1Bibliographic record
- Authors
- Emi Karmilawati Karmilawati, Kristanto Mulyono, Suwaryo Nugroho
- Year
- 2021
- Venue
- Jurnal Optimasi Teknik Industri (JOTI)
- Country
- Indonesia
- Segment
- Snacks, coffee, tea and other foods
- Process family
- Forming, baking and cooking
- Study type
- Before/after intervention
- Extraction scope
- Full text
- Size
- 1 plants · 1 lines · 1 machines
- Observation period
- 90 days
- Data collection
- not_reported
- Intervention
Show the setting as described by the study
Mesin moulding cerex merupakan sebuah mesin pencetak makanan ringan sejenis sereal yang menggunakan bahan baku utama beras, dalam aktivitas proses produksi produk kerap terjadi kerusakan mesin yang mengakibatkan downtime pada aktivitas proses produksi.
2Risk of bias
Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 9Moderate risk
| Item | Score |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described. | 2 / 2 |
| Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events). | 2 / 2 |
| How were loss data collected?Interviews, estimates, or method not reported. | 0 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?A standard definition is cited but its application is not shown. | 1 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?Only selected causes are reported and the total is unknown. | 0 / 2 |
| Is there evidence of selective reporting of favourable results?Intervention study in which baseline and post-intervention periods differ in length or method. | 1 / 2 |
| Are the reported numbers internally consistent?Recomputed totals, shares and OEE factors agree with the reported values within 2 percentage points. | 2 / 2 |
| Could conflicts of interest or the source of the data bias the result?Authors are employees of the plant or of an equipment/software vendor; no declaration. | 1 / 2 |
3Extracted data
Each datum with its classification and the verbatim quote that states it.
| Reported cause | Loss category | Metric | Value | Extraction |
|---|---|---|---|---|
—moulding cerex machineShow verbatim quote (Conclusions)availability 98.32%, performance rate 95.32%, quality rate 91.55% dan nilai OEE 85.75%. | none | Quality | 91.6 % | Both extractors agreed |
—moulding cerex machineShow verbatim quote (Conclusions)availability 98.32%, performance rate 95.32%, quality rate 91.55% dan nilai OEE 85.75%. | none | Performance | 95.3 % | Both extractors agreed |
—moulding cerex machineShow verbatim quote (Conclusions)availability 98.32%, performance rate 95.32%, quality rate 91.55% dan nilai OEE 85.75%. | none | Availability | 98.3 % | Both extractors agreed |
—moulding cerex machineShow verbatim quote (Conclusions)availability 98.32%, performance rate 95.32%, quality rate 91.55% dan nilai OEE 85.75%. | none | OEE | 85.8 % | Both extractors agreed |
—moulding cerex machineShow verbatim quote (Results and Discussion, Gambar 2)Nilai quality rate rata-rata sebesar 90.74%, rendahnya nilai quality rate disebabkan banyaknya defect in process pada saat produksi berlangsung. | none | Quality | 90.7 % | Both extractors agreed |
—moulding cerex machineShow verbatim quote (Abstract)nilai yang paling mempengaruhi rendahnya nilai OEE pada mesin moulding cerex yaitu performance rate sebesar 88,43% | none | Performance | 88.4 % | Both extractors agreed |
—moulding cerex machineShow verbatim quote (Results and Discussion, Gambar 2)availability rata-rata total untuk tiga bulan bernilai 97.72%. | none | Availability | 97.7 % | Both extractors agreed |
—moulding cerex machineShow verbatim quote (Abstract)didapatkan nilai OEE (Overall Equipment Effectiveness) pada mesin moulding cerex didapatkan nilai OEE sebesar 77,70%. | none | OEE | 77.7 % | Both extractors agreed |
—moulding cerex machineShow verbatim quote (Results and Discussion, Gambar 6)ternyata ada kenaikkan nilai OEE yang cukup baik dari sebelumnya 78.14% menjadi 85.75%. | none | OEE | 78.1 % | Single extractor |
—moulding cerex machineShow verbatim quote (Results and Discussion, Gambar 2)rata-rata nilai performance rate secara keseluruhan diatas 88.34% menunjukkan bahwa nilai performance rate perusahaan masih dibawah kondisi ideal | none | Performance | 88.3 % | Single extractor |
—moulding cerex machineShow verbatim quote (Results and Discussion, Gambar 2)yang memberi kontribudi nilai terendah dari nilai OEE adalah nilai performance rate yaitu sebesar 88.74%. | none | Performance | 88.7 % | Single extractor |
—moulding cerex machineShow verbatim quote (Results and Discussion, Gambar 3)nilai six big losses tertinggi pada faktor reduced speed losses yaitu 14,37%. | Reduced speed | Share of lost time | 14.4 % | Single extractor |
—moulding cerex machineShow verbatim quote (Abstract)nilai oee dapat ditingkatkan menajdi 85% sesuai dengan standar world class. | none | OEE | 85.0 % | Single extractor |
—moulding cerex machineShow verbatim quote (Conclusions)nilai reduced losses yang memiliki kontribusi terbesar terhadap rendahnya nilai six big losses yang sebelumnya 14.37% menjadi 5.48% | Reduced speed | Share of lost time | 5.48 % | Single extractor |
dies kotordiesShow verbatim quote (Page 2, Results and Discussion)nilai six big losses tertinggi pada faktor reduced speed losses yaitu 14,37% | Reduced speed | Share of planned time | 14.4 % | Single extractor |
dies kotordiesShow verbatim quote (Page 3, Conclusions)nilai reduced losses yang memiliki kontribusi terbesar terhadap rendahnya nilai six big losses yang sebelumnya 14.37% menjadi 5.48% | Reduced speed | Share of planned time | 5.48 % | Single extractor |
Observation units
- Mesin Moulding Cerex · Forming, moulding and depositing · After intervention
- Mesin Moulding Cerex · Forming, moulding and depositing · Baseline