (Ausschuss und Nacharbeit)Anteil an der geplanten Zeit0,983 %Einfache Extraktion

Beobachtungseinheiten

  • Bun production line (Phase 2) · Gesamte Linie oder nicht spezifizierte Anlage · Nach der Intervention
  • Divider · Formen, Gießen und Dosieren · Ausgangslage
  • Proofer · Fermentation · Ausgangslage
  • Bun production line · Gesamte Linie oder nicht spezifizierte Anlage · Ausgangslage
  • Imprinter · Formen, Gießen und Dosieren · Ausgangslage
  • Oven · Backen · Ausgangslage
  • Bun production line (Phase 1) · Gesamte Linie oder nicht spezifizierte Anlage · Nach der Intervention
  • Bun Production Line · Gesamte Linie oder nicht spezifizierte Anlage · Nach der Intervention