foratvise
Get Started
Included study

Modelo propuesto para la implementación de la metodología SMED en una empresa de alimentos de Santiago de Cali

Open source

1Bibliographic record

Authors
Jairo Arboleda Zúñiga, Fabián M. Rubiano Del Chiaro
Year
2017
Venue
Revista de Investigación
Country
Colombia
Segment
Bakery and pasta
Process family
Forming, baking and cooking
Study type
Single case study
Extraction scope
Full text
Size
1 plants · 1 lines · 5 machines
Observation period
365 days
Data collection
manual_logs
Intervention
Show the setting as described by the study
Actualmente la empresa cuenta con cinco máquinas de producción marca I.M.A.R., máquinas automáticas diseñadas para la cocción y la producción de productos alimenticios a base de harina (conos de helado).

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 13Low risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described.2 / 2
Is the observation period long enough and reported?Period reported but shorter than 30 days, or only the number of shifts is given.1 / 2
How were loss data collected?Manual logs or maintenance records with unknown completeness.1 / 2
Are OEE, loading time and the loss categories defined explicitly?A standard definition is cited but its application is not shown.1 / 2
Does the loss breakdown account for the total loss it claims to explain?The reported causes or categories sum to at least 90% of the stated total, or an explicit "other" class closes the balance.2 / 2
Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method.2 / 2
Are the reported numbers internally consistent?Recomputed totals, shares and OEE factors agree with the reported values within 2 percentage points.2 / 2
Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result.2 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
Repair link in workshopchain link (eslabón)
Show verbatim quote (Tabla 4)
Reparar eslabón en taller 345:28
Setup and adjustmentsLost time345 min:sBoth extractors agreed
—MQ2
Show verbatim quote (Tabla 3)
TOTAL 457 1943:21
Setup and adjustmentsLost time1,943 min:sBoth extractors agreed
Tool preparation
Show verbatim quote (Tabla 4)
Alistamiento de herramientas 3:00
Setup and adjustmentsLost time3.00 min:sBoth extractors agreed
—MQ1
Show verbatim quote (Tabla 1)
Horas perdidas 216 348 518 221 273 Horas programadas 2844 2376 6777 2932 3440 % de tiempo perdido 7.59 14.65 7.64 7.54 7.93
Not classifiable from the reportLost time216 hSingle extractor
—MQ1
Show verbatim quote (Tabla 1)
Horas perdidas 216 348 518 221 273 Horas programadas 2844 2376 6777 2932 3440 % de tiempo perdido 7.59 14.65 7.64 7.54 7.93
Not classifiable from the reportShare of planned time7.59 %Single extractor
—MQ1
Show verbatim quote (Tabla 2)
% de eficiencia 78.3 62.8 89.3 81.9 79.6 % de und. rechazadas 16.3 56.4 6.0 13.2 14.3
nonePerformance78.3 %Single extractor
—MQ1
Show verbatim quote (Tabla 2)
% de eficiencia 78.3 62.8 89.3 81.9 79.6 % de und. rechazadas 16.3 56.4 6.0 13.2 14.3
Process defects (scrap and rework)Defect rate16.3 %Single extractor
—MQ2
Show verbatim quote (Tabla 1)
Horas perdidas 216 348 518 221 273 Horas programadas 2844 2376 6777 2932 3440 % de tiempo perdido 7.59 14.65 7.64 7.54 7.93
Not classifiable from the reportLost time348 hSingle extractor
—MQ2
Show verbatim quote (Tabla 1)
Horas perdidas 216 348 518 221 273 Horas programadas 2844 2376 6777 2932 3440 % de tiempo perdido 7.59 14.65 7.64 7.54 7.93
Not classifiable from the reportShare of planned time14.7 %Single extractor
—MQ2
Show verbatim quote (Tabla 2)
% de eficiencia 78.3 62.8 89.3 81.9 79.6 % de und. rechazadas 16.3 56.4 6.0 13.2 14.3
nonePerformance62.8 %Single extractor
—MQ2
Show verbatim quote (Tabla 2)
% de eficiencia 78.3 62.8 89.3 81.9 79.6 % de und. rechazadas 16.3 56.4 6.0 13.2 14.3
Process defects (scrap and rework)Defect rate56.4 %Single extractor
Operations
Show verbatim quote (Tabla 3)
Operaciones 366 518:05
Setup and adjustmentsNumber of events366 eventsSingle extractor
