Overnight production suspension
In short
It appears in about 1 of every 100 lines studied.
When it appears, it takes on average about 59 % of the line's lost time. Reported by 1 of the 76 studies that could observe it (sparse evidence).
What happens
An organizational decision halts the forming operation before it can be completed or resumed, so the line is left idle until the next working day rather than restarted within the same shift. This typically stems from scheduling, staffing, material supply or demand constraints rather than an equipment malfunction.
What is done about it
Improve production and material planning so that operations scheduled for a given day can be completed or properly closed out without an unplanned overnight gap, including better coordination of raw material availability, staffing and order sequencing. Where overnight suspension is unavoidable, standardize shutdown and restart procedures to minimize the yield and time impact of the interruption.
Practical guidance written from engineering knowledge; it is not a statistical estimate.
1Probability and evidence
- Probability of presence
- 0.7% [0.1–1.9%]
- Expected share of lost time
- 0.4% [0.1–1.1%]
- Share of lost time when present
- 59% [49–70%]
- Studies / units
- 76 / 96
- Evidence grade
- D
Grade D: 0 or 1 study; the estimate is driven by partial pooling and priors, and the wide interval is the result.
2Probability by segment
- Dairy products0.8% [0.1–2.8%]5 studies
- Soft drinks, bottled water and juices0.8% [0.1–2.8%]11 studies
- Brewing, wine and spirits0.8% [0.1–3.1%]0 studies
- Bakery and pasta1.0% [0.1–3.2%]25 studies
- Meat, poultry and seafood0.8% [0.1–3.1%]3 studies
- Fruit and vegetable processing0.8% [0.1–2.8%]3 studies
- Grain and oilseed milling0.8% [0.1–3.1%]0 studies
- Sugar and confectionery0.8% [0.1–2.8%]8 studies
- Snacks, coffee, tea and other foods0.8% [0.1–2.8%]7 studies
- Animal feed and pet food0.8% [0.1–3.0%]6 studies
- Food manufacturing (unspecified or mixed)0.8% [0.1–2.9%]8 studies
3Mechanism, SCADA signature and countermeasure
Mechanism
Engineering guidanceAn organizational decision halts the forming operation before it can be completed or resumed, so the line is left idle until the next working day rather than restarted within the same shift. This typically stems from scheduling, staffing, material supply or demand constraints rather than an equipment malfunction.
How it looks in SCADA data
Engineering guidanceSCADA/MES logs show the forming station transitioning to an idle or stopped state with no alarms and no production counts, and that state persists across the shift boundary into the next calendar day before any new cycle starts. Downtime reports classify the gap as a planned or organizational stop rather than a fault-triggered event.
Countermeasure
Engineering guidanceImprove production and material planning so that operations scheduled for a given day can be completed or properly closed out without an unplanned overnight gap, including better coordination of raw material availability, staffing and order sequencing. Where overnight suspension is unavoidable, standardize shutdown and restart procedures to minimize the yield and time impact of the interruption.
4Sources
- Modelo propuesto para la implementación de la metodología SMED en una empresa de alimentos de Santiago de Cali (2017)Open sourceLost time: 900 min · as reported: “Suspensión de operación hasta el día siguiente”
Show verbatim quote
Suspensión de operación hasta el día siguiente | 900