Eingeschlossene Studie
Waste Management and Operational Efficiency Improvement in Cake and Pastry Factory Through Adapting DMAIC Methodology
1Bibliografische Angaben
- Autoren
- Kaouther Ghacham, Shoug Ghanem Alshawi, Raghad Muhammed Aljaloud, Malath Abdulkarim Alrawdhan, Munerah Saleh Alrudhyan, Lial Hamad Almari
- Jahr
- 2026
- Publikationsorgan
- International Conference on Industrial Engineering and Operations Management (IEOM)
- Land
- Saudi Arabia
- Segment
- Backwaren und Teigwaren
- Prozessfamilie
- Formen, Backen und Garen
- Studientyp
- Vorher-nachher-Intervention
- Extraktionsumfang
- Volltext
- Umfang
- 1 Werke · 3 Linien · 9 Maschinen
- Beobachtungszeitraum
- 300 Tage
- Datenerhebung
- manual_logs
- Intervention
Umfeld laut Studie anzeigen
This study focuses on reducing waste and enhancing operations in a bun production line within a leading bakery manufacturer that has over 40 years of experience in the fast-food and baking industry and is ranked among the top 50 most valuable brands in Saudi Arabia.
2Verzerrungsrisiko
Bewertet nach dem Schema des Protokolls: 2 geringe Bedenken, 1 einige Bedenken, 0 hohe Bedenken.
Gesamtpunktzahl 12Mittleres Risiko
| Kriterium | Punkte |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described. | 2 / 2 |
| Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events). | 2 / 2 |
| How were loss data collected?Manual logs or maintenance records with unknown completeness. | 1 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?No definition; metrics are reported as bare numbers. | 0 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?The reported causes or categories sum to at least 90% of the stated total, or an explicit "other" class closes the balance. | 2 / 2 |
| Is there evidence of selective reporting of favourable results?Intervention study in which baseline and post-intervention periods differ in length or method. | 1 / 2 |
| Are the reported numbers internally consistent?Recomputed totals, shares and OEE factors agree with the reported values within 2 percentage points. | 2 / 2 |
| Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result. | 2 / 2 |
3Extrahierte Daten
Jeder Datenpunkt mit seiner Einordnung und dem wörtlichen Zitat, das ihn belegt.
| Berichtete Ursache | Verlustkategorie | Kennzahl | Wert | Extraktion |
|---|---|---|---|---|
time wasteWörtliches Zitat anzeigen (Section 5.2.3 Solutions Execution)Implementation led to a 13% reduction in food waste, from 1.13% to 0.983%, 5% increase in OEE, from 52.6% to 55.4%, and a 31.6% reduction in time waste, dropping from 12.8% to 8.76%, successfully meeting the project objectives. | Aus dem Bericht nicht klassifizierbar | Anteil an der geplanten Zeit | 8,76 % | Beide Extraktionen übereinstimmend |
—Wörtliches Zitat anzeigen (Section 5.2.3 Solutions Execution)Implementation led to a 13% reduction in food waste, from 1.13% to 0.983%, 5% increase in OEE, from 52.6% to 55.4%, and a 31.6% reduction in time waste, dropping from 12.8% to 8.76%, successfully meeting the project objectives. | none | OEE | 55,4 % | Beide Extraktionen übereinstimmend |
DividerDividerWörtliches Zitat anzeigen (Section 5.1.2 Time Waste / Figure 4)Divider exhibits the highest probability of failure in the upcoming month, indicated by the most significant number of recorded breakdowns (30 incidents). The high failure frequency combined with moderate repair time (MTTR = 42.1 minutes). | Anlagenausfall (Störungen) | Mittlere Ereignisdauer | 42,1 min | Beide Extraktionen übereinstimmend |
DividerDividerWörtliches Zitat anzeigen (Section 5.1.2 Time Waste / Figure 4)Divider exhibits the highest probability of failure in the upcoming month, indicated by the most significant number of recorded breakdowns (30 incidents). The high failure frequency combined with moderate repair time (MTTR = 42.1 minutes). | Anlagenausfall (Störungen) | Anzahl der Ereignisse | 30,0 events | Beide Extraktionen übereinstimmend |
