In short
It appears in about 1 of every 100 lines studied.
When it appears, it takes on average about 56 % of the line's lost time. Reported by 2 of the 59 studies that could observe it (sparse evidence).
What happens
The extrusion line stands idle because raw material is not available or not delivered to the feeding point in time, due to upstream supply, logistics or inventory planning gaps rather than a machine fault. The equipment itself remains functional but cannot run without feedstock.
What is done about it
Improve raw material planning and buffer stock management, coordinate delivery schedules with production demand, and set up early-warning alerts on hopper or silo level to trigger replenishment before depletion.
Practical guidance written from engineering knowledge; it is not a statistical estimate.
1Probability and evidence
- Probability of presence
- 0.8% [0.1–2.4%]
- Expected share of lost time
- 0.5% [0.1–1.4%]
- Share of lost time when present
- 56% [45–66%]
- Studies / units
- 59 / 72
- Evidence grade
- D
Grade D: 0 or 1 study; the estimate is driven by partial pooling and priors, and the wide interval is the result.
2Probability by segment
- Dairy products1.0% [0.1–4.0%]5 studies
- Soft drinks, bottled water and juices1.0% [0.1–3.8%]1 study
- Brewing, wine and spirits1.0% [0.1–4.2%]0 studies
- Bakery and pasta0.8% [0.1–3.0%]23 studies
- Meat, poultry and seafood1.0% [0.1–4.2%]2 studies
- Fruit and vegetable processing1.0% [0.1–4.0%]2 studies
- Grain and oilseed milling1.0% [0.1–4.0%]0 studies
- Sugar and confectionery0.9% [0.1–3.6%]8 studies
- Snacks, coffee, tea and other foods0.9% [0.1–3.5%]5 studies
- Animal feed and pet food1.4% [0.1–5.7%]6 studies
- Food manufacturing (unspecified or mixed)1.0% [0.1–3.8%]7 studies
3Mechanism, SCADA signature and countermeasure
Mechanism
Engineering guidanceThe extrusion line stands idle because raw material is not available or not delivered to the feeding point in time, due to upstream supply, logistics or inventory planning gaps rather than a machine fault. The equipment itself remains functional but cannot run without feedstock.
How it looks in SCADA data
Engineering guidanceExtended machine idle or standby state with no fault alarm active, often preceded by low or empty raw material buffer/hopper level readings and zero feed rate signals. Downstream stations show starvation while upstream feeding sensors indicate empty condition.
Countermeasure
Engineering guidanceImprove raw material planning and buffer stock management, coordinate delivery schedules with production demand, and set up early-warning alerts on hopper or silo level to trigger replenishment before depletion.
4Sources
- การเพิ่มผลผลิตด้วยวิธีการปรับปรุงประสิทธิผลโดยรวมของเครื่องจักร : กรณีศึกษา โรงงานผลิตอาหารสัตว์ (2010)Open sourceLost time: 10.1 h · as reported: “Waiting Time for raw material (รอวัตถุดิบ)”
Show verbatim quote
รอวัตถุดิบ(Waiting Time) 10.08
- การเพิ่มผลผลิตด้วยวิธีการปรับปรุงประสิทธิผลโดยรวมของเครื่องจักร : กรณีศึกษา โรงงานผลิตอาหารสัตว์ (2010)Open sourceLost time: 150 h · as reported: “Waiting Time”
Show verbatim quote
Bre ak D ow n Machine Adjus tme nt Die Ch an ge Waiting Time C lea rline 38.33 105.00 112.17 149.83 181.67 6.5 17.9 19.1 25.5 30.9 100.0 93.5 75.6 56.5 30.9
- การเพิ่มผลผลิตด้วยวิธีการปรับปรุงประสิทธิผลโดยรวมของเครื่องจักร : กรณีศึกษา โรงงานผลิตอาหารสัตว์ (2010)Open sourceShare of lost time: 25.5 % · as reported: “Waiting Time”
Show verbatim quote
Bre ak D ow n Machine Adjus tme nt Die Ch an ge Waiting Time C lea rline 38.33 105.00 112.17 149.83 181.67 6.5 17.9 19.1 25.5 30.9 100.0 93.5 75.6 56.5 30.9

