Start-up losses (reduced yield)

Startup yield loss in forming (blow moulding)

Start-up losses (reduced yield)QualityForming, moulding and depositing

In short

It appears in fewer than 1 of every 100 lines studied.

When it appears, it takes on average about 47 % of the line's lost time. Reported by 0 of the 76 studies that could observe it (sparse evidence).

What happens

After a stop or at the beginning of a run, the forming (blow moulding) machine needs time to reach stable mould temperature, air pressure and cycle timing; preforms or containers produced before these parameters stabilize are undersized, deformed, have thin walls or incomplete forming and are rejected. The loss accumulates as scrap units generated during the warm-up window rather than as downtime.

What is done about it

Define and monitor a startup ramp-up procedure with process-variable interlocks (mould temperature, air pressure) that hold the machine in a non-saleable or purge mode until setpoints are reached, and track startup scrap separately to shorten warm-up time through preheating or standby conditioning.

Practical guidance written from engineering knowledge; it is not a statistical estimate.

1Probability and evidence

Pooled over all segments. A wide interval is a result: it states how much the evidence allows us to know.
Probability of presence
0.4% [0.0–1.3%]
Expected share of lost time
0.2% [0.0–0.6%]
Share of lost time when present
47% [28–67%]
Studies / units
76 / 96
Evidence grade
D

Grade D: 0 or 1 study; the estimate is driven by partial pooling and priors, and the wide interval is the result.

2Probability by segment

Partially pooled estimates for each industry segment.
  • Dairy products
    0.5% [0.0–1.9%]5 studies
  • Soft drinks, bottled water and juices
    0.4% [0.0–1.7%]11 studies
  • Brewing, wine and spirits
    0.5% [0.0–2.0%]0 studies
  • Bakery and pasta
    0.4% [0.0–1.7%]25 studies
  • Meat, poultry and seafood
    0.5% [0.0–2.0%]3 studies
  • Fruit and vegetable processing
    0.5% [0.0–2.0%]3 studies
  • Grain and oilseed milling
    0.5% [0.0–1.9%]0 studies
  • Sugar and confectionery
    0.4% [0.0–1.8%]8 studies
  • Snacks, coffee, tea and other foods
    0.4% [0.0–1.8%]7 studies
  • Animal feed and pet food
    0.4% [0.0–1.8%]6 studies
  • Food manufacturing (unspecified or mixed)
    0.5% [0.0–1.9%]8 studies

3Mechanism, SCADA signature and countermeasure

Engineering guidance that helps recognise and address the cause; it is not part of the statistical estimate.

Mechanism

Engineering guidance

After a stop or at the beginning of a run, the forming (blow moulding) machine needs time to reach stable mould temperature, air pressure and cycle timing; preforms or containers produced before these parameters stabilize are undersized, deformed, have thin walls or incomplete forming and are rejected. The loss accumulates as scrap units generated during the warm-up window rather than as downtime.

How it looks in SCADA data

Engineering guidance

SCADA/MES shows the forming machine running (machine state = production) immediately after a startup or format change while reject/quality counters spike and first-pass yield is depressed for a limited number of cycles; mould and air temperature/pressure trends are still ramping toward setpoint during this window, and the condition clears once process variables stabilize within band.

Countermeasure

Engineering guidance

Define and monitor a startup ramp-up procedure with process-variable interlocks (mould temperature, air pressure) that hold the machine in a non-saleable or purge mode until setpoints are reached, and track startup scrap separately to shorten warm-up time through preheating or standby conditioning.

4Sources

Every extracted datum with its study, value and verbatim quote.
  1. Share of lost time: 0 % · as reported: “Reduce Yield”
    Show verbatim quote
    Rata - rata 6,10 0,95 11,47 0,00 0,00 0,21