ProoferProoferWörtliches Zitat anzeigen (Section 5.1.2 Time Waste / Figure 4)Proofer, with a recorded 27 failures, has the longest average MTTR (121.22) and reliability at only 4.25%, underscoring its substantial impact on unplanned downtime. | Anlagenausfall (Störungen) | Mittlere Ereignisdauer | 121 min | Beide Extraktionen übereinstimmend |
prooferProoferWörtliches Zitat anzeigen (Figure 2 / Section 4.2)Analysis of breakdown sources in Figure 2 showed that the proofer was the most critical contributor with 55 hours lost across 28 incidents, followed by power interruption during the Eid al-Fitr season. | Anlagenausfall (Störungen) | Anzahl der Ereignisse | 28,0 events | Beide Extraktionen übereinstimmend |
prooferProoferWörtliches Zitat anzeigen (Figure 2 / Section 4.2)Analysis of breakdown sources in Figure 2 showed that the proofer was the most critical contributor with 55 hours lost across 28 incidents, followed by power interruption during the Eid al-Fitr season. | Anlagenausfall (Störungen) | Verlustzeit | 55,0 h | Beide Extraktionen übereinstimmend |
Power InterruptionWörtliches Zitat anzeigen (Section 5.1.2 Time Waste)The Power Interruption category only happened twice; it had a high MTTR of 913.5 minutes, which brought the reliability down to 79.22%. | Organisatorische oder externe Stillstände (Material- oder Personalmangel, Ausfall der Versorgung) | Mittlere Ereignisdauer | 914 min | Beide Extraktionen übereinstimmend |
breakdownsWörtliches Zitat anzeigen (Section 4.2 Measure Phase)Over the course of ten months in 2024, 187 breakdowns resulted in 204.75 hours of downtime (3.032% of production time), an acceptable rate that requires ongoing monitoring, particularly for trends that persist. | Anlagenausfall (Störungen) | Anteil an der geplanten Zeit | 3,03 % | Beide Extraktionen übereinstimmend |
breakdownsWörtliches Zitat anzeigen (Section 4.2 Measure Phase)Over the course of ten months in 2024, 187 breakdowns resulted in 204.75 hours of downtime (3.032% of production time), an acceptable rate that requires ongoing monitoring, particularly for trends that persist. | Anlagenausfall (Störungen) | Verlustzeit | 205 h | Beide Extraktionen übereinstimmend |
breakdownsWörtliches Zitat anzeigen (Section 4.2 Measure Phase)Over the course of ten months in 2024, 187 breakdowns resulted in 204.75 hours of downtime (3.032% of production time), an acceptable rate that requires ongoing monitoring, particularly for trends that persist. | Anlagenausfall (Störungen) | Anzahl der Ereignisse | 187 events | Beide Extraktionen übereinstimmend |
—Wörtliches Zitat anzeigen (Section 4.2 Measure Phase)The 2024 performance yielded a 98.55% yield with an 82% automation level, but moderate technology utilization was observed, indicating untapped potential and weak process control that require further investigation. | none | Ausbeute | 98,6 % | Beide Extraktionen übereinstimmend |
—Wörtliches Zitat anzeigen (Section 5.1.4)Results showed an Availability of 82.41%, a Performance of 87%, and a Quality rate of 68.18%, leading to an overall OEE of 48.64% and indicating potential for improvement, as world-class OEE values typically exceed 85%. | none | OEE | 48,6 % | Beide Extraktionen übereinstimmend |
—Wörtliches Zitat anzeigen (Section 5.1.4)Results showed an Availability of 82.41%, a Performance of 87%, and a Quality rate of 68.18%, leading to an overall OEE of 48.64% and indicating potential for improvement, as world-class OEE values typically exceed 85%. | none | Qualität | 68,2 % | Beide Extraktionen übereinstimmend |
—Wörtliches Zitat anzeigen (Section 5.1.4)Results showed an Availability of 82.41%, a Performance of 87%, and a Quality rate of 68.18%, leading to an overall OEE of 48.64% and indicating potential for improvement, as world-class OEE values typically exceed 85%. | none | Leistung | 87,0 % | Beide Extraktionen übereinstimmend |
