foratvise
Get Started
organizational external

Waiting for raw material supply

organizational externalExtrusion

In short

It appears in about 1 of every 100 lines studied.

When it appears, it takes on average about 56 % of the line's lost time. Reported by 2 of the 59 studies that could observe it (sparse evidence).

What happens

The extrusion line stands idle because raw material is not available or not delivered to the feeding point in time, due to upstream supply, logistics or inventory planning gaps rather than a machine fault. The equipment itself remains functional but cannot run without feedstock.

What is done about it

Improve raw material planning and buffer stock management, coordinate delivery schedules with production demand, and set up early-warning alerts on hopper or silo level to trigger replenishment before depletion.

Practical guidance written from engineering knowledge; it is not a statistical estimate.

1Probability and evidence

Pooled over all segments. A wide interval is a result: it states how much the evidence allows us to know.
Probability of presence
0.8% [0.1–2.4%]
Expected share of lost time
0.5% [0.1–1.4%]
Share of lost time when present
56% [45–66%]
Studies / units
59 / 72
Evidence grade
D

Grade D: 0 or 1 study; the estimate is driven by partial pooling and priors, and the wide interval is the result.

2Probability by segment

Partially pooled estimates for each industry segment.
  • Dairy products
    1.0% [0.1–4.0%]5 studies
  • Soft drinks, bottled water and juices
    1.0% [0.1–3.8%]1 study
  • Brewing, wine and spirits
    1.0% [0.1–4.2%]0 studies
  • Bakery and pasta
    0.8% [0.1–3.0%]23 studies
  • Meat, poultry and seafood
    1.0% [0.1–4.2%]2 studies
  • Fruit and vegetable processing
    1.0% [0.1–4.0%]2 studies
  • Grain and oilseed milling
    1.0% [0.1–4.0%]0 studies
  • Sugar and confectionery
    0.9% [0.1–3.6%]8 studies
  • Snacks, coffee, tea and other foods
    0.9% [0.1–3.5%]5 studies
  • Animal feed and pet food
    1.4% [0.1–5.7%]6 studies
  • Food manufacturing (unspecified or mixed)
    1.0% [0.1–3.8%]7 studies

3Mechanism, SCADA signature and countermeasure

Engineering guidance that helps recognise and address the cause; it is not part of the statistical estimate.

Mechanism

Engineering guidance

The extrusion line stands idle because raw material is not available or not delivered to the feeding point in time, due to upstream supply, logistics or inventory planning gaps rather than a machine fault. The equipment itself remains functional but cannot run without feedstock.

How it looks in SCADA data

Engineering guidance

Extended machine idle or standby state with no fault alarm active, often preceded by low or empty raw material buffer/hopper level readings and zero feed rate signals. Downstream stations show starvation while upstream feeding sensors indicate empty condition.

Countermeasure

Engineering guidance

Improve raw material planning and buffer stock management, coordinate delivery schedules with production demand, and set up early-warning alerts on hopper or silo level to trigger replenishment before depletion.

4Sources

Every extracted datum with its study, value and verbatim quote.
  1. Lost time: 10.1 h · as reported: “Waiting Time for raw material (รอวัตถุดิบ)”
    Show verbatim quote
    รอวัตถุดิบ(Waiting Time) 10.08
  2. Lost time: 150 h · as reported: “Waiting Time”
    Show verbatim quote
    Bre ak D ow n Machine Adjus tme nt Die Ch an ge Waiting Time C lea rline 38.33 105.00 112.17 149.83 181.67 6.5 17.9 19.1 25.5 30.9 100.0 93.5 75.6 56.5 30.9
  3. Share of lost time: 25.5 % · as reported: “Waiting Time”
    Show verbatim quote
    Bre ak D ow n Machine Adjus tme nt Die Ch an ge Waiting Time C lea rline 38.33 105.00 112.17 149.83 181.67 6.5 17.9 19.1 25.5 30.9 100.0 93.5 75.6 56.5 30.9