Operations
Show verbatim quote (Tabla 3)
Operaciones 366 518:05
Setup and adjustmentsLost time518 min:sSingle extractor
Inspections
Show verbatim quote (Tabla 3)
Inspecciones 45 77:10
Setup and adjustmentsNumber of events45.0 eventsSingle extractor
Inspections
Show verbatim quote (Tabla 3)
Inspecciones 45 77:10
Setup and adjustmentsLost time77.1 min:sSingle extractor
Transports
Show verbatim quote (Tabla 3)
Transportes 21 28:21
Setup and adjustmentsNumber of events21.0 eventsSingle extractor
Storage
Show verbatim quote (Tabla 3)
Almacenajes 21 24:30
Setup and adjustmentsNumber of events21.0 eventsSingle extractor
Delays
Show verbatim quote (Tabla 3)
Demoras 4 1295:15
Setup and adjustmentsNumber of events4.00 eventsSingle extractor
Delays
Show verbatim quote (Tabla 3)
Demoras 4 1295:15
Setup and adjustmentsLost time1,295 min:sSingle extractor
—MQ2
Show verbatim quote (Tabla 3)
TOTAL 457 1943:21
Setup and adjustmentsNumber of events457 eventsSingle extractor
—MQ2
Show verbatim quote (Tabla 4)
TOTAL 397:52
Setup and adjustmentsLost time398 min:sSingle extractor
—MQ3
Show verbatim quote (Tabla 1)
Horas perdidas 216 348 518 221 273 Horas programadas 2844 2376 6777 2932 3440 % de tiempo perdido 7.59 14.65 7.64 7.54 7.93
Not classifiable from the reportLost time518 hSingle extractor
—MQ3
Show verbatim quote (Tabla 1)
Horas perdidas 216 348 518 221 273 Horas programadas 2844 2376 6777 2932 3440 % de tiempo perdido 7.59 14.65 7.64 7.54 7.93
Not classifiable from the reportShare of planned time7.64 %Single extractor
—MQ3
Show verbatim quote (Tabla 2)
% de eficiencia 78.3 62.8 89.3 81.9 79.6 % de und. rechazadas 16.3 56.4 6.0 13.2 14.3
nonePerformance89.3 %Single extractor
—MQ3
Show verbatim quote (Tabla 2)
% de eficiencia 78.3 62.8 89.3 81.9 79.6 % de und. rechazadas 16.3 56.4 6.0 13.2 14.3
Process defects (scrap and rework)Defect rate6.00 %Single extractor
—MQ4
Show verbatim quote (Tabla 1)
Horas perdidas 216 348 518 221 273 Horas programadas 2844 2376 6777 2932 3440 % de tiempo perdido 7.59 14.65 7.64 7.54 7.93
Not classifiable from the reportLost time221 hSingle extractor
—MQ4
Show verbatim quote (Tabla 1)
Horas perdidas 216 348 518 221 273 Horas programadas 2844 2376 6777 2932 3440 % de tiempo perdido 7.59 14.65 7.64 7.54 7.93
Not classifiable from the reportShare of planned time7.54 %Single extractor
—MQ4
Show verbatim quote (Tabla 2)
% de eficiencia 78.3 62.8 89.3 81.9 79.6 % de und. rechazadas 16.3 56.4 6.0 13.2 14.3
nonePerformance81.9 %Single extractor
—MQ4
Show verbatim quote (Tabla 2)
% de eficiencia 78.3 62.8 89.3 81.9 79.6 % de und. rechazadas 16.3 56.4 6.0 13.2 14.3
Process defects (scrap and rework)Defect rate13.2 %Single extractor
—MQ5
Show verbatim quote (Tabla 1)
Horas perdidas 216 348 518 221 273 Horas programadas 2844 2376 6777 2932 3440 % de tiempo perdido 7.59 14.65 7.64 7.54 7.93
Not classifiable from the reportLost time273 hSingle extractor
—MQ5
Show verbatim quote (Tabla 1)
Horas perdidas 216 348 518 221 273 Horas programadas 2844 2376 6777 2932 3440 % de tiempo perdido 7.59 14.65 7.64 7.54 7.93
Not classifiable from the reportShare of planned time7.93 %Single extractor
—MQ5
Show verbatim quote (Tabla 2)
% de eficiencia 78.3 62.8 89.3 81.9 79.6 % de und. rechazadas 16.3 56.4 6.0 13.2 14.3
nonePerformance79.6 %Single extractor
—MQ5
Show verbatim quote (Tabla 2)
% de eficiencia 78.3 62.8 89.3 81.9 79.6 % de und. rechazadas 16.3 56.4 6.0 13.2 14.3
Process defects (scrap and rework)Defect rate14.3 %Single extractor
Suspensión de operación hasta el día siguiente
Show verbatim quote (Table 6, page 11)
Suspensión de operación hasta el día siguiente | 900
Organizational or external stops (material or personnel shortage, utilities outage)Lost time900 minSingle extractor

Observation units

  • MQ2 · Baking · Baseline
  • MQ1 · Baking · Baseline
  • MQ3 · Baking · Baseline
  • MQ4 · Baking · Baseline
  • MQ5 · Baking · Baseline
  • MQ2 · Forming, moulding and depositing · Baseline