—Wörtliches Zitat anzeigen (Section 5.1.4)Results showed an Availability of 82.41%, a Performance of 87%, and a Quality rate of 68.18%, leading to an overall OEE of 48.64% and indicating potential for improvement, as world-class OEE values typically exceed 85%. | none | Verfügbarkeit | 82,4 % | Beide Extraktionen übereinstimmend |
breakdown time and changeover timeWörtliches Zitat anzeigen (Section 4.2 Measure Phase)The waste of breakdown time and changeover time together accounted for 12.8% of production time. | Aus dem Bericht nicht klassifizierbar | Anteil an der geplanten Zeit | 12,8 % | Beide Extraktionen übereinstimmend |
changeover timeWörtliches Zitat anzeigen (Section 4.2 Measure Phase)Changeover activities during January 2025 consumed 66.63 hours, which accounted for 9.77% of total production time, a relatively high percentage attributed to the product variety. | Rüsten und Einstellen | Anteil an der geplanten Zeit | 9,77 % | Beide Extraktionen übereinstimmend |
changeover timeWörtliches Zitat anzeigen (Section 4.2 Measure Phase)Changeover activities during January 2025 consumed 66.63 hours, which accounted for 9.77% of total production time, a relatively high percentage attributed to the product variety. | Rüsten und Einstellen | Verlustzeit | 66,6 h | Beide Extraktionen übereinstimmend |
—Wörtliches Zitat anzeigen (Section 4.1 Define Phase)improving Overall Equipment Effectiveness from its current level of 48% to more than 55% is crucial for enhancing productivity and achieving sustainability | none | OEE | 48,0 % | Einfache Extraktion |
total food wasteWörtliches Zitat anzeigen (Section 4.2 Measure Phase)total waste increased from 85,252 kg (0.42%) in 2022 to 286,723.99 kg (1.48%) in 2024, representing a 236% increase, while downtime increased from 106.26 hours to 244.17 hours, despite production levels remaining relatively stable at around 20 million units. | Aus dem Bericht nicht klassifizierbar | Fehlerquote | 0,420 % | Einfache Extraktion |
total food wasteWörtliches Zitat anzeigen (Section 4.2 Measure Phase)total waste increased from 85,252 kg (0.42%) in 2022 to 286,723.99 kg (1.48%) in 2024, representing a 236% increase, while downtime increased from 106.26 hours to 244.17 hours, despite production levels remaining relatively stable at around 20 million units. | Aus dem Bericht nicht klassifizierbar | Fehlerquote | 1,48 % | Einfache Extraktion |
total food wasteWörtliches Zitat anzeigen (Section 4.2 Measure Phase)total waste increased from 85,252 kg (0.42%) in 2022 to 286,723.99 kg (1.48%) in 2024, representing a 236% increase, while downtime increased from 106.26 hours to 244.17 hours, despite production levels remaining relatively stable at around 20 million units. | Aus dem Bericht nicht klassifizierbar | Fehlerquote | 85.252 kg | Einfache Extraktion |
total food wasteWörtliches Zitat anzeigen (Section 4.2 Measure Phase)Total food waste in the bun production line was 286,723.99 kg in 2024, representing approximately 1.5% of total production. | Aus dem Bericht nicht klassifizierbar | Fehlerquote | 286.724 kg | Einfache Extraktion |
total food wasteWörtliches Zitat anzeigen (Section 4.2 Measure Phase)Total food waste in the bun production line was 286,723.99 kg in 2024, representing approximately 1.5% of total production. | Aus dem Bericht nicht klassifizierbar | Fehlerquote | 1,50 % | Einfache Extraktion |
downtimeWörtliches Zitat anzeigen (Section 4.2 Measure Phase)total waste increased from 85,252 kg (0.42%) in 2022 to 286,723.99 kg (1.48%) in 2024, representing a 236% increase, while downtime increased from 106.26 hours to 244.17 hours, despite production levels remaining relatively stable at around 20 million units. | Aus dem Bericht nicht klassifizierbar | Verlustzeit | 106 h | Einfache Extraktion |
