Startup yield loss in forming (blow moulding)
In short
It appears in fewer than 1 of every 100 lines studied.
When it appears, it takes on average about 47 % of the line's lost time. Reported by 0 of the 76 studies that could observe it (sparse evidence).
What happens
After a stop or at the beginning of a run, the forming (blow moulding) machine needs time to reach stable mould temperature, air pressure and cycle timing; preforms or containers produced before these parameters stabilize are undersized, deformed, have thin walls or incomplete forming and are rejected. The loss accumulates as scrap units generated during the warm-up window rather than as downtime.
What is done about it
Define and monitor a startup ramp-up procedure with process-variable interlocks (mould temperature, air pressure) that hold the machine in a non-saleable or purge mode until setpoints are reached, and track startup scrap separately to shorten warm-up time through preheating or standby conditioning.
Practical guidance written from engineering knowledge; it is not a statistical estimate.
1Probability and evidence
- Probability of presence
- 0.4% [0.0–1.3%]
- Expected share of lost time
- 0.2% [0.0–0.6%]
- Share of lost time when present
- 47% [28–67%]
- Studies / units
- 76 / 96
- Evidence grade
- D
Grade D: 0 or 1 study; the estimate is driven by partial pooling and priors, and the wide interval is the result.
2Probability by segment
- Dairy products0.5% [0.0–1.9%]5 studies
- Soft drinks, bottled water and juices0.4% [0.0–1.7%]11 studies
- Brewing, wine and spirits0.5% [0.0–2.0%]0 studies
- Bakery and pasta0.4% [0.0–1.7%]25 studies
- Meat, poultry and seafood0.5% [0.0–2.0%]3 studies
- Fruit and vegetable processing0.5% [0.0–2.0%]3 studies
- Grain and oilseed milling0.5% [0.0–1.9%]0 studies
- Sugar and confectionery0.4% [0.0–1.8%]8 studies
- Snacks, coffee, tea and other foods0.4% [0.0–1.8%]7 studies
- Animal feed and pet food0.4% [0.0–1.8%]6 studies
- Food manufacturing (unspecified or mixed)0.5% [0.0–1.9%]8 studies
3Mechanism, SCADA signature and countermeasure
Mechanism
Engineering guidanceAfter a stop or at the beginning of a run, the forming (blow moulding) machine needs time to reach stable mould temperature, air pressure and cycle timing; preforms or containers produced before these parameters stabilize are undersized, deformed, have thin walls or incomplete forming and are rejected. The loss accumulates as scrap units generated during the warm-up window rather than as downtime.
How it looks in SCADA data
Engineering guidanceSCADA/MES shows the forming machine running (machine state = production) immediately after a startup or format change while reject/quality counters spike and first-pass yield is depressed for a limited number of cycles; mould and air temperature/pressure trends are still ramping toward setpoint during this window, and the condition clears once process variables stabilize within band.
Countermeasure
Engineering guidanceDefine and monitor a startup ramp-up procedure with process-variable interlocks (mould temperature, air pressure) that hold the machine in a non-saleable or purge mode until setpoints are reached, and track startup scrap separately to shorten warm-up time through preheating or standby conditioning.
4Sources
- Analisis Total Productive Maintenance (TPM) dengan Menggunakan Metode Overall Equipment Effectiveness (OEE) pada Mesin Blowing (2025)Open sourceShare of lost time: 0 % · as reported: “Reduce Yield”
Show verbatim quote
Rata - rata 6,10 0,95 11,47 0,00 0,00 0,21