Scheduled maintenance and cleaning stop (excluded from OEE)
In short
It appears in about 1 of every 100 lines studied.
When it appears, it takes on average about 57 % of the line's lost time. Reported by 1 of the 127 studies that could observe it (sparse evidence).
What happens
The line is deliberately stopped according to a schedule to carry out preventive maintenance tasks or sanitation and line cleaning, and may also include other administrative or externally imposed stoppages that fall outside the direct responsibility of production management. Because these stops are anticipated and planned in advance, they are treated as a baseline reduction of available time rather than as a performance loss.
What is done about it
The usual engineering practice is to schedule these stops during periods of low demand, codify them clearly as planned events in the SCADA/MES calendar so they are excluded from availability loss calculations, and periodically audit their actual duration against the plan to prevent drift into unplanned downtime.
Practical guidance written from engineering knowledge; it is not a statistical estimate.
1Probability and evidence
- Probability of presence
- 0.6% [0.1–1.5%]
- Expected share of lost time
- 0.3% [0.1–0.9%]
- Share of lost time when present
- 57% [46–68%]
- Studies / units
- 127 / 161
- Evidence grade
- D
Grade D: 0 or 1 study; the estimate is driven by partial pooling and priors, and the wide interval is the result.
2Probability by segment
- Dairy products0.6% [0.1–2.3%]13 studies
- Soft drinks, bottled water and juices0.6% [0.1–1.9%]26 studies
- Brewing, wine and spirits0.6% [0.1–2.3%]11 studies
- Bakery and pasta0.6% [0.1–2.0%]24 studies
- Meat, poultry and seafood0.6% [0.1–2.4%]9 studies
- Fruit and vegetable processing0.7% [0.1–2.4%]7 studies
- Grain and oilseed milling1.0% [0.1–3.6%]6 studies
- Sugar and confectionery0.6% [0.1–2.3%]9 studies
- Snacks, coffee, tea and other foods0.6% [0.1–2.4%]5 studies
- Animal feed and pet food0.6% [0.1–2.3%]7 studies
- Food manufacturing (unspecified or mixed)0.6% [0.1–2.4%]10 studies
3Mechanism, SCADA signature and countermeasure
Mechanism
Engineering guidanceThe line is deliberately stopped according to a schedule to carry out preventive maintenance tasks or sanitation and line cleaning, and may also include other administrative or externally imposed stoppages that fall outside the direct responsibility of production management. Because these stops are anticipated and planned in advance, they are treated as a baseline reduction of available time rather than as a performance loss.
How it looks in SCADA data
Engineering guidanceSCADA/MES records show a line state explicitly tagged as planned stop, maintenance or cleaning, with start and end times aligned to the maintenance or sanitation schedule rather than triggered by a fault alarm. Production and fault counters remain flat during this interval, and no starvation or blocking pattern appears on upstream or downstream equipment.
Countermeasure
Engineering guidanceThe usual engineering practice is to schedule these stops during periods of low demand, codify them clearly as planned events in the SCADA/MES calendar so they are excluded from availability loss calculations, and periodically audit their actual duration against the plan to prevent drift into unplanned downtime.
4Sources
- Análise da aplicação de indicadores alternativos ao Overall Equipment Effectiveness (OEE) na gestão do desempenho global de uma fábricaOpen sourceShare of lost time: 17.6 % · as reported: “Paradas planejadas (g1) - manutenção preventiva e limpeza de linha”
Show verbatim quote
Perdas por paradas planejadas (g1) por causas como manutenção preventiva e limpeza de linha que representavam cerca de 17,6% do tempo total de paradas;
- Análise da aplicação de indicadores alternativos ao Overall Equipment Effectiveness (OEE) na gestão do desempenho global de uma fábricaOpen sourceShare of lost time: 71.0 % · as reported: “Causas não consideradas pelo OEEL (a1, b3, e5, g1)”
Show verbatim quote
as causas que provocavam paradas não consideradas pelo OEEL (a1, b3, e5, g1) representavam 71% do tempo total de paradas, conforme mostra a Figura 6.
- Análise da aplicação de indicadores alternativos ao Overall Equipment Effectiveness (OEE) na gestão do desempenho global de uma fábricaOpen sourceLost time: 51.9 h · as reported: “Paradas planejadas e outras causas fora da responsabilidade dos gestores”
Show verbatim quote
perdas por paradas planejadas e outras causas fora da responsabilidade dos gestores da área operacional, somadas, foram responsáveis por uma perda de volume de produção maior, que se manteve em torno de 187 t por semana (51,9 horas perdidas por semana) nas fases 1 e 2.