downtimeWörtliches Zitat anzeigen (Section 4.2 Measure Phase)total waste increased from 85,252 kg (0.42%) in 2022 to 286,723.99 kg (1.48%) in 2024, representing a 236% increase, while downtime increased from 106.26 hours to 244.17 hours, despite production levels remaining relatively stable at around 20 million units. | Aus dem Bericht nicht klassifizierbar | Verlustzeit | 244 h | Einfache Extraktion |
total food wasteWörtliches Zitat anzeigen (Section 4.2 Measure Phase)Over the course of ten months in 2024, the total food waste amounted to 182,539 kg. | Aus dem Bericht nicht klassifizierbar | Fehlerquote | 182.539 kg | Einfache Extraktion |
production wasteWörtliches Zitat anzeigen (Section 4.2 Measure Phase)It is categorized into three primary sources: production waste at 37.7%, breakdown waste at 61.7%, and R&D waste at 0.6%. | Prozessfehler (Ausschuss und Nacharbeit) | Fehlerquote | 37,7 % | Einfache Extraktion |
breakdown wasteWörtliches Zitat anzeigen (Section 4.2 Measure Phase)It is categorized into three primary sources: production waste at 37.7%, breakdown waste at 61.7%, and R&D waste at 0.6%. | Anlagenausfall (Störungen) | Fehlerquote | 61,7 % | Einfache Extraktion |
R&D wasteWörtliches Zitat anzeigen (Section 4.2 Measure Phase)It is categorized into three primary sources: production waste at 37.7%, breakdown waste at 61.7%, and R&D waste at 0.6%. | Aus dem Bericht nicht klassifizierbar | Fehlerquote | 0,600 % | Einfache Extraktion |
R&D wasteWörtliches Zitat anzeigen (Section 4.2 Measure Phase)R&D waste, though minor at 1,158.98 kg in January 2024, represented 6.55% of experimental activity waste in the month. | Aus dem Bericht nicht klassifizierbar | Fehlerquote | 1.159 kg | Einfache Extraktion |
R&D wasteWörtliches Zitat anzeigen (Section 4.2 Measure Phase)R&D waste, though minor at 1,158.98 kg in January 2024, represented 6.55% of experimental activity waste in the month. | Aus dem Bericht nicht klassifizierbar | Anteil an der Verlustzeit | 6,55 % | Einfache Extraktion |
non-productive activitiesWörtliches Zitat anzeigen (Section 4.2 Measure Phase)Based on January 2025 performance, 86.5% of planned production time was used effectively, while 13.5% was lost to non-productive activities, including setup, changeover, machine downtime, and maintenance. | Aus dem Bericht nicht klassifizierbar | Anteil an der geplanten Zeit | 13,5 % | Einfache Extraktion |
breakdown eventsWörtliches Zitat anzeigen (Figure 5 / Section 5.1.2)Analysis of 200 breakdown events by shift (Day: 6 AM - 6 PM, Night: 6 PM - 6 AM), Figure 5 showed a higher concentration of incidents during the night shift, particularly in the late evening and early morning hours. | Anlagenausfall (Störungen) | Anzahl der Ereignisse | 200 events | Einfache Extraktion |
depanning failuresdepannerWörtliches Zitat anzeigen (Section 5.1.1 Food Waste)The depanning failures, representing approximately 46.5% of production waste, were identified as the most significant contribution. | Prozessfehler (Ausschuss und Nacharbeit) | Fehlerquote | 46,5 % | Einfache Extraktion |
proofing and baking deviationsWörtliches Zitat anzeigen (Section 5.1.1 Food Waste)Proofing and baking deviations, together accounting for 27% of production waste, were primarily linked to equipment malfunctions in the proofer and oven discussed earlier. | Prozessfehler (Ausschuss und Nacharbeit) | Fehlerquote | 27,0 % | Einfache Extraktion |
ingredient mixing errorsWörtliches Zitat anzeigen (Section 5.1.1 Food Waste)Ingredient mixing errors (12.5%) were another source of loss, due to manual weighing and human variability. | Prozessfehler (Ausschuss und Nacharbeit) | Fehlerquote | 12,5 % | Einfache Extraktion |
