In short
It appears in about 1 of every 100 lines studied.
When it appears, it takes on average about 64 % of the line's lost time. Reported by 1 of the 76 studies that could observe it (sparse evidence).
What happens
Product residue, grease or process debris gradually accumulates on the working surfaces of the forming dies, altering material flow, release and dimensional accuracy. To avoid defects or jamming, operators deliberately run the forming station below its design rate until the dies are cleaned.
What is done about it
Implement a scheduled die cleaning or wipe-down routine based on run time or visual/sensor inspection, and consider improved release coatings or automated in-process cleaning cycles to limit residue buildup.
Practical guidance written from engineering knowledge; it is not a statistical estimate.
1Probability and evidence
- Probability of presence
- 0.9% [0.2–2.4%]
- Expected share of lost time
- 0.6% [0.1–1.6%]
- Share of lost time when present
- 64% [51–76%]
- Studies / units
- 76 / 96
- Evidence grade
- D
Grade D: 0 or 1 study; the estimate is driven by partial pooling and priors, and the wide interval is the result.
2Probability by segment
- Dairy products1.0% [0.1–3.9%]5 studies
- Soft drinks, bottled water and juices0.9% [0.1–3.2%]11 studies
- Brewing, wine and spirits1.1% [0.1–4.2%]0 studies
- Bakery and pasta0.9% [0.1–3.0%]25 studies
- Meat, poultry and seafood1.1% [0.1–4.1%]3 studies
- Fruit and vegetable processing1.0% [0.1–4.2%]3 studies
- Grain and oilseed milling1.1% [0.1–4.1%]0 studies
- Sugar and confectionery1.0% [0.1–3.6%]8 studies
- Snacks, coffee, tea and other foods1.4% [0.2–5.2%]7 studies
- Animal feed and pet food1.0% [0.1–3.6%]6 studies
- Food manufacturing (unspecified or mixed)1.0% [0.1–3.6%]8 studies
3Mechanism, SCADA signature and countermeasure
Mechanism
Engineering guidanceProduct residue, grease or process debris gradually accumulates on the working surfaces of the forming dies, altering material flow, release and dimensional accuracy. To avoid defects or jamming, operators deliberately run the forming station below its design rate until the dies are cleaned.
How it looks in SCADA data
Engineering guidanceMES/SCADA shows the forming station running continuously but at a cycle rate persistently below the ideal set point, with no fault or stop alarms raised; the slow period typically ends with a short cleaning or maintenance state before speed returns to normal. Trend data often shows a gradual decline in rate between cleaning events, correlating with run time since the last die cleaning.
Countermeasure
Engineering guidanceImplement a scheduled die cleaning or wipe-down routine based on run time or visual/sensor inspection, and consider improved release coatings or automated in-process cleaning cycles to limit residue buildup.
4Sources
- Pendekatan OEE (Overall Equipment Effectiveness) Untuk Mengurangi Losses Pada Mesin Moulding Cerex (2021)Open sourceShare of planned time: 14.4 % · as reported: “dies kotor”
Show verbatim quote
nilai six big losses tertinggi pada faktor reduced speed losses yaitu 14,37%
- Pendekatan OEE (Overall Equipment Effectiveness) Untuk Mengurangi Losses Pada Mesin Moulding Cerex (2021)Open sourceShare of planned time: 5.48 % · as reported: “dies kotor”
Show verbatim quote
nilai reduced losses yang memiliki kontribusi terbesar terhadap rendahnya nilai six big losses yang sebelumnya 14.37% menjadi 5.48%