In short
It appears in fewer than 1 of every 100 lines studied.
When it appears, it takes on average about 57 % of the line's lost time. Reported by 0 of the 60 studies that could observe it (sparse evidence).
What happens
A link of the oven or line conveyor chain becomes damaged, cracked or elongated through fatigue and cannot be fixed in place, so the chain section must be removed and taken to the workshop for repair or replacement before the line can resume running. The line is held in a non-production state while the mechanical team disassembles, repairs and reinstalls the chain, including the time needed to re-tension and align it.
What is done about it
Implement a preventive inspection and lubrication program for chain links with scheduled replacement based on wear measurements, and keep spare chain sections or links on hand to minimize the time the line is stopped. Where feasible, design the chain path with quick-release sections so damaged links can be swapped without a full workshop teardown.
Practical guidance written from engineering knowledge; it is not a statistical estimate.
1Probability and evidence
- Probability of presence
- 0.4% [0.1–1.4%]
- Expected share of lost time
- 0.2% [0.0–0.8%]
- Share of lost time when present
- 57% [44–67%]
- Studies / units
- 60 / 73
- Evidence grade
- D
Grade D: 0 or 1 study; the estimate is driven by partial pooling and priors, and the wide interval is the result.
2Probability by segment
- Dairy products0.5% [0.0–2.3%]5 studies
- Soft drinks, bottled water and juices0.5% [0.0–2.2%]1 study
- Brewing, wine and spirits0.5% [0.0–2.1%]0 studies
- Bakery and pasta0.4% [0.0–1.7%]27 studies
- Meat, poultry and seafood0.5% [0.0–2.1%]2 studies
- Fruit and vegetable processing0.5% [0.0–2.1%]2 studies
- Grain and oilseed milling0.5% [0.0–2.1%]0 studies
- Sugar and confectionery0.5% [0.0–2.1%]8 studies
- Snacks, coffee, tea and other foods0.5% [0.0–2.0%]4 studies
- Animal feed and pet food0.5% [0.0–2.1%]4 studies
- Food manufacturing (unspecified or mixed)0.5% [0.0–2.1%]7 studies
3Mechanism, SCADA signature and countermeasure
Mechanism
Engineering guidanceA link of the oven or line conveyor chain becomes damaged, cracked or elongated through fatigue and cannot be fixed in place, so the chain section must be removed and taken to the workshop for repair or replacement before the line can resume running. The line is held in a non-production state while the mechanical team disassembles, repairs and reinstalls the chain, including the time needed to re-tension and align it.
How it looks in SCADA data
Engineering guidanceConveyor or oven drive shows a stopped or faulted state with motor current dropping to near zero, often preceded by increasing drive torque or speed-mismatch alarms before the fault. Downstream stations show starvation and upstream stations show blocking for the full duration the chain section is out for repair, and the stop is logged as a maintenance intervention rather than a brief jam clearance.
Countermeasure
Engineering guidanceImplement a preventive inspection and lubrication program for chain links with scheduled replacement based on wear measurements, and keep spare chain sections or links on hand to minimize the time the line is stopped. Where feasible, design the chain path with quick-release sections so damaged links can be swapped without a full workshop teardown.
4Sources
- Modelo propuesto para la implementación de la metodología SMED en una empresa de alimentos de Santiago de Cali (2017)Open sourceLost time: 345 min:s · as reported: “Repair link in workshop”
Show verbatim quote
Reparar eslabón en taller 345:28