topping and panning failuresWörtliches Zitat anzeigen (Section 5.1.1 Food Waste)Similarly, topping and panning failures (13.9% combined) occurred when dough balls were misaligned in pans or when glazing and sesame seeds were applied unsuccessfully. | Prozessfehler (Ausschuss und Nacharbeit) | Fehlerquote | 13,9 % | Einfache Extraktion |
DepannerdepannerWörtliches Zitat anzeigen (Section 5.2 Improve Phase)Analysis showed that the Imprinter caused 53% of breakdown-related waste (32.7% of total), followed by the Depanner at 17.4% and Ingredient Mixing at 12.9%. | Prozessfehler (Ausschuss und Nacharbeit) | Fehlerquote | 17,4 % | Einfache Extraktion |
Ingredient MixingWörtliches Zitat anzeigen (Section 5.2 Improve Phase)Analysis showed that the Imprinter caused 53% of breakdown-related waste (32.7% of total), followed by the Depanner at 17.4% and Ingredient Mixing at 12.9%. | Prozessfehler (Ausschuss und Nacharbeit) | Fehlerquote | 12,9 % | Einfache Extraktion |
ImprinterImprinterWörtliches Zitat anzeigen (Figure 1 / Section 4.2)Pareto analysis (Figure 1) identified the imprinter machine as having the most significant contribution at 59,692 kg and requiring the highest level of priority for corrective action. | Anlagenausfall (Störungen) | Fehlerquote | 59.692 kg | Einfache Extraktion |
ImprinterImprinterWörtliches Zitat anzeigen (Section 5.1.1 Food Waste)The earlier Pareto chart shown in Figure 1 identified the imprinter machine as the most critical source, contributing 53% of breakdown waste and 32.7% of total food waste. | Anlagenausfall (Störungen) | Fehlerquote | 53,0 % | Einfache Extraktion |
ImprinterImprinterWörtliches Zitat anzeigen (Section 5.1.1 Food Waste)The earlier Pareto chart shown in Figure 1 identified the imprinter machine as the most critical source, contributing 53% of breakdown waste and 32.7% of total food waste. | Anlagenausfall (Störungen) | Fehlerquote | 32,7 % | Einfache Extraktion |
ProoferProoferWörtliches Zitat anzeigen (Section 5.1.1 Food Waste)The proof was identified as the second-largest contributor to breakdown waste, generating 14,820 kg of waste due to repeated failures in its endless drive system. | Anlagenausfall (Störungen) | Fehlerquote | 14.820 kg | Einfache Extraktion |
ProoferProoferWörtliches Zitat anzeigen (Section 5.1.2 Time Waste / Figure 4)Proofer, with a recorded 27 failures, has the longest average MTTR (121.22) and reliability at only 4.25%, underscoring its substantial impact on unplanned downtime. | Anlagenausfall (Störungen) | Anzahl der Ereignisse | 27,0 events | Einfache Extraktion |
ovenOvenWörtliches Zitat anzeigen (Section 5.1.1 Food Waste)Next, the oven, with 7,392 kg of waste, experienced frequent jamming and gas supply fluctuations, resulting in uneven baking and temperature deviations. | Anlagenausfall (Störungen) | Fehlerquote | 7.392 kg | Einfache Extraktion |
food wasteWörtliches Zitat anzeigen (Section 5.2.3 Solutions Execution)Implementation resulted in a reduction of 24.8% in food waste, from 1.5% to 1.13%, and a 7.11% increase in OEE, from 48% to 52.6%. | Aus dem Bericht nicht klassifizierbar | Fehlerquote | 1,13 % | Einfache Extraktion |
—Wörtliches Zitat anzeigen (Section 5.2.3 Solutions Execution)Implementation resulted in a reduction of 24.8% in food waste, from 1.5% to 1.13%, and a 7.11% increase in OEE, from 48% to 52.6%. | none | OEE | 52,6 % | Einfache Extraktion |
food wasteWörtliches Zitat anzeigen (Section 5.2.3 Solutions Execution)Implementation led to a 13% reduction in food waste, from 1.13% to 0.983%, 5% increase in OEE, from 52.6% to 55.4%, and a 31.6% reduction in time waste, dropping from 12.8% to 8.76%, successfully meeting the project objectives. | Aus dem Bericht nicht klassifizierbar | Fehlerquote | 0,983 % | Einfache Extraktion |
—Wörtliches Zitat anzeigen (Section 4.2)Total food waste in the bun production line was 286,723.99 kg in 2024, representing approximately 1.5% of total production. | Prozessfehler (Ausschuss und Nacharbeit) | Anteil an der geplanten Zeit | 1,50 % | Einfache Extraktion |
—Wörtliches Zitat anzeigen (Section 4.2)It is categorized into three primary sources: production waste at 37.7%, breakdown waste at 61.7%, and R&D waste at 0.6%. | Anlagenausfall (Störungen) | Anteil an der Verlustzeit | 61,7 % | Einfache Extraktion |
—Wörtliches Zitat anzeigen (Section 4.2)It is categorized into three primary sources: production waste at 37.7%, breakdown waste at 61.7%, and R&D waste at 0.6%. | Prozessfehler (Ausschuss und Nacharbeit) | Anteil an der Verlustzeit | 37,7 % | Einfache Extraktion |
imprinter machineimprinterWörtliches Zitat anzeigen (Section 4.2)Pareto analysis (Figure 1) identified the imprinter machine as having the most significant contribution at 59,692 kg and requiring the highest level of priority for corrective action. | Anlagenausfall (Störungen) | Verlustzeit | 59.692 kg | Einfache Extraktion |
proofer endless drive system failuresprooferWörtliches Zitat anzeigen (Section 5.1.1)The proof was identified as the second-largest contributor to breakdown waste, generating 14,820 kg of waste due to repeated failures in its endless drive system. | Anlagenausfall (Störungen) | Verlustzeit | 14.820 kg | Einfache Extraktion |
oven jamming and gas supply fluctuationsovenWörtliches Zitat anzeigen (Section 5.1.1)Next, the oven, with 7,392 kg of waste, experienced frequent jamming and gas supply fluctuations, resulting in uneven baking and temperature deviations. | Anlagenausfall (Störungen) | Verlustzeit | 7.392 kg | Einfache Extraktion |
depanning failuresdepannerWörtliches Zitat anzeigen (Section 5.1.1)The depanning failures, representing approximately 46.5% of production waste, were identified as the most significant contribution. | Prozessfehler (Ausschuss und Nacharbeit) | Anteil an der Verlustzeit | 46,5 % | Einfache Extraktion |
proofing and baking deviationsproofer, ovenWörtliches Zitat anzeigen (Section 5.1.1)Proofing and baking deviations, together accounting for 27% of production waste, were primarily linked to equipment malfunctions in the proofer and oven | Prozessfehler (Ausschuss und Nacharbeit) | Anteil an der Verlustzeit | 27,0 % | Einfache Extraktion |
ingredient mixing errorsWörtliches Zitat anzeigen (Section 5.1.1)Ingredient mixing errors (12.5%) were another source of loss, due to manual weighing and human variability. | Prozessfehler (Ausschuss und Nacharbeit) | Anteil an der Verlustzeit | 12,5 % | Einfache Extraktion |
panning and topping failurespannerWörtliches Zitat anzeigen (Section 5.1.1)Similarly, topping and panning failures (13.9% combined) occurred when dough balls were misaligned in pans or when glazing and sesame seeds were applied unsuccessfully. | Prozessfehler (Ausschuss und Nacharbeit) | Anteil an der Verlustzeit | 13,9 % | Einfache Extraktion |
—Wörtliches Zitat anzeigen (Section 5.2.3)In Phase 2, from April to May 2025, similar product scheduling was implemented, along with preventive maintenance and the standardization of color-coded measuring tools. Implementation led to a 13% reduction in food waste, from 1.13% to 0.983% | Prozessfehler (Ausschuss und Nacharbeit) | Anteil an der geplanten Zeit | 0,983 % | Einfache Extraktion |
Beobachtungseinheiten
- Bun production line (Phase 2) · Gesamte Linie oder nicht spezifizierte Anlage · Nach der Intervention
- Divider · Formen, Gießen und Dosieren · Ausgangslage
- Proofer · Fermentation · Ausgangslage
- Bun production line · Gesamte Linie oder nicht spezifizierte Anlage · Ausgangslage
- Imprinter · Formen, Gießen und Dosieren · Ausgangslage
- Oven · Backen · Ausgangslage
- Bun production line (Phase 1) · Gesamte Linie oder nicht spezifizierte Anlage · Nach der Intervention
- Bun Production Line · Gesamte Linie oder nicht spezifizierte Anlage · Nach der Intervention