Whole plant or unspecified
Utilities (steam, compressed air, chilled water, power)
Physical model
Evidence synthesis only
This operation is covered by the evidence synthesis only; its limits are set by the operations around it.
Causes of loss in this operation
Probability that each cause is documented as a relevant loss of a line, pooled over all segments.
- Boiler breakdownEquipment failure (breakdowns)0.8% [0.2–1.9%]C131 studies
- Boiler performance degradationReduced speed0.7% [0.1–1.8%]D131 studies
- Air compressor failureEquipment failure (breakdowns)0.6% [0.1–1.6%]D131 studies
- Steam/Power Generation Utility FailureEquipment failure (breakdowns)0.6% [0.1–1.5%]D131 studies
- Generic steam turbine performance loss (mixed causes)Equipment failure (breakdowns)0.6% [0.1–1.5%]D131 studies
- Boiler startup warm-up yield lossStart-up losses (reduced yield)0.5% [0.1–1.3%]D131 studies
- Blower malfunctionEquipment failure (breakdowns)0.4% [0.1–1.1%]D131 studies
- Boiler minor stoppageIdling and minor stops (micro-stops)0.3% [0.1–1.0%]D131 studies
- Boiler changeover and adjustmentSetup and adjustments0.3% [0.1–0.9%]D131 studies
- Boiler warm-up and equipment shutdown sequence at startupSetup and adjustments0.3% [0.1–0.9%]D131 studies