Generic steam turbine performance loss (mixed causes)
In short
It appears in about 1 of every 100 lines studied.
When it appears, it takes on average about 58 % of the line's lost time. Reported by 1 of the 131 studies that could observe it (sparse evidence).
What happens
The steam turbine that drives utility generation experiences a mix of wear-related and organizational disturbances: blade or seal erosion and bearing wear reduce rotational efficiency, lubrication and governor adjustments are needed after stoppages, minor sensor or valve glitches interrupt steady operation, and start-up warm-up before the rotor reaches stable speed generates off-spec output. Because these mechanisms are not separated in the source records, the turbine is reported under several different loss headings without a single dominant physical driver.
What is done about it
Implement condition-based maintenance on blades, seals and bearings with vibration and temperature monitoring, standardize start-up warm-up ramps to shorten the unstable window, and separate the different loss contributors in the data collection system so each mechanism can be tracked and addressed independently rather than lumped under one generic turbine loss entry.
Practical guidance written from engineering knowledge; it is not a statistical estimate.
1Probability and evidence
- Probability of presence
- 0.6% [0.1–1.5%]
- Expected share of lost time
- 0.3% [0.1–0.9%]
- Share of lost time when present
- 58% [48–68%]
- Studies / units
- 131 / 165
- Evidence grade
- D
Grade D: 0 or 1 study; the estimate is driven by partial pooling and priors, and the wide interval is the result.
2Probability by segment
- Dairy products0.6% [0.1–2.2%]13 studies
- Soft drinks, bottled water and juices0.6% [0.1–1.9%]26 studies
- Brewing, wine and spirits0.6% [0.1–2.2%]12 studies
- Bakery and pasta0.6% [0.1–1.9%]25 studies
- Meat, poultry and seafood0.6% [0.1–2.4%]9 studies
- Fruit and vegetable processing0.7% [0.1–2.5%]7 studies
- Grain and oilseed milling0.6% [0.1–2.3%]7 studies
- Sugar and confectionery0.6% [0.1–2.3%]9 studies
- Snacks, coffee, tea and other foods0.6% [0.1–2.3%]5 studies
- Animal feed and pet food0.6% [0.1–2.3%]7 studies
- Food manufacturing (unspecified or mixed)1.0% [0.1–3.5%]11 studies
3Mechanism, SCADA signature and countermeasure
Mechanism
Engineering guidanceThe steam turbine that drives utility generation experiences a mix of wear-related and organizational disturbances: blade or seal erosion and bearing wear reduce rotational efficiency, lubrication and governor adjustments are needed after stoppages, minor sensor or valve glitches interrupt steady operation, and start-up warm-up before the rotor reaches stable speed generates off-spec output. Because these mechanisms are not separated in the source records, the turbine is reported under several different loss headings without a single dominant physical driver.
How it looks in SCADA data
Engineering guidanceSCADA/MES shows the turbine alternating between running, idle, fault and warm-up states without a consistent pattern: rotational speed trends below setpoint, intermittent short stops logged as minor stoppages, occasional fault alarms tied to maintenance work orders, and output quality flags clustered around start-up periods. No single alarm code or state duration dominates the historian trace.
Countermeasure
Engineering guidanceImplement condition-based maintenance on blades, seals and bearings with vibration and temperature monitoring, standardize start-up warm-up ramps to shorten the unstable window, and separate the different loss contributors in the data collection system so each mechanism can be tracked and addressed independently rather than lumped under one generic turbine loss entry.
4Sources
- Penerapan Total Productive Maintenance dengan menggunakan metode OEE pada turbin uap Type C5 DS II – GVS (2018)Open sourceShare of lost time: 85.4 % · as reported: “gangguan kecil dan waktu nganggur”
Show verbatim quote
Nilai gangguan kecil dan waktu nganggur 85,44 % dengan total waktu 2449,54 jam
- Penerapan Total Productive Maintenance dengan menggunakan metode OEE pada turbin uap Type C5 DS II – GVS (2018)Open sourceLost time: 2,450 jam · as reported: “gangguan kecil dan waktu nganggur”
Show verbatim quote
Nilai gangguan kecil dan waktu nganggur 85,44 % dengan total waktu 2449,54 jam
- Penerapan Total Productive Maintenance dengan menggunakan metode OEE pada turbin uap Type C5 DS II – GVS (2018)Open sourceShare of lost time: 2.52 % · as reported: “Cacat produk dalam proses”
Show verbatim quote
hasilCacat produk dalam proses2,52 % dengan total waktu 72,12 jam
- Penerapan Total Productive Maintenance dengan menggunakan metode OEE pada turbin uap Type C5 DS II – GVS (2018)Open sourceLost time: 72.1 jam · as reported: “Cacat produk dalam proses”
Show verbatim quote
hasilCacat produk dalam proses2,52 % dengan total waktu 72,12 jam
- Penerapan Total Productive Maintenance dengan menggunakan metode OEE pada turbin uap Type C5 DS II – GVS (2018)Open sourceShare of lost time: 11.6 % · as reported: “Kecepatan rendah”
Show verbatim quote
hasilKecepatan rendah 11,58 % dengan total waktu 331,88 jam
- Penerapan Total Productive Maintenance dengan menggunakan metode OEE pada turbin uap Type C5 DS II – GVS (2018)Open sourceLost time: 332 jam · as reported: “Kecepatan rendah”
Show verbatim quote
hasilKecepatan rendah 11,58 % dengan total waktu 331,88 jam
- Penerapan Total Productive Maintenance dengan menggunakan metode OEE pada turbin uap Type C5 DS II – GVS (2018)Open sourceShare of lost time: 0.380 % · as reported: “Kerusakan peralatan”
Show verbatim quote
hasil Kerusakan peralatan0,38 % dengan total waktu 11 jam
- Penerapan Total Productive Maintenance dengan menggunakan metode OEE pada turbin uap Type C5 DS II – GVS (2018)Open sourceLost time: 11.0 jam · as reported: “Kerusakan peralatan”
Show verbatim quote
hasil Kerusakan peralatan0,38 % dengan total waktu 11 jam
- Penerapan Total Productive Maintenance dengan menggunakan metode OEE pada turbin uap Type C5 DS II – GVS (2018)Open sourceShare of lost time: 0.0800 % · as reported: “Persiapan peralatan”
Show verbatim quote
hasil Persiapan peralatan 0,08 % dengan total waktu 2,41 jam
- Penerapan Total Productive Maintenance dengan menggunakan metode OEE pada turbin uap Type C5 DS II – GVS (2018)Open sourceLost time: 2.41 jam · as reported: “Persiapan peralatan”
Show verbatim quote
hasil Persiapan peralatan 0,08 % dengan total waktu 2,41 jam
- Penerapan Total Productive Maintenance dengan menggunakan metode OEE pada turbin uap Type C5 DS II – GVS (2018)Open sourceShare of lost time: 0 % · as reported: “Hasil rendah”
Show verbatim quote
hasil Hasil rendah 0