Analisis Total Productive Maintenance (TPM) dengan Menggunakan Metode Overall Equipment Effectiveness (OEE) pada Mesin Blowing

Open source

1Bibliographic record

Authors
Mochammad Rizal Ardiansyah, Nuriyanto Nuriyanto
Year
2025
Venue
Jurnal Teknik Industri Terintegrasi
Country
—
Segment
Soft drinks, bottled water and juices
Process family
Filling and packaging line
Study type
Single case study
Extraction scope
Full text
Size
1 plants · 1 lines · 1 machines
Observation period
28 days
Data collection
manual_logs
Intervention
Show the setting as described by the study
penelitian ini difokuskan pada mesin Blowing, yang merupakan salah satu mesin utama dalam proses produksi di PT. XYZ

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 13Low risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described.2 / 2
Is the observation period long enough and reported?Period reported but shorter than 30 days, or only the number of shifts is given.1 / 2
How were loss data collected?Manual logs or maintenance records with unknown completeness.1 / 2
Are OEE, loading time and the loss categories defined explicitly?Formulae or definitions are given for the reported metrics, including what counts as planned time.2 / 2
Does the loss breakdown account for the total loss it claims to explain?Only the top causes are reported and the unexplained remainder can be computed.1 / 2
Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method.2 / 2
Are the reported numbers internally consistent?Recomputed totals, shares and OEE factors agree with the reported values within 2 percentage points.2 / 2
Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result.2 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
Mold Safety Cam ClosureMesin Blowing
Show verbatim quote (Tabel 9)
Mold Safety Cam Closure 135
Not classifiable from the reportLost time135 menitAdjudicated
Oven Wheel IntervensionMesin Blowing
Show verbatim quote (Tabel 9)
Oven Wheel Intervension 149
Not classifiable from the reportLost time149 menitAdjudicated
Bottle Fallen MoldMesin Blowing
Show verbatim quote (Tabel 9)
Bottle Fallen Mold 253
Idling and minor stops (micro-stops)Lost time253 menitBoth extractors agreed
—Mesin Blowing
Show verbatim quote (Tabel 7)
Rata - Rata 93,90 90,79 99,77 84,99 85% Tidak memenuhi standart
noneOEE85.0 %Both extractors agreed
—Mesin Blowing
Show verbatim quote (Tabel 6)
Rata - rata 2207238 5322 99,76 99% Memenuhi Standart
noneQuality99.8 %Both extractors agreed
—Mesin Blowing
Show verbatim quote (Tabel 5)
Rata - rata 2207238 0,003 7294 90,79 95% Tidak Memenuhi standart
nonePerformance90.8 %Both extractors agreed
—Mesin Blowing
Show verbatim quote (Tabel 4)
Rata - rata 7765 7294 93,90 90% Memenuhi Standart
noneAvailability93.9 %Both extractors agreed
Bottle Not EkstrakMesin Blowing
Show verbatim quote (Tabel 9)
Bottle Not Ekstrak 587
Idling and minor stops (micro-stops)Lost time587 menitBoth extractors agreed
Equipment Failure LossesMesin Blowing
Show verbatim quote (Tabel 8)
Rata - rata 6,10 0,95 11,47 0,00 0,00 0,21
Equipment failure (breakdowns)Share of lost time6.10 %Single extractor
Set Up & Adjustment LossesMesin Blowing
Show verbatim quote (Tabel 8)
Rata - rata 6,10 0,95 11,47 0,00 0,00 0,21
Setup and adjustmentsShare of lost time0.950 %Single extractor
Idling & Minor Stoppage LossesMesin Blowing
Show verbatim quote (Tabel 8)
Rata - rata 6,10 0,95 11,47 0,00 0,00 0,21
Idling and minor stops (micro-stops)Share of lost time11.5 %Single extractor
Reduce Speed LossesMesin Blowing
Show verbatim quote (Tabel 8)
Rata - rata 6,10 0,95 11,47 0,00 0,00 0,21
Reduced speedShare of lost time0 %Single extractor
Reduce YieldMesin Blowing
Show verbatim quote (Tabel 8)
Rata - rata 6,10 0,95 11,47 0,00 0,00 0,21
Start-up losses (reduced yield)Share of lost time0 %Single extractor
Product Defect LossesMesin Blowing
Show verbatim quote (Tabel 8)
Rata - rata 6,10 0,95 11,47 0,00 0,00 0,21
Process defects (scrap and rework)Share of lost time0.210 %Single extractor
Downtime TerencanaMesin Blowing
Show verbatim quote (Tabel 1 (Data Produksi dan Downtime Week 47-50 2024))
Rata - rata 2207238 2500000 5322 0,0030 156 470,75
Planned downtime (scheduled maintenance, breaks, no demand)Lost time156 menitSingle extractor
Downtime Tidak TerencanaMesin Blowing
Show verbatim quote (Tabel 1 (Data Produksi dan Downtime Week 47-50 2024))
Rata - rata 2207238 2500000 5322 0,0030 156 470,75
Not classifiable from the reportLost time471 menitSingle extractor
—Mesin Blowing
Show verbatim quote (Bagian 1. Pendahuluan)
Jika dibandingkan dengan total plan time sebesar 31.680 menit, downtime pada mesin Blowing mencapai 3,54%, menunjukkan bahwa mesin ini memiliki kontribusi signifikan terhadap total kehilangan waktu produksi.
Not classifiable from the reportShare of planned time3.54 %Single extractor
—Mesin Blowing
Show verbatim quote (Bagian 1. Pendahuluan)
tercatat bahwa mesin Blowing mengalami downtime selama 1.124 menit, yang merupakan jumlah waktu henti tertinggi dibandingkan area produksi lainnya
Not classifiable from the reportLost time1,124 menitSingle extractor
Bottle Not EkstrakMesin Blowing
Show verbatim quote (Analisa Data - Diagram Pareto)
hasil dari diagram pareto menunjukkan bahwa jenis downtime terbesar adalah Bottle Not Ektrak, yang mencakup 52% dari total waktu henti mesin.
Idling and minor stops (micro-stops)Share of lost time52.0 %Single extractor
—Autopacker
Show verbatim quote (Tabel 1. Data Downtime W47-50)
Autopacker 226 0,71%
Not classifiable from the reportLost time226 menitSingle extractor
—Autopacker
Show verbatim quote (Tabel 1. Data Downtime W47-50)
Autopacker 226 0,71%
Not classifiable from the reportShare of planned time0.710 %Single extractor
—Palletizer
Show verbatim quote (Tabel 1. Data Downtime W47-50)
Palletizer 215 0,67%
Not classifiable from the reportLost time215 menitSingle extractor
—Palletizer
Show verbatim quote (Tabel 1. Data Downtime W47-50)
Palletizer 215 0,67%
Not classifiable from the reportShare of planned time0.670 %Single extractor
—Label
Show verbatim quote (Tabel 1. Data Downtime W47-50)
Label 159 0,50%
Not classifiable from the reportLost time159 menitSingle extractor
—Label
Show verbatim quote (Tabel 1. Data Downtime W47-50)
Label 159 0,50%
Not classifiable from the reportShare of planned time0.500 %Single extractor
—Filling
Show verbatim quote (Tabel 1. Data Downtime W47-50)
Filling 159 0,50%
Not classifiable from the reportLost time159 menitSingle extractor
—Filling
Show verbatim quote (Tabel 1. Data Downtime W47-50)
Filling 159 0,50%
Not classifiable from the reportShare of planned time0.500 %Single extractor
—
Show verbatim quote (Table 8. Perhitungan Six Big Loss W47 – 50 2024)
Rata - rata 6,10 0,95 11,47 0,00 0,00 0,21
Equipment failure (breakdowns)Share of planned time6.10 %Single extractor
—
Show verbatim quote (Table 8. Perhitungan Six Big Loss W47 – 50 2024)
Rata - rata 6,10 0,95 11,47 0,00 0,00 0,21
Setup and adjustmentsShare of planned time0.950 %Single extractor
—
Show verbatim quote (Table 8. Perhitungan Six Big Loss W47 – 50 2024)
Rata - rata 6,10 0,95 11,47 0,00 0,00 0,21
Idling and minor stops (micro-stops)Share of planned time11.5 %Single extractor
—
Show verbatim quote (Table 8. Perhitungan Six Big Loss W47 – 50 2024)
Rata - rata 6,10 0,95 11,47 0,00 0,00 0,21
Process defects (scrap and rework)Share of planned time0.210 %Single extractor

Observation units

  • Mesin Blowing · Forming, moulding and depositing · Baseline
  • Autopacker · Packaging (forming, sealing, wrapping, case packing, palletizing) · Baseline
  • Palletizer · Packaging (forming, sealing, wrapping, case packing, palletizing) · Baseline
  • Label · Labeling and coding · Baseline
  • Filling · Filling · Baseline
  • Blowing · Forming, moulding and depositing · Baseline