Start-of-production warm-up and adjustment
In short
It appears in fewer than 1 of every 100 lines studied.
When it appears, it takes on average about 57 % of the line's lost time. Reported by 0 of the 76 studies that could observe it (sparse evidence).
What happens
At the beginning of a production run the forming equipment must be brought from a cold or stopped condition up to its operating temperature, pressure, speed and dimensional settings; during this period operators make adjustments to feed, mould alignment and process parameters before the process stabilises, which is accounted as setup time rather than running time.
What is done about it
Apply standardized startup procedures and checklists, pre-heat or pre-condition the equipment ahead of the scheduled start time, and use recipe-driven automatic ramp-up sequences to shorten and make repeatable the warm-up and adjustment period.
Practical guidance written from engineering knowledge; it is not a statistical estimate.
1Probability and evidence
- Probability of presence
- 0.4% [0.1–1.2%]
- Expected share of lost time
- 0.2% [0.0–0.7%]
- Share of lost time when present
- 57% [44–67%]
- Studies / units
- 76 / 96
- Evidence grade
- D
Grade D: 0 or 1 study; the estimate is driven by partial pooling and priors, and the wide interval is the result.
2Probability by segment
- Dairy products0.5% [0.0–2.1%]5 studies
- Soft drinks, bottled water and juices0.5% [0.0–1.8%]11 studies
- Brewing, wine and spirits0.5% [0.0–2.2%]0 studies
- Bakery and pasta0.4% [0.0–1.6%]25 studies
- Meat, poultry and seafood0.5% [0.0–1.8%]3 studies
- Fruit and vegetable processing0.5% [0.0–2.1%]3 studies
- Grain and oilseed milling0.5% [0.0–2.1%]0 studies
- Sugar and confectionery0.5% [0.0–1.8%]8 studies
- Snacks, coffee, tea and other foods0.5% [0.0–1.9%]7 studies
- Animal feed and pet food0.5% [0.0–1.8%]6 studies
- Food manufacturing (unspecified or mixed)0.5% [0.0–2.0%]8 studies
3Mechanism, SCADA signature and countermeasure
Mechanism
Engineering guidanceAt the beginning of a production run the forming equipment must be brought from a cold or stopped condition up to its operating temperature, pressure, speed and dimensional settings; during this period operators make adjustments to feed, mould alignment and process parameters before the process stabilises, which is accounted as setup time rather than running time.
How it looks in SCADA data
Engineering guidanceSCADA/MES records a changeover or setup state code active from the line start command until the first stable cycle is confirmed, with ramp-up patterns visible in temperature, pressure or speed setpoints versus actual values, and manual parameter adjustments logged without associated fault alarms.
Countermeasure
Engineering guidanceApply standardized startup procedures and checklists, pre-heat or pre-condition the equipment ahead of the scheduled start time, and use recipe-driven automatic ramp-up sequences to shorten and make repeatable the warm-up and adjustment period.
4Sources
- CHANGEOVER TIME REDUCTION THROUGH LEAN TOOL “SMED” – A CASE STUDY FROM FOOD SECTOR (2018)Open sourceMean event duration: 3.00 min · as reported: “Start of production”
Show verbatim quote
Start of production: 0:03:00