foratvise
Get Started

In short

It appears in about 1 of every 100 lines studied.

When it appears, it takes on average about 58 % of the line's lost time. Reported by 1 of the 129 studies that could observe it (sparse evidence).

What happens

The line or associated equipment is held in a non-production state while the Clean-in-Place system executes its scheduled wash, rinse and sanitize phases, so no product can be processed until the cycle completes. Extended or abnormal wash durations can push what is normally a planned sanitation stop into an unplanned equipment-related delay.

What is done about it

Schedule CIP cycles during planned non-production windows where possible and optimize phase times and chemical/flow parameters to shorten the cycle without compromising sanitation. Install parallel CIP sets or buffer capacity to decouple cleaning from production, and monitor cycle duration trends to detect and correct abnormally long washes caused by valve, pump or sensor malfunctions.

Practical guidance written from engineering knowledge; it is not a statistical estimate.

1Probability and evidence

Pooled over all segments. A wide interval is a result: it states how much the evidence allows us to know.
Probability of presence
0.5% [0.1–1.5%]
Expected share of lost time
0.3% [0.1–0.9%]
Share of lost time when present
58% [47–69%]
Studies / units
129 / 163
Evidence grade
D

Grade D: 0 or 1 study; the estimate is driven by partial pooling and priors, and the wide interval is the result.

2Probability by segment

Partially pooled estimates for each industry segment.
  • Dairy products
    0.6% [0.1–2.2%]13 studies
  • Soft drinks, bottled water and juices
    0.5% [0.1–1.9%]27 studies
  • Brewing, wine and spirits
    0.6% [0.1–2.3%]11 studies
  • Bakery and pasta
    0.6% [0.1–2.0%]24 studies
  • Meat, poultry and seafood
    0.6% [0.1–2.2%]9 studies
  • Fruit and vegetable processing
    0.7% [0.1–2.6%]7 studies
  • Grain and oilseed milling
    0.6% [0.1–2.3%]6 studies
  • Sugar and confectionery
    0.6% [0.1–2.4%]9 studies
  • Snacks, coffee, tea and other foods
    0.6% [0.1–2.3%]5 studies
  • Animal feed and pet food
    0.6% [0.1–2.2%]7 studies
  • Food manufacturing (unspecified or mixed)
    0.9% [0.1–3.4%]11 studies

3Mechanism, SCADA signature and countermeasure

Engineering guidance that helps recognise and address the cause; it is not part of the statistical estimate.

Mechanism

Engineering guidance

The line or associated equipment is held in a non-production state while the Clean-in-Place system executes its scheduled wash, rinse and sanitize phases, so no product can be processed until the cycle completes. Extended or abnormal wash durations can push what is normally a planned sanitation stop into an unplanned equipment-related delay.

How it looks in SCADA data

Engineering guidance

CIP controller or line state log shows a transition into wash/rinse/sanitize/drain phases with the downstream line in a stopped or standby state; MES records a downtime event tagged to the CIP system with a logged duration, and outlier events with unusually long durations appear as the recorded maxima. Flow, temperature and conductivity trends on the CIP skid confirm the active phase sequence during the stop.

Countermeasure

Engineering guidance

Schedule CIP cycles during planned non-production windows where possible and optimize phase times and chemical/flow parameters to shorten the cycle without compromising sanitation. Install parallel CIP sets or buffer capacity to decouple cleaning from production, and monitor cycle duration trends to detect and correct abnormally long washes caused by valve, pump or sensor malfunctions.

4Sources

Every extracted datum with its study, value and verbatim quote.
  1. Lost time: 16.0 h · as reported: “CIP wash stop”
    Show verbatim quote
    The stop that represents the largest proportion is the CIP wash stop, which represents a stop time of approximately 16 hours.
  2. Lost time: 26.0 h · as reported: “CIP wash stop (maximum recorded)”
    Show verbatim quote
    the plant management recorded washing times that exceeded the planned one, occupying a maximum of 26 stop-page hours