foratvise
Get Started
Equipment failure (breakdowns)

Ingredient/Component Addition Equipment Failure

Equipment failure (breakdowns)AvailabilityWhole line or unspecified equipment

In short

It appears in about 1 of every 100 lines studied.

When it appears, it takes on average about 58 % of the line's lost time. Reported by 1 of the 127 studies that could observe it (sparse evidence).

What happens

Equipment dedicated to dosing or adding an ingredient, additive or component into the product stream (pumps, feeders, dosing valves, actuators) suffers a mechanical, electrical or control fault and stops performing its function, halting the addition step and the line that depends on it. The failure typically requires a maintenance intervention such as repair, part replacement or recalibration before production can resume.

What is done about it

Apply preventive and condition-based maintenance on dosing pumps, valves, feeders and their actuators, including routine inspection, lubrication, seal replacement and calibration checks. Keep critical spare parts available and standardize troubleshooting procedures to reduce repair time when a fault occurs.

Practical guidance written from engineering knowledge; it is not a statistical estimate.

1Probability and evidence

Pooled over all segments. A wide interval is a result: it states how much the evidence allows us to know.
Probability of presence
0.6% [0.1–1.5%]
Expected share of lost time
0.3% [0.1–0.9%]
Share of lost time when present
58% [46–68%]
Studies / units
127 / 161
Evidence grade
D

Grade D: 0 or 1 study; the estimate is driven by partial pooling and priors, and the wide interval is the result.

2Probability by segment

Partially pooled estimates for each industry segment.
  • Dairy products
    0.6% [0.1–2.4%]13 studies
  • Soft drinks, bottled water and juices
    0.6% [0.1–1.9%]26 studies
  • Brewing, wine and spirits
    0.6% [0.1–2.2%]11 studies
  • Bakery and pasta
    0.6% [0.1–2.0%]24 studies
  • Meat, poultry and seafood
    0.6% [0.1–2.4%]9 studies
  • Fruit and vegetable processing
    0.7% [0.1–2.4%]7 studies
  • Grain and oilseed milling
    0.6% [0.1–2.3%]6 studies
  • Sugar and confectionery
    0.6% [0.1–2.3%]9 studies
  • Snacks, coffee, tea and other foods
    0.6% [0.1–2.4%]5 studies
  • Animal feed and pet food
    1.0% [0.1–3.5%]7 studies
  • Food manufacturing (unspecified or mixed)
    0.6% [0.1–2.3%]10 studies

3Mechanism, SCADA signature and countermeasure

Engineering guidance that helps recognise and address the cause; it is not part of the statistical estimate.

Mechanism

Engineering guidance

Equipment dedicated to dosing or adding an ingredient, additive or component into the product stream (pumps, feeders, dosing valves, actuators) suffers a mechanical, electrical or control fault and stops performing its function, halting the addition step and the line that depends on it. The failure typically requires a maintenance intervention such as repair, part replacement or recalibration before production can resume.

How it looks in SCADA data

Engineering guidance

SCADA/MES shows an unplanned stop or fault alarm on the addition/dosing module, with the equipment state changing to fault or down and associated flow, weight or level signals flatlining or deviating from setpoint. Neighbouring upstream or downstream equipment may show starvation or blocking states correlated with the addition station downtime.

Countermeasure

Engineering guidance

Apply preventive and condition-based maintenance on dosing pumps, valves, feeders and their actuators, including routine inspection, lubrication, seal replacement and calibration checks. Keep critical spare parts available and standardize troubleshooting procedures to reduce repair time when a fault occurs.

4Sources

Every extracted datum with its study, value and verbatim quote.
  1. Lost time: 0.230 Kg.h-1 · as reported: “Addition (all products)”
    Show verbatim quote
    1Adition 3.60 0.064 ± 0.022 0.230 ± 0.079 Kg 2.87