In short

It appears in about 1 of every 100 lines studied.

When it appears, it takes on average about 62 % of the line's lost time. Reported by 0 of the 43 studies that could observe it (sparse evidence).

What happens

The milling train is designed or able to process raw material at a certain nominal throughput, but the upstream supply of material (harvesting, transport, yard logistics or feed conveying) delivers less than that rate, so the mill runs continuously but below its ideal processing speed. The equipment itself is healthy; the loss is a mismatch between installed milling capacity and the actual material feed available at any given time.

What is done about it

Synchronize raw-material supply logistics (harvest scheduling, transport fleet, yard stock) with installed milling capacity, or temporarily reduce mill speed/throughput target to match sustainable feed rate and avoid idling losses; where supply variability is structural, add buffer storage or staging capacity to smooth the feed into the mill.

Practical guidance written from engineering knowledge; it is not a statistical estimate.

1Probability and evidence

Pooled over all segments. A wide interval is a result: it states how much the evidence allows us to know.
Probability of presence
0.7% [0.1–2.4%]
Expected share of lost time
0.5% [0.1–1.5%]
Share of lost time when present
62% [48–74%]
Studies / units
43 / 48
Evidence grade
D

Grade D: 0 or 1 study; the estimate is driven by partial pooling and priors, and the wide interval is the result.

2Probability by segment

Partially pooled estimates for each industry segment.
  • Dairy products
    0.9% [0.1–3.5%]5 studies
  • Soft drinks, bottled water and juices
    0.9% [0.1–3.6%]1 study
  • Brewing, wine and spirits
    0.9% [0.1–3.5%]0 studies
  • Bakery and pasta
    0.9% [0.1–4.1%]0 studies
  • Meat, poultry and seafood
    0.9% [0.1–3.9%]0 studies
  • Fruit and vegetable processing
    0.9% [0.1–3.8%]2 studies
  • Grain and oilseed milling
    0.8% [0.1–3.3%]7 studies
  • Sugar and confectionery
    0.8% [0.1–3.1%]10 studies
  • Snacks, coffee, tea and other foods
    0.8% [0.1–3.1%]5 studies
  • Animal feed and pet food
    0.8% [0.1–3.5%]6 studies
  • Food manufacturing (unspecified or mixed)
    0.8% [0.1–3.6%]7 studies

3Mechanism, SCADA signature and countermeasure

Engineering guidance that helps recognise and address the cause; it is not part of the statistical estimate.

Mechanism

Engineering guidance

The milling train is designed or able to process raw material at a certain nominal throughput, but the upstream supply of material (harvesting, transport, yard logistics or feed conveying) delivers less than that rate, so the mill runs continuously but below its ideal processing speed. The equipment itself is healthy; the loss is a mismatch between installed milling capacity and the actual material feed available at any given time.

How it looks in SCADA data

Engineering guidance

SCADA/MES shows the mill in a continuous running state with motor load, crusher torque or throughput (tons/hour) persistently below the nominal design setpoint while no fault or stop alarms are active; upstream feed conveyor speed, hopper level or raw-material arrival signals correlate with the depressed throughput, confirming a supply-limited rather than equipment-limited condition.

Countermeasure

Engineering guidance

Synchronize raw-material supply logistics (harvest scheduling, transport fleet, yard stock) with installed milling capacity, or temporarily reduce mill speed/throughput target to match sustainable feed rate and avoid idling losses; where supply variability is structural, add buffer storage or staging capacity to smooth the feed into the mill.

4Sources

Every extracted datum with its study, value and verbatim quote.
  1. Mean event duration: 142 min · as reported: “EXCM (Excesso de capacidade de moagem - excesso de processamento)”
    Show verbatim quote
    EXCM 23 142,3 205,8 42339,1 51,0
  2. Number of events: 23.0 events · as reported: “EXCM (Excesso de capacidade de moagem - excesso de processamento)”
    Show verbatim quote
    EXCM 23 142,3 205,8 42339,1 51,0
  3. Mean event duration: 198 min · as reported: “Excesso Capacidade de Mo”
    Show verbatim quote
    Excesso Capacidade de Mo 3 198,0 270,0 72750,0 60,0
  4. Number of events: 3.00 events · as reported: “Excesso Capacidade de Mo”
    Show verbatim quote
    Excesso Capacidade de Mo 3 198,0 270,0 72750,0 60,0