Inefficient maintenance spare parts inventory management
In short
It appears in about 1 of every 100 lines studied.
When it appears, it takes on average about 56 % of the line's lost time. Reported by 1 of the 127 studies that could observe it (sparse evidence).
What happens
Lack of a structured policy for stocking and controlling maintenance spare parts leads either to excess inventory that raises carrying costs or to stockouts that force production to wait for parts when equipment fails. This organizational gap is not tied to a specific machine but affects the responsiveness of the whole maintenance function.
What is done about it
Implement a structured spare parts management system with ABC/criticality classification, defined min-max stock levels and reorder points, and integration with the CMMS to balance inventory holding cost against the risk of stockout-driven downtime.
Practical guidance written from engineering knowledge; it is not a statistical estimate.
1Probability and evidence
- Probability of presence
- 0.5% [0.1–1.5%]
- Expected share of lost time
- 0.3% [0.1–0.8%]
- Share of lost time when present
- 56% [45–67%]
- Studies / units
- 127 / 161
- Evidence grade
- D
Grade D: 0 or 1 study; the estimate is driven by partial pooling and priors, and the wide interval is the result.
2Probability by segment
- Dairy products0.6% [0.1–2.4%]13 studies
- Soft drinks, bottled water and juices0.6% [0.1–1.9%]26 studies
- Brewing, wine and spirits0.9% [0.1–3.3%]11 studies
- Bakery and pasta0.6% [0.1–1.9%]24 studies
- Meat, poultry and seafood0.6% [0.1–2.3%]9 studies
- Fruit and vegetable processing0.6% [0.1–2.4%]7 studies
- Grain and oilseed milling0.7% [0.1–2.4%]6 studies
- Sugar and confectionery0.6% [0.1–2.2%]9 studies
- Snacks, coffee, tea and other foods0.6% [0.1–2.3%]5 studies
- Animal feed and pet food0.6% [0.1–2.2%]7 studies
- Food manufacturing (unspecified or mixed)0.6% [0.1–2.3%]10 studies
3Mechanism, SCADA signature and countermeasure
Mechanism
Engineering guidanceLack of a structured policy for stocking and controlling maintenance spare parts leads either to excess inventory that raises carrying costs or to stockouts that force production to wait for parts when equipment fails. This organizational gap is not tied to a specific machine but affects the responsiveness of the whole maintenance function.
How it looks in SCADA data
Engineering guidanceSCADA/MES does not capture this cause directly; it appears indirectly as abnormally long repair or waiting-for-parts states in maintenance work orders, extended downtime durations for otherwise simple failures, and recurring equipment_failure stops whose duration is inconsistent with the nature of the fault.
Countermeasure
Engineering guidanceImplement a structured spare parts management system with ABC/criticality classification, defined min-max stock levels and reorder points, and integration with the CMMS to balance inventory holding cost against the risk of stockout-driven downtime.
4Sources
- Implementation of Computerized Maintenance and Management System in Wine Factory in Ethiopia: A Case Study (2020)Open sourceShare of lost time: 13.0 % · as reported: “high cost of maintenance inventory control, and other”
Show verbatim quote
the main causes of the losses in production are stated as mechanical failure in washing section which covers the largest portion (35%), maintenance strategy followed by the plant (27%), maintenance management program (25%), and high cost of maintenance inventory control, and other (13%).