CHANGEOVER TIME REDUCTION THROUGH LEAN TOOL “SMED” – A CASE STUDY FROM FOOD SECTOR

Open source

1Bibliographic record

Authors
Kateřina Gálová
Year
2018
Venue
International Bata Conference for Ph.D. Students and Young Researchers (DOKBAT)
Country
Czech Republic
Segment
Sugar and confectionery
Process family
Forming, baking and cooking
Study type
Before/after intervention
Extraction scope
Full text
Size
1 plants · 5 lines · — machines
Observation period
365 days
Data collection
automatic_monitoring
Intervention
Show the setting as described by the study
The plant itself, in which the case study was processed, focuses on the production of chocolate and chocolate confectionery.

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 10Moderate risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described.2 / 2
Is the observation period long enough and reported?Period reported but shorter than 30 days, or only the number of shifts is given.1 / 2
How were loss data collected?Manual logs or maintenance records with unknown completeness.1 / 2
Are OEE, loading time and the loss categories defined explicitly?A standard definition is cited but its application is not shown.1 / 2
Does the loss breakdown account for the total loss it claims to explain?Only the top causes are reported and the unexplained remainder can be computed.1 / 2
Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method.2 / 2
Are the reported numbers internally consistent?Small inconsistencies (2 to 10 percentage points) or values that cannot be cross-checked.1 / 2
Could conflicts of interest or the source of the data bias the result?Authors are employees of the plant or of an equipment/software vendor; no declaration.1 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
—
Show verbatim quote (Section 4.2 Actual impacts of the project, p.111)
Savings in the form of released production were 21 tons / year.
noneThroughput21.0 tons/yearBoth extractors agreed
Internal activities
Show verbatim quote (Section 4.2, Figure 9, p.111)
Internal activities occupied 83% of the total time.
Setup and adjustmentsShare of lost time83.0 %Both extractors agreed
changeover (selected type, average, long-run)
Show verbatim quote (Section 4.2 Actual impacts of the project, p.111)
The new changeover time was even lower than the project goal, but in the long run, the time was 210 minutes. This time is kept without any major problems.
Setup and adjustmentsMean event duration210 minBoth extractors agreed
changeover (selected type, annual frequency)
Show verbatim quote (Section 4.2, p.109)
At a frequency of 58 changeovers per year and with a given number of operators and wage rates, the annual savings would be 91 thousand. CZK.
Setup and adjustmentsNumber of events58.0 events/yearBoth extractors agreed
changeover (selected type, average)
Show verbatim quote (Section 4.2 Specification of the project objective, p.109)
The project team decided on the main goal of the project, which was to reduce the time of the selected sort by 10% of the average changeover time, from 244 minutes to 220 minutes.
Setup and adjustmentsMean event duration244 minBoth extractors agreed
Planned stoppages
Show verbatim quote (Section 4.1 / Figure 4, p.108)
It is clear from the chart that the most important were planned stoppages with total time 10184 hours.
Planned downtime (scheduled maintenance, breaks, no demand)Lost time10,184 hoursSingle extractor
Planned stoppages
Show verbatim quote (Section 5 Conclusion, p.113)
Plates fall into planned stoppages, accounting for 61% of all stoppages of the company.
Planned downtime (scheduled maintenance, breaks, no demand)Share of lost time61.0 %Single extractor
Changeovers
Show verbatim quote (Section 5 Conclusion, p.113)
Changeovers on a particular selected line then account for a total of 77% of all planned stoppages on this line.
Setup and adjustmentsShare of lost time77.0 %Single extractor
changeover (most frequent type)
Show verbatim quote (Section 4.1, Figure 8, p.109)
Of these types of changeovers, the fourth longest changeover was the most frequent (which would take 185 minutes), but the longest and second most frequent type of changeover (240 minutes) was eventually chosen by project team for the next step.
Setup and adjustmentsMean event duration185 minSingle extractor
changeover (selected type for SMED project)
Show verbatim quote (Section 4.1, Figure 8, p.109)
Of these types of changeovers, the fourth longest changeover was the most frequent (which would take 185 minutes), but the longest and second most frequent type of changeover (240 minutes) was eventually chosen by project team for the next step.
Setup and adjustmentsMean event duration240 minSingle extractor
External activities
Show verbatim quote (Figure 9, p.111)
internal; 83% external; 17% breakdown; 6% Figure 9 Internal vs external activities. Source: own
Setup and adjustmentsShare of lost time17.0 %Single extractor
breakdown (within changeover)valve
Show verbatim quote (Figure 9, p.111)
internal; 83% external; 17% breakdown; 6% Figure 9 Internal vs external activities. Source: own
Equipment failure (breakdowns)Share of lost time6.00 %Single extractor
changeover (selected type, average, first re-measurement)
Show verbatim quote (Section 4.2 Actual impacts of the project, p.111)
The average throw time dropped from 244 minutes to 194 minutes (Figure 7) and the target was met.
Setup and adjustmentsMean event duration194 minSingle extractor
Flushing masses
Show verbatim quote (Table 6 (Changeover activities))
Flushing masses: 0:39:00
Setup and adjustmentsMean event duration39.0 minSingle extractor
Dismantling the divider
Show verbatim quote (Table 6 (Changeover activities))
Dismantling the divider: 0:28:00
Setup and adjustmentsMean event duration28.0 minSingle extractor
Assembly of dividers
Show verbatim quote (Table 6 (Changeover activities))
Assembly of dividers: 0:22:00
Setup and adjustmentsMean event duration22.0 minSingle extractor
Valve failure
Show verbatim quote (Table 6 (Changeover activities))
Valve failure: 0:13:00
Setup and adjustmentsMean event duration13.0 minSingle extractor
Flush with butter
Show verbatim quote (Table 6 (Changeover activities))
Flush with butter: 0:06:00
Setup and adjustmentsMean event duration6.00 minSingle extractor
Exchange of molds
Show verbatim quote (Table 6 (Changeover activities))
Exchange of molds: 0:04:00
Setup and adjustmentsMean event duration4.00 minSingle extractor
Forming of molds
Show verbatim quote (Table 6 (Changeover activities))
Forming of molds: 0:07:00
Setup and adjustmentsMean event duration7.00 minSingle extractor
Blowing the front of the bass
Show verbatim quote (Table 6 (Changeover activities))
Blowing the front of the bass: 0:06:00
Setup and adjustmentsMean event duration6.00 minSingle extractor
Start of production
Show verbatim quote (Table 6 (Changeover activities))
Start of production: 0:03:00
Setup and adjustmentsMean event duration3.00 minSingle extractor
First good form
Show verbatim quote (Table 6 (Changeover activities))
First good form: 0:03:00
Setup and adjustmentsMean event duration3.00 minSingle extractor
First good product
Show verbatim quote (Table 6 (Changeover activities))
First good product: 0:27:00
Setup and adjustmentsMean event duration27.0 minSingle extractor
—
Show verbatim quote (Section 4.2, Table 8 (Financial impact of the project))
At a frequency of 58 changeovers per year and with a given number of operators and wage rates, the annual savings would be 91 thousand. CZK.
Setup and adjustmentsNumber of events58.0 eventsSingle extractor

Observation units

  • D1 line · Forming, moulding and depositing · After intervention
  • D1 line · Forming, moulding and depositing · Baseline
  • Whole plant · Whole line or unspecified equipment · Baseline