It appears in about 1 of every 100 lines studied.
When it appears, it takes on average about 56 % of the line's lost time. Reported by 2 of the 59 studies that could observe it (sparse evidence).
What happens
After a format, product or die change the extruder barrel, screw settings, temperature profile and die gap must be re-tuned before stable output is reached, which halts production while operators make incremental adjustments. The time lost covers the interval from the last good unit of the previous run to the first good unit at the new settings.
What is done about it
Standardize changeover procedures with predefined recipe setpoints for each product or die, use quick-change tooling and preheating strategies to shorten warm-up, and apply SMED analysis to separate internal from external adjustment tasks and reduce manual tuning time.
Practical guidance written from engineering knowledge; it is not a statistical estimate.
1Probability and evidence
- Probability of presence
- 0.7% [0.1–2.3%]
- Expected share of lost time
- 0.4% [0.1–1.3%]
- Share of lost time when present
- 56% [43–67%]
- Studies / units
- 59 / 72
- Evidence grade
- D
Grade D: 0 or 1 study; the estimate is driven by partial pooling and priors, and the wide interval is the result.
2Probability by segment
- Dairy products0.9% [0.1–3.4%]5 studies
- Soft drinks, bottled water and juices0.9% [0.1–3.4%]1 study
- Brewing, wine and spirits0.9% [0.1–3.7%]0 studies
- Bakery and pasta0.7% [0.1–2.6%]23 studies
- Meat, poultry and seafood0.9% [0.1–3.4%]2 studies
- Fruit and vegetable processing0.9% [0.1–3.5%]2 studies
- Grain and oilseed milling0.9% [0.1–3.5%]0 studies
- Sugar and confectionery0.8% [0.1–3.3%]8 studies
- Snacks, coffee, tea and other foods0.8% [0.1–3.2%]5 studies
- Animal feed and pet food1.3% [0.1–5.3%]6 studies
- Food manufacturing (unspecified or mixed)0.8% [0.1–3.3%]7 studies
3Mechanism, SCADA signature and countermeasure
Mechanism
Engineering guidanceAfter a format, product or die change the extruder barrel, screw settings, temperature profile and die gap must be re-tuned before stable output is reached, which halts production while operators make incremental adjustments. The time lost covers the interval from the last good unit of the previous run to the first good unit at the new settings.
How it looks in SCADA data
Engineering guidanceSCADA shows an extended machine state in setup or manual mode with the line stopped or running at low throughput, repeated small changes to temperature, speed or pressure setpoints, and no output counted by the downstream inspection or packaging station during the interval. Cycle counters remain flat while parameter logs show frequent operator-driven changes.
Countermeasure
Engineering guidanceStandardize changeover procedures with predefined recipe setpoints for each product or die, use quick-change tooling and preheating strategies to shorten warm-up, and apply SMED analysis to separate internal from external adjustment tasks and reduce manual tuning time.
4Sources
- การเพิ่มผลผลิตด้วยวิธีการปรับปรุงประสิทธิผลโดยรวมของเครื่องจักร : กรณีศึกษา โรงงานผลิตอาหารสัตว์ (2010)Open sourceLost time: 15.8 h · as reported: “Machine Adjustment (ปรับตั้งเครื่องจักร)”
Show verbatim quote
ปรับตั้งเครื่องจักร 15.83
- การเพิ่มผลผลิตด้วยวิธีการปรับปรุงประสิทธิผลโดยรวมของเครื่องจักร : กรณีศึกษา โรงงานผลิตอาหารสัตว์ (2010)Open sourceLost time: 105 h · as reported: “Machine Adjustment”
Show verbatim quote
Bre ak D ow n Machine Adjus tme nt Die Ch an ge Waiting Time C lea rline 38.33 105.00 112.17 149.83 181.67 6.5 17.9 19.1 25.5 30.9 100.0 93.5 75.6 56.5 30.9