foratvise
Get Started
Equipment failure (breakdowns)

Product loss from bulk material handling equipment failure

Equipment failure (breakdowns)AvailabilityWhole line or unspecified equipment

In short

It appears in about 1 of every 100 lines studied.

When it appears, it takes on average about 58 % of the line's lost time. Reported by 1 of the 127 studies that could observe it (sparse evidence).

What happens

Wear, seal failure or mechanical breakdown in bulk handling equipment such as conveyors, elevators, pneumatic transport lines and storage bins allows grain, feed or meal product to spill, leak or become trapped outside the intended flow path. The loss accumulates gradually through small breaches or suddenly when a component such as a belt, chain, valve or housing fails.

What is done about it

Apply preventive maintenance to seals, belts, bearings and housings of handling equipment, inspect enclosures and transfer points regularly for leaks, and repair breaches as soon as they are detected rather than waiting for scheduled stops. Install or review containment and dust/spill collection systems at known weak points in the handling sector.

Practical guidance written from engineering knowledge; it is not a statistical estimate.

1Probability and evidence

Pooled over all segments. A wide interval is a result: it states how much the evidence allows us to know.
Probability of presence
0.6% [0.1–1.6%]
Expected share of lost time
0.3% [0.1–0.9%]
Share of lost time when present
58% [46–68%]
Studies / units
127 / 161
Evidence grade
D

Grade D: 0 or 1 study; the estimate is driven by partial pooling and priors, and the wide interval is the result.

2Probability by segment

Partially pooled estimates for each industry segment.
  • Dairy products
    0.6% [0.1–2.3%]13 studies
  • Soft drinks, bottled water and juices
    0.6% [0.1–1.9%]26 studies
  • Brewing, wine and spirits
    0.6% [0.1–2.3%]11 studies
  • Bakery and pasta
    0.6% [0.1–2.0%]24 studies
  • Meat, poultry and seafood
    0.6% [0.1–2.4%]9 studies
  • Fruit and vegetable processing
    0.7% [0.1–2.5%]7 studies
  • Grain and oilseed milling
    0.7% [0.1–2.5%]6 studies
  • Sugar and confectionery
    0.6% [0.1–2.3%]9 studies
  • Snacks, coffee, tea and other foods
    0.7% [0.1–2.5%]5 studies
  • Animal feed and pet food
    1.0% [0.1–3.8%]7 studies
  • Food manufacturing (unspecified or mixed)
    0.6% [0.1–2.5%]10 studies

3Mechanism, SCADA signature and countermeasure

Engineering guidance that helps recognise and address the cause; it is not part of the statistical estimate.

Mechanism

Engineering guidance

Wear, seal failure or mechanical breakdown in bulk handling equipment such as conveyors, elevators, pneumatic transport lines and storage bins allows grain, feed or meal product to spill, leak or become trapped outside the intended flow path. The loss accumulates gradually through small breaches or suddenly when a component such as a belt, chain, valve or housing fails.

How it looks in SCADA data

Engineering guidance

SCADA/MES shows unplanned stop or fault states on conveying, elevating or storage equipment, discrepancies between metered input and output material quantities, and repeated low-level or blockage alarms on bins and chutes in the affected handling sector. Maintenance work orders cluster around the same assets without a clear process-rate signature.

Countermeasure

Engineering guidance

Apply preventive maintenance to seals, belts, bearings and housings of handling equipment, inspect enclosures and transfer points regularly for leaks, and repair breaches as soon as they are detected rather than waiting for scheduled stops. Install or review containment and dust/spill collection systems at known weak points in the handling sector.

4Sources

Every extracted datum with its study, value and verbatim quote.
  1. Lost time: 44.8 Kg.h-1 · as reported: “Product loss in corn grain handling sectors”
    Show verbatim quote
    Sectors Corn grains 44.822 ± 10.666 Kg
  2. Lost time: 16.5 Kg.h-1 · as reported: “Product loss in soybean meal handling sectors”
    Show verbatim quote
    Sectors Soybean meals 16.535 ± 2.321 Kg
  3. Lost time: 8.01 Kg.h-1 · as reported: “Product loss in feed production sectors”
    Show verbatim quote
    Sectors Feed production 8.009 ± 2.